Factors influencing resource availability for post-disaster housing reconstruction: the case of Gaza Strip-Palestine

, &
Pages 1364-1374 | Received 16 Mar 2022, Accepted 23 Jan 2023, Published online: 06 Feb 2023

References

  • Ahmed I. 2011. An overview of post-disaster permanent housing reconstruction in developing countries. Int J Disaster Resil Built Environ. 2(2):148–164. https://doi.org/10.1108/17595901111149141
  • Ahmed I, Mcdonnell T. 2020. prospects and constraints of post-cyclone housing reconstruction in Vanuatu drawing from the experience of tropical cyclone Harold. Progress Disaster Sci. 8:100126–100129. https://doi.org/10.1016/j.pdisas.2020.100126
  • Al-Qeeq F, El-Wazir M. 2010. Sustainable housing strategies in post-war reconstruction of the Gaza Strip. Int Cong Rehab Sustainability. 1(1):1–10.
  • Alaloul WS, Alfaseeh A, Tayeh B, Zawawi NAWA, Liew M. 2019. Reconstruction of residential buildings post-disaster: a comparison of influencing factors. AIP Conference Proceedings, 2157, 1–11.
  • Arlikatti S, Maghelal P, Agnimitra N, Chatterjee V. 2018. Should I stay or should I go? Mitigation strategies for flash flooding in India. Int J Disaster Risk Reduct. 27(1):48–56. https://doi.org/10.1016/j.ijdrr.2017.09.019
  • Arroyo D. 2014. Blurred lines: accountability and responsibility in post-earthquake Haiti. Med Confl Surviv. 30(2):110–132. https://doi.org/10.1080/13623699.2014.904642
  • Askar R, Rodrigues A, Bragança L, Pinheiro D. 2019. From temporary to permanent; a circular approach for post-disaster housing reconstruction. IOP Conf Ser earth Environ Sci. 225:012032–012039. https://doi.org/10.1088/1755-1315/225/1/012032
  • Badri S, Asgary A, Eftekhari A, Levy J. 2006. Post-disaster resettlement, development and change: a case study of the 1990 Manjil earthquake in Iran. Disasters. 30(4):451–468. https://doi.org/10.1111/j.0361-3666.2006.00332.x
  • Barakat S. 2009. The failed promise of multi-donor trust funds: aid financing as an impediment to effective state-building in post-conflict contexts. Policy Stud. 30(2):107–126. https://doi.org/10.1080/01442870902723485
  • Barakat S, Masri F. 2017 August. Reviving the stalled reconstruction of Gaza. Brookings Doha Center-Policy Briefing, 1–13. http://eprints.whiterose.ac.uk/128623/1/Barakat_Masri_Brookings_Still_in_ruins_english.pdf.
  • Barakat S, Milton S, Elkahlout G. 2018. The Gaza reconstruction mechanism: old wine in new bottlenecks. J Interv Statebuilding. 12(2):208–227. https://doi.org/10.1080/17502977.2018.1450336
  • Barakat S, Milton S, Elkahlout G. 2019. Reconstruction under siege: the Gaza Strip since 2007. Disasters. 44(3):477–498. https://doi.org/10.1111/disa.12394
  • Barakat S, Shaban O. 2015. January). Back to Gaza: A new approach to reconstruction. Brookings Doha Centre, 1–14. https://www.brookings.edu/wp-content/uploads/2016/06/English-PDF-2.pdf.
  • Barakat S, Zyck SA. 2011. Housing reconstruction as socio-economic recovery and state building: evidence from Southern Lebanon. Housing Stud. 26(1):133–154. https://doi.org/10.1080/02673037.2010.512750
  • Barenstein J. 2012. The role of communities in post-disaster reconstruction. A call for owner-driven approaches. Tafter J. 1(1):1–12.
  • Barenstein J. 2015. Continuity and change in housing and settlement patterns in post earthquake Gujarat, India. Int J Disaster Resil Built Environ. 6(2):140–155. https://doi.org/10.1108/IJDRBE-01-2014-0009
  • Barenstein J, Iyengar S. 2010. India: from a culture of housing to a philosophy of reconstruction. In: Lyons M, Schilderman T, Boano C, editors, Building back better: delivering people-centred housing reconstruction at scale. United Kingdom: Practical Action Publishing; p. 163–188.
