References
- 25R-03. 2004. Estimating lost labor productivity in construction claims. AACE Int Recomm Pract. No. 25R-03
- Al-Kofahi ZG, Mahdavian A, Oloufa A. 2020. System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study. Int J Constr Manag. 22(7):1355–1366. https://doi.org/10.1080/15623599.2020.1711494.
- Alzraiee H, Zayed T, Moselhi O. 2015. Dynamic planning of construction activities using hybrid simulation. Autom Constr. 49:176–192.
- Chester M, Hendrickson C, Asce M. 2005. Cost impacts, scheduling impacts, and the claims process during construction. J Constr Eng Manage. 131(1):102–107.
- Cox ID, Morris JP, Rogerson JH, Jared GE. 2010. A quantitative study of post contract award design changes in construction. Constr Manag Econ. 17(4), 427–439. http://dx.doi.org/10.1080/014461999371358
- Egan JJ, Seder JE, Anderson DL. 2012. Practices in construction change order management. Cost Eng. 54(2):12.
- Finke MR. and Member 1998. A better way to estimate and mitigate disruption. J Constr Eng Manage. 124(6):490–497.
- Gulezian R, Samelian F. 2003. Baseline determination in construction labor productivity-loss claims. J Manag Eng. 19(4):160–165.
- Günhan S, Arditi D, Doyle J. 2007. Avoiding change orders in public school construction. J Prof Issues Eng Educ Pract. 133(1):67–73.
- Hanna AS, Gunduz M. 2004. Impact of change orders on small labor-intensive projects. J Constr Eng Manag. 130(5):726–733.
- Hanna AS, Iskandar KA. 2017. Quantifying and modeling the cumulative impact of change orders. J Constr Eng Manag. 143(10):04017076.
- Hanna AS, Lotfallah WB, Lee MJ. 2002. Statistical-fuzzy approach to quantify cumulative impact of change orders. J Comput Civ Eng. 16(4):252–258.
- Hanna AS, Russell JS, Nordheim EV, Bruggink MJ. 1999. Impact of change orders on labor efficiency for electrical construction. J Constr Eng Manage. 125(4):224–232.
- Ibbs W. 2012. Construction change: likelihood, severity, and impact on productivity. J Leg Aff Dispute Resolut Eng Constr. 4(3):67–73.
- Ibbs W, Liu M. 2005. Improved measured mile analysis technique. J Constr Eng Manag. 131(12):1249–1256.
- Ibbs W, Nguyen LD, Lee S. 2007. Quantified impacts of project change. J Prof Issues Eng Educ Pract. 133(1):45–52.
- Khalifa WMA, Mahamid I. 2019. Causes of change orders in construction projects. Eng Technol Appl Sci Res. 9(6):4956–4961.
- Lee H-S, Asce M, Ryu H-G, Yu J-H, Kim J-J. 2005. Method for calculating schedule delay considering lost productivity. J Constr Eng Manage. 131(11):1147–1154.
- Leonard CA. 1988. The effects of change orders on productivity (Doctoral dissertation). Montreal, CA: Concordia University.
- Love PED, Irani Z, Smith J, Regan M, Liu J. 2017. Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Prod Plan Control. 28(13): 1081–1092. http://dx.doi.org/10.1080/09537287.2017.1333647
- McEniry G, Ibbs W. 2007. The cumulative effect of change orders on labour productivity: the leonard study ‘Reloaded’. Revay Rep. 26(1):1–8.
- Moselhi O. 2003. Estimating the cost of change orders. Cost Eng. 45(8):24.
- Moselhi O, Assem I, El-Rayes K. 2005. Change orders impact on labor productivity. J Constr Eng Manag. 131(3):354–359.
- Serag E, Oloufa A, Malone,; L, E, Radwan. 2010. Model for Quantifying the impact of change orders on project cost for U.S. Roadwork Construction. J Constr Eng Manage. 136(9):1015–1027.
- Shrestha PP, Fathi M. 2019. Impacts of change orders on cost and schedule performance and the correlation with project size of DB building projects. J Leg Aff Disput Resolut Eng Constr. 11(3):04519010.
- Thomas HR, Sanvido VE. 2000. Quantification of losses caused by labor inefficiencies: where is the elusive measured mile? Constr Law Bus. 1(3):1–14.
- Toomey DE, Marks JS, Zhao T, Dungan JM. 2015. Calculating lost labor productivity: is there a better way. Constr Law. 35:27.
- Veenendaal J. 1998. Analyzing the impact of change orders on a schedule. Cost Eng. 40(9):33.
- Wu C, Hsieh T, Cheng W. 2005. Statistical analysis of causes for design change in highway construction on Taiwan. Int J Proj Manag. 23(7):554–563.
- Yi W, Chan AP. 2014. Critical review of labor productivity research in construction journals. J Manag Eng. 30(2):214–225.
- Zink DA. 1986. The measured mile: proving construction inefficiency costs. Cost Eng. 28(4):19–21.