Quantifying labour impact cost due to change orders

References

  • 25R-03. 2004. Estimating lost labor productivity in construction claims. AACE Int Recomm Pract. No. 25R-03
  • Al-Kofahi ZG, Mahdavian A, Oloufa A. 2020. System dynamics modeling approach to quantify change orders impact on labor productivity 1: principles and model development comparative study. Int J Constr Manag. 22(7):1355–1366. https://doi.org/10.1080/15623599.2020.1711494.
  • Alzraiee H, Zayed T, Moselhi O. 2015. Dynamic planning of construction activities using hybrid simulation. Autom Constr. 49:176–192.
  • Chester M, Hendrickson C, Asce M. 2005. Cost impacts, scheduling impacts, and the claims process during construction. J Constr Eng Manage. 131(1):102–107.
  • Cox ID, Morris JP, Rogerson JH, Jared GE. 2010. A quantitative study of post contract award design changes in construction. Constr Manag Econ. 17(4), 427–439. http://dx.doi.org/10.1080/014461999371358
  • Egan JJ, Seder JE, Anderson DL. 2012. Practices in construction change order management. Cost Eng. 54(2):12.
  • Finke MR. and Member 1998. A better way to estimate and mitigate disruption. J Constr Eng Manage. 124(6):490–497.
  • Gulezian R, Samelian F. 2003. Baseline determination in construction labor productivity-loss claims. J Manag Eng. 19(4):160–165.
  • Günhan S, Arditi D, Doyle J. 2007. Avoiding change orders in public school construction. J Prof Issues Eng Educ Pract. 133(1):67–73.
  • Hanna AS, Gunduz M. 2004. Impact of change orders on small labor-intensive projects. J Constr Eng Manag. 130(5):726–733.
  • Hanna AS, Iskandar KA. 2017. Quantifying and modeling the cumulative impact of change orders. J Constr Eng Manag. 143(10):04017076.
  • Hanna AS, Lotfallah WB, Lee MJ. 2002. Statistical-fuzzy approach to quantify cumulative impact of change orders. J Comput Civ Eng. 16(4):252–258.
  • Hanna AS, Russell JS, Nordheim EV, Bruggink MJ. 1999. Impact of change orders on labor efficiency for electrical construction. J Constr Eng Manage. 125(4):224–232.
  • Ibbs W. 2012. Construction change: likelihood, severity, and impact on productivity. J Leg Aff Dispute Resolut Eng Constr. 4(3):67–73.
  • Ibbs W, Liu M. 2005. Improved measured mile analysis technique. J Constr Eng Manag. 131(12):1249–1256.
  • Ibbs W, Nguyen LD, Lee S. 2007. Quantified impacts of project change. J Prof Issues Eng Educ Pract. 133(1):45–52.
  • Khalifa WMA, Mahamid I. 2019. Causes of change orders in construction projects. Eng Technol Appl Sci Res. 9(6):4956–4961.
  • Lee H-S, Asce M, Ryu H-G, Yu J-H, Kim J-J. 2005. Method for calculating schedule delay considering lost productivity. J Constr Eng Manage. 131(11):1147–1154.
  • Leonard CA. 1988. The effects of change orders on productivity (Doctoral dissertation). Montreal, CA: Concordia University.
  • Love PED, Irani Z, Smith J, Regan M, Liu J. 2017. Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Prod Plan Control. 28(13): 1081–1092. http://dx.doi.org/10.1080/09537287.2017.1333647
  • McEniry G, Ibbs W. 2007. The cumulative effect of change orders on labour productivity: the leonard study ‘Reloaded’. Revay Rep. 26(1):1–8.
  • Moselhi O. 2003. Estimating the cost of change orders. Cost Eng. 45(8):24.
  • Moselhi O, Assem I, El-Rayes K. 2005. Change orders impact on labor productivity. J Constr Eng Manag. 131(3):354–359.
  • Serag E, Oloufa A, Malone,; L, E, Radwan. 2010. Model for Quantifying the impact of change orders on project cost for U.S. Roadwork Construction. J Constr Eng Manage. 136(9):1015–1027.
  • Shrestha PP, Fathi M. 2019. Impacts of change orders on cost and schedule performance and the correlation with project size of DB building projects. J Leg Aff Disput Resolut Eng Constr. 11(3):04519010.
  • Thomas HR, Sanvido VE. 2000. Quantification of losses caused by labor inefficiencies: where is the elusive measured mile? Constr Law Bus. 1(3):1–14.
  • Toomey DE, Marks JS, Zhao T, Dungan JM. 2015. Calculating lost labor productivity: is there a better way. Constr Law. 35:27.
  • Veenendaal J. 1998. Analyzing the impact of change orders on a schedule. Cost Eng. 40(9):33.
  • Wu C, Hsieh T, Cheng W. 2005. Statistical analysis of causes for design change in highway construction on Taiwan. Int J Proj Manag. 23(7):554–563.
  • Yi W, Chan AP. 2014. Critical review of labor productivity research in construction journals. J Manag Eng. 30(2):214–225.
  • Zink DA. 1986. The measured mile: proving construction inefficiency costs. Cost Eng. 28(4):19–21.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.