  • Bilau A, Witt E, Lill I. 2015. A Framework for managing post-disaster housing reconstruction. Procedia Econ Finance. 21(15):313–320. https://doi.org/10.1016/S2212-5671(15)00182-3
  • Bilau A, Witt E, Lill I. 2018. Practice framework for the management of post-disaster housing reconstruction programmes. Sustainability. 10(11):3929–3926. https://doi.org/10.3390/su10113929
  • Boen T. 2014. Reconstruction in Indonesia Post-2004 Tsunami: lessons learnt. Encyclopedia Earthquake Eng. 4(18):1–7.
  • Bothara J, Dhakal R, Ingham J, Dizhor D. 2016. The challenges of housing reconstruction after the April 2015 Gorkha, Nepal Earthquake. Tech J Nepal’s Engineers Assoc. 1(1):121–131. https://www.researchgate.net/publication/309188369%0AThe.
  • Bouraoui D, Lizarralde G. 2013. Centralized decision making, users’ participation and satisfaction in post-disaster reconstruction. Int J Disaster Resil Built Environ. 4(2):145–167. https://doi.org/10.1108/IJDRBE-02-2012-0009
  • Bouris D. 2015. The vicious cycle of building and destroying: the 2014 War on Gaza. Mediterranean Polit. 20(1):111–117. https://doi.org/10.1080/13629395.2015.1007000
  • Brück T, D’Errico M, Pietrelli R. 2019. The effects of violent conflict on household resilience and food security: evidence from the 2014 Gaza conflict. World Develop. 119(1):203–223. https://doi.org/10.1016/j.worlddev.2018.05.008
  • Carrasco S, Ochiai C, Okazaki K. 2016. Impacts of resident-initiated housing modifications in resettlement sites in Cagayan de Oro, Philippines. Int J Disaster Risk Reduct. 17(1):100–113. https://doi.org/10.1016/j.ijdrr.2016.05.001
  • Carver R, Nash J. 2005. Doing data analysis with SPSS: guide books (16th ed.). London: Duxbury Press. https://dl.acm.org/doi/book/10.5555/1200922.
  • Celentano G, Escamilla EZ, Göswein V, Habert G. 2019. A matter of speed: the impact of material choice in post-disaster reconstruction. Int J Disaster Risk Reduct. 34(1):34–44. https://doi.org/10.1016/j.ijdrr.2018.10.026
  • Chan A, Scott D, Chan A. 2004. Factors affecting the success of a construction project. J Constr Eng Manage. 130(1):153–155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)
  • Chang Y. 2012. Resourcing for post-disaster housing reconstruction. New Zealand: University of Auckland. http://researchspace.auckland.ac.nz/handle/2292/18891.
  • Chang Y, Suzanne W, Regan P, Erica S. 2010. Interpreting resourcing bottlenecks of post-Wenchuan earthquake reconstruction in China. Int J Strateg Prop Manage. 14(4):314–331. https://doi.org/10.3846/ijspm.2010.24
  • Chang Y, Wilkinson S, Potangaroa R, Seville E. 2011. Identifying factors affecting resource availability for post-disaster reconstruction: a case study in China. Constr Manage Econ. 29(1):37–48. https://doi.org/10.1080/01446193.2010.521761
  • Chang Y, Wilkinson S, Potangaroa R, Seville E. 2012a. Managing resources in disaster recovery projects. Eng Constr Archit Manage. 19(5):557–580. https://doi.org/10.1108/09699981211259621
  • Chang Y, Wilkinson S, Potangaroa R, Seville E. 2012b. Resourcing for post-disaster reconstruction: a comparative study of Indonesia and China. Disaster Prev Manage Int J. 21(1):7–21. https://doi.org/10.1108/09653561211202674
  • Chang Y, Wilkinson S, Seville E, Potangaroa R. 2010. Resourcing for a resilient post-disaster reconstruction environment. Int J Disaster Resil Built Environ. 1(1):65–83. https://doi.org/10.1108/17595901011026481
  • Cohen R, Johnson D, Thaler D, Allen B, Bartels E, Cahill J, Efron S. 2017. From Cast Lead to Protective Edge: lessons from Israel’s Wars in Gaza.
