208
Views
0
CrossRef citations to date
0
Altmetric
Articles

Accurate estimation of cost and time utilizing risk analysis and simulation (case study: road construction projects in Iran)

, , , &
Pages 19-30 | Received 09 Apr 2022, Accepted 05 Mar 2023, Published online: 17 May 2023

References

  • Abdelgawad M, Fayek AR. 2010. Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. J Constr Eng Manage. 136(9):1028–1036.
  • Abdollahzadeh G, Rastgoo S. 2015. Risk assessment in bridge construction projects using fault tree and event tree analysis methods based on fuzzy logic. ASCE-ASME J Risk Uncert Eng Sys Part B Mech Eng. 1(3)031006 (12 pages).
  • Ahmadi M, Behzadian K, Ardeshir A, Kapelan Z. 2017. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. J Civ Eng Manage. 23(2):300–310.
  • Aiag A. 2006. Odette announces release of updated Global Materials Management Operations Guideline/Logistics Evaluation. [accessed 2008 Feb 24]. http://www.aiag.org/staticcontent/press/releases/GENERAL/PR_MMOGLE06_final.pdf.
  • Akinradewo OI, Aigbavboa CO, Oke AE. 2020. Improving accuracy of road projects’ estimates in the Ghanaian construction industry. J Financ Manag Prop Constr. 25(3):407–421.
  • Al-Bahar JF, Crandall KC. 1990. Systematic risk management approach for construction projects. J Constr Eng Manage. 116(3):533–546.
  • Al-Hazim N, Salem ZA. 2015. Delay and cost overrun in road construction projects in Jordan. Int J Eng Technol. 4(2):288.
  • Alipour-Bashary M, Ravanshadnia M, Abbasianjahromi H, Asnaashari E. 2021. A hybrid fuzzy risk assessment framework for determining building demolition safety index. KSCE J Civ Eng. 25(4):1144–1162.
  • Al-Keim A. 2017. Strategies to reduce cost overruns and schedule delays in construction projects [doctoral dissertation]. Minneapolis (MN): Walden University.
  • Alvand A, Mirhosseini SM, Ehsanifar M, Zeighami E, Mohammadi A. 2023. Identification and assessment of risk in construction projects using the integrated FMEA-SWARA-WASPAS model under fuzzy environment: a case study of a construction project in Iran. Int J Constr Manage. 23(3):392–404.
  • Ammar T, Abdel-Monem M, El-Dash K. 2022. Risk factors causing cost overruns in road networks. Ain Shams Eng J. 13(5):101720.
  • Anigbogu NA, Ahmad ZB, Molwus JJ. 2019. Cost overruns on federal capital territory authority road construction projects. FUTY J Environ. 13(1):1–14.
  • Ardeshir A, Mohajeri M, Amiri M. 2016. Evaluation of safety risks in construction using Fuzzy Failure Mode and Effect Analysis (FFMEA). Scientia Iranica. 23(6):2546–2556.
  • Ashley DB, Molenaar KR, Diekmann JE. 2006. Guide to risk assessment and allocation for highway construction management (No. FHWA-PL-06-032). United States Federal Highway Administration. Office of International Programs.
  • Bahamid RA, Doh SI. 2017. A review of risk management process in construction projects of developing countries. IOP Conf Ser: Mater Sci Eng. 271(1):012042.
  • Bhatt N, Sarkar D. 2020. Evaluation of success and risk factors for highway project performance through integrated analytical hierarchy process and fuzzy interpretive structural modelling. Int J Constr Manage. 20(6):653–665.
  • Carbone TA, Tippett DD. 2004. Project risk management using the project risk FMEA. Eng Manage J. 16(4):28–35.
  • Chatterjee K, Zavadskas EK, Tamošaitienė J, Adhikary K, Kar S. 2018. A hybrid MCDM technique for risk management in construction projects. Symmetry. 10(2):46.
  • Choudhry RM, Aslam MA, Hinze JW, Arain FM. 2014. Cost and schedule risk analysis of bridge construction in Pakistan: establishing risk guidelines. J Constr Eng Manage. 140(7):04014020.
  • Cox E, O'Hagan M, Taber R, O’Hagen M. 1998. The fuzzy systems handbook with cdrom.
  • Creemers S, Demeulemeester E, Van de Vonder S. 2014. A new approach for quantitative risk analysis. Ann Oper Res. 213(1):27–65.
  • Darwish KQ, Isik Z, Aladağ H, Demirdöğen G. 2018. Risk analysis of road construction projects: a case study from erbil. Tamap J Eng.
  • El-Maaty AEA, El-Kholy AM, Akal AY. 2017. Modeling schedule overrun and cost escalation percentages of highway projects using fuzzy approach. Eng Constr Archit Manage. 24(5):809–827.
  • El-Sayegh SM, Mansour MH. 2015. Risk assessment and allocation in highway construction projects in the UAE. J Manage Eng. 31(6):04015004.
  • El-Touny AS, Ibrahim AH, Amer MI. 2014. Estimating cost contingency for highway construction projects using analytic hierarchy process. Int J Comput Sci Issues (IJCSI). 11(6):73.
  • Gao N, Touran A. 2020. Cost overruns and formal risk assessment program in US rail transit projects. J Constr Eng Manag. 146(5):05020004.
  • Ghorbani A, Ravanshadnia M, Nobakht MB. 2014. A survey of risks in public private partnership highway projects in Iran. In: ICCREM 2014 Smart Construction and Management in the Context of New Technology; p. 482–492.
  • Guney K, Sarikaya N. 2009. Comparison of Mamdani and Sugeno fuzzy inference system models for resonant frequency calculation of rectangular microstrip antennas. Prog Electromagn Res b. 12:81–104.
  • Habibi M, Kermanshachi S, Safapour E. 2018. Engineering, procurement and construction cost and schedule performance leading indicators: state-of-the-art review. In: Proceedings of Construction Research Congress. New Orleans (LA): ASCE; p. 2–4.
  • Heravi G, Mohammadian M. 2021. Investigating cost overruns and delay in urban construction projects in Iran. Int J Constr