  • Daly P, Brassard C. 2011. Aid accountability and participatory approaches in post-disaster housing reconstruction. Asian J Soc Sci. 39(4):508–533. https://doi.org/10.1163/156853111X597305
  • Davidson C, Johnson C, Lizarralde G, Dikmen N, Sliwinski A. 2007. Truths and myths about community participation in post-disaster housing projects. Habitat Int. 31(1):100–115. https://doi.org/10.1016/j.habitatint.2006.08.003
  • Earnest J. 2015. Post-conflict reconstruction – a case study in Kosovo: the complexity of planning and implementing infrastructure projects. Int J Emerg Serv. 4(1):103–128. https://doi.org/10.1108/IJES-02-2015-0009
  • El-Masri S, Kellett P. 2001. Post-war reconstruction. Participatory approaches to rebuilding the damaged villages of Lebanon: a case study of al-Burjain. Habitat Int. 25(4):535–557. https://doi.org/10.1016/S0197-3975(01)00023-6
  • El-Sawalhi N, Lafi M. 2019. Evaluation of the public housing projects role in contributing to mitigation of housing crisis in Gaza strip. AJCE. 7(4):88–100. https://doi.org/10.11648/j.ajce.20190704.12
  • Elaklouk M. 2017. Quantitative outcome evaluation of Gaza shelter response. https://www.sheltercluster.org/sites/default/files/docs/quantitative_outcome_evaluation_of_gaza_shelter_response_report.pdf.
  • Enshassi A, Chatat T. 2012. Post disaster housing damage assessment in the Gaza Strip-Palestine. Sweden: World Congress on Housing; p. 1–11.
  • Enshassi A, Chatat T, von Meding J, Forino G. 2017. Factors influencing post-disaster reconstruction project management for housing provision in the Gaza Strip, Occupied Palestinian Territories. Int J Disaster Risk Sci. 8(4):402–414. https://doi.org/10.1007/s13753-017-0155-4
  • Enshassi M, Hallaq K, Arain F. 2019. Success factors in post disaster housing reconstruction. Int J Constr Project Manage. 11(2):133–147.
  • Enshassi M, Al-Hallaq K, Tayeh B. 2019. Failure factors facing organizations in post-disaster housing reconstruction projects in Gaza Strip. Civil Eng Res J. 8(5):1–10.
  • Fayazi M, Arefian F, Gharaati M, Johnson C, Lizarralde G, Davidson C. 2017. Managing institutional fragmentation and time compression in post-disaster reconstruction: the case of Bam. Int J Disaster Risk Reduct. 21(1):340–349. https://doi.org/10.1016/j.ijdrr.2017.01.012
  • Fayazi M, Lizarralde G. 2019. The impact of post-disaster housing reconstruction policies on different beneficiary groups: the case of Bam, Iran. Resettlement Challenges for Displaced Populations and Refugees; p. 123–140.
  • Fengler W, Ihsan A, Kaiser K. 2008. Managing post-disaster reconstruction finance: international experience in public financial management. In Policy Research Working Paper (Issue 4475).
  • Ghannad P, Lee Y-C, Choi J. 2019. Investigating stakeholders’ perceptions of feasibility and implications of modular construction-based post-disaster reconstruction. Modular and Offsite Construction (MOC) Summit Proceedings, Canada; p. 504–513. https://doi.org/10.29173/mocs132
  • Ginty R. 2007. Reconstructing post-war Lebanon: a challenge to the liberal peace? Conflict Security Develop. 7(3):457–482. https://doi.org/10.1080/14678800701556552
  • Hamieh C, Ginty R. 2010. A very political reconstruction: governance and reconstruction in Lebanon after the 2006 war. Disasters. 34(1):S103–S123. https://doi.org/10.1111/j.1467-7717.2009.01101.x
  • Hayles C. 2010. An examination of decision making in post disaster housing reconstruction. Int J Disaster Resil Built Environ. 1(1):103–122. https://doi.org/10.1108/17595901011026508
  • Hidayat B. 2013. The role of knowledge communication in the effective management of post-disaster reconstruction projects in Indonesia. Salford, UK: The University of Salford.
  • Hidayat B, Egbu C. 2010. A literature review of the role of project management in post-disaster reconstruction. Procs 26th Annual ARCOM Conference, p. 1269–1278. http://usir.salford.ac.uk/id/eprint/10144/.
  • Islam M, Kolade O, Kibreab G. 2018. Post-disaster housing reconstruction: the impact of resourcing in post-cyclones Sidr and Aila in Bangladesh. J Int Dev. 30(6):934–960.
  • Ismail D, Majid TA, Roosli R, Samah NA. 2014. Project management success for post-disaster reconstruction projects: international NGOs perspectives. Procedia Econ Finance. 18(1):120–127. https://doi.org/10.1016/S2212-5671(14)00921-6
  • Jayasuriya S, Mccawley P. 2008. Reconstruction after a Major Disaster : lessons from the Post-Tsunami Experience in Indonesia, Sri Lanka, and Thailand. In ADBI Working Paper (Issue 125). http://www.adbi.org/working-paper/2008/12/15/2766.reconstruction.post.tsunami.experience/.
  • Jha A, Barenstein J, Phelps P, Pittet D, Sena S. 2010. Safer homes, stronger communities. In: A Handbook for Reconstructing after Natural Disasters. The World Bank.
  • Karunasena G, Rameezdeen R. 2010. Post-disaster housing reconstruction: comparative study of donor vs owner-driven approaches. Int J Disaster Resil Built Environ. 1(2):173–191. https://doi.org/10.1108/17595901011056631
  • Kaufman A. 2006. Size does not matter: the Shebaa Farms in history and contemporary politics. J Middle East Stud. 6(1):163–176. http://web.mit.edu/cis/www/mitejmes/.
  • Kennedy J, Ashmore J, Babister E, Kelman I. 2008. The meaning of “build back better”: Evidence From post-tsunami Aceh and Sri Lanka. J Contingen Crisis Manage. 16(1):24–36. https://doi.org/10.1111/j.1468-5973.2008.00529.x
  • Kim K, Choi J. 2013. Breaking the vicious cycle of flood disasters: goals of project management in post-disaster rebuild projects. Int J Project Manage. 31(1):147–160. https://doi.org/10.1016/j.ijproman.2012.03.001
  • Kovács G, Matopoulos A, Hayes O. 2010. A community-based approach to supply chain design. Int J Logistics Res Appl. 13(5):411–422. https://doi.org/10.1080/13675567.2010.511609
  • Kudumovic L. 2020. The experience of post-war reconstruction: the case of built heritage in Bosnia. OHI. 45(3):231–248. https://doi.org/10.1108/OHI-05-2020-0038
  • Lawther P. 2009. Community involvement in post disaster re-construction: case study of the British Red Cross Maldives recovery program. Int J Strateg Prop Manag. 13(2):153–169. https://doi.org/10.3846/1648-715X.2009.13.153-169
  • Leitmann J. 2007. Cities and calamities: learning from post-disaster response in Indonesia. J Urban Health. 84(S1):144–153. https://doi.org/10.1007/s11524-007-9182-6
  • Li H, Chan N, Huang T, Guo H, Lu W, Skitmore M. 2009. Optimizing construction planning schedules by virtual prototyping enabled resource analysis. Autom Constr. 18(7):912–918. https://doi.org/10.1016/j.autcon.2009.04.002
  • Li Q, Umaier K, Koide O. 2019. Research on post-Wenchuan earthquake recovery and reconstruction implementation: a case study of housing reconstruction of Dujiangyan City. Progress Disaster Sci. 4(1):100041–100024. https://doi.org/10.1016/j.pdisas.2019.100041
  • Lu Y, Xu D, Wang Q, Xu J. 2018. Multi-stakeholder collaboration in community post-disaster reconstruction: case study from the Longmen Shan Fault area in China. Environ Hazards. 17(2):85–106. https://doi.org/10.1080/17477891.2017.1351914
  • Lu Y, Xu J. 2014. NGO collaboration in community post- disaster reconstruction: field research following the 2008 Wenchuan earthquake in China. Disasters. 39(2):258–278. NGO https://doi.org/10.1111/disa.12098
  • Maly E. 2018. Building back better with people centered housing recovery. Int J Disaster Risk Reduct. 29(1):84–93. https://doi.org/10.1016/j.ijdrr.2017.09.005
  • Mannakkara S, Wilkinson S. 2013. Build Back Better principles for post-disaster structural improvements. Struct Surv. 31(4):314–327. https://doi.org/10.1108/SS-12-2012-0044
  • Maynard V, Parker E, YosePh-Paulus R, Garcia D. 2018. Urban planning following humanitarian crises: supporting urban communities and local governments to take the lead. Int Institute Environ Develop. 30(1):265–282.
  • Moe T, Pathranarakul P. 2006. An integrated approach to natural disaster management: public project management and its critical success factors. Disaster Prevent Manage Int J. 15(3):396–413.
  • Nazara S, Resosudarmo B. 2007. Aceh-Nias reconstruction and rehabilitation: progress and challenges at the end of 2006. In ADB Institute Discussion Papers (Vol. 70). https://www.adb.org/publications/aceh-nias-reconstruction-and-rehabilitation-progress-and-challenges-end-2006.
  • Ong J, Jamero M, Esteban M, Honda R, Onuki M. 2016. Challenges in build-back-better housing reconstruction programs for coastal disaster management: case of Tacloban City, Philippines. Coastal Eng J. 58(1):1640010-1–1640010-32. https://doi.org/10.1142/S0578563416400106
  • Ophiyandri T, Amaratunga D, Pathirage C, Keraminiyage K. 2013. Critical success factors for community-based post-disaster housing reconstruction projects in the pre-construction stage in Indonesia. Int J Disaster Resil Built Environ. 4(2):236–249. https://doi.org/10.1108/IJDRBE-03-2013-0005
  • Pathirage C, Seneviratne K, Amaratunga D, Haigh R. 2012. Managing disaster knowledge: identification of knowledge factors and challenges. Int J Disaster Resil Built Environ. 3(3):237–252. https://doi.org/10.1108/17595901211263620
  • Paudel D, Rankin K, Billon PL. 2020. Lucrative disaster : financialization, accumulation and post-earthquake reconstruction in Nepal. Econ Geogr. 96(2):137–160. https://doi.org/10.1080/00130095.2020.1722635
  • Richard J, Adejo A, James R, Luqman O. 2017. Post disaster housing reconstruction (PDHR) in Ibaji and Lokoja, Kogi State-Nigeria. Malaysian J Civil Eng. 29(2):194–215.
  • Roosli R, Nordin J, O’Brien G. 2018. The evaluation of community participation in post-disaster housing reconstruction projects in Malaysia. 7th International Conference on Building Resilience; Using Scientific Knowledge to Inform Policy and Practice in Disaster Risk Reduction 212. p. 667–674.
  • Rotimi J, Wilkinson S, Zuo K, Myburgh D. 2009. Legislation for effective post – disaster reconstruction. Int J Strateg Prop Manage. 13(2):143–152. https://doi.org/10.3846/1648-715X.2009.13.143-152
  • Sadiqi Z, Trigunarsyah B, Coffey V. 2016. A framework for community participation in post-disaster housing reconstruction projects: a case of Afghanistan. Int J Project Manage. 35(5):900–912. https://doi.org/10.1016/j.ijproman.2016.11.008
  • Sakalasuriya M, Haigh R, Amaratunga D. 2016. The consequences of post conflict reconstruction: a review of literature. Proceedings of the 12th International Conference of the International Institute for Infrastructure Resilience and Reconstruction (IIIRR); p. 153–159. 978-955-589-210-1
  • Samaddar S, Okada N, Choi J, Tatano H. 2017. What constitutes successful participatory disaster risk management? Insights from post-earthquake reconstruction work in rural Gujarat, India. Nat Hazards. 85(1):111–138. https://doi.org/10.1007/s11069-016-2564-x
  • Samhouri M. 2017. UNDP report: three years after the 2014 Gaza hostilities. https://doi.org/10.32964/tj16.5
  • Schilderman T. 2010. Putting people at the centre of reconstruction. In Lyons M, Schilderman T, Boano C, editors. Building back better: delivering people-centred housing reconstruction at scale. United Kingdom: Practical Action Publishing; p. 7–37.
  • Seneviratne K, Amaratunga D, Haigh R. 2017. Managing housing needs of post conflict housing reconstruction: Sri Lankan perspective. ECAM. 24(2):275–288. https://doi.org/10.1108/ECAM-10-2015-0157
  • Sewordor E, Esnard A, Sapat A, Schwartz L. 2018. Challenges to mobilising resources for disaster recovery and reconstruction : perspectives of the Haitian diaspora. Disasters. 43(2):336–354. https://doi.org/10.1111/disa.12318
  • Sharma K, Kc A, Subedi M, Pokharel B. 2018. Challenges for reconstruction after Mw7.8 Gorkha earthquake: a study on a devastated area of Nepal. Geomatics Nat Hazards Risk. 9(1):760–790. https://doi.org/10.1080/19475705.2018.1480535
  • Silva J, Batchelor V. 2010. Indonesia: understanding agency policy in a national context. In Lyons M, Schilderman T, Camillo B, editors. Building back better. United Kingdom: Practical Action Publishing; p. 135–162.
  • Singh B, Wilkinson S. 2008. Post-disaster resource availability following a Wellington Earthquake: aggregates, concrete and cement. Build Resil Achiev Effect Post-Disaster Reconstr. 33(1):3–14. https://www.researchgate.net/profile/Suzanne_Wilkinson/publication/267703830_Post-disaster_Resource_Availability_following_a_Wellington_Earthquake_Aggregates_Concrete_and_Cement/links/5463ce400cf2cb7e9da99a9c.pdf.
  • Soelaksono A. 2009. NGO and Donor coordination to speeds up reconstruction and avoid NGO competition. 4th Annual International Workshop & Expo on Sumatra Tsunami and Recovery :9–14.
  • Tambe S, Pradhan S, Donka P, Singh P. 2018. Post-earthquake housing reconstruction in the Sikkim Himalaya: approaches, challenges, and lessons learnt. Develop Pract. 28(5):647–660. https://doi.org/10.1080/09614524.2018.1469601
  • Tatum M, Terrell F. 2012. Hurricane reconstruction in the United States Gulf Coast. Int J Disaster Resil Built Environ. 3(3):199–219. https://doi.org/10.1108/17595901211263602
  • Toor S, Ogunlana S. 2009. Construction professionals’ perception of critical success factors for large-scale construction projects. Constr Innov. 9(2):149–167. https://doi.org/10.1108/14714170910950803
  • Vahanvati M. 2018. A novel framework for owner driven reconstruction projects to enhance disaster resilience in the long term. DPM. 27(4):421–446. https://doi.org/10.1108/DPM-11-2017-0285
  • Vahanvati M, Beza B. 2017. An owner-driven reconstruction in Bihar. IJDRBE. 8(3):306–319. https://doi.org/10.1108/IJDRBE-10-2015-0051
  • Villacin D. 2017. A review of Philippine government disaster financing for recovery and reconstruction (No. 2017-21 Provided. PIDS Discussion Paper Series.) http://hdl.handle.net/10419/173598.
  • Wilkinson S, Chang-Richards A, Seville E, Brunsdon D. 2014. Assisting self-managing rebuilding owners in New Zealand to rebuild their homes: lessons for New Zealand from the 2009 Victoria Bush Fire Recovery. Resil Organizations Bull. 2(1):1–5. http://hdl.handle.net/10092/10963.
  • Xiao Y, Olshansky R, Zhang Y, Johnson LA, Song Y. 2019. Financing rapid community reconstruction after catastrophic disaster : lessons from the 2008 Wenchuan earthquake. Nat Hazards. 104(S1):5–30. https://doi.org/10.1007/s11069-019-03789-9
  • Yi H, Yang J. 2014. Research trends of post disaster reconstruction: the past and the future. Habitat Int. 42(1):21–29. https://doi.org/10.1016/j.habitatint.2013.10.005

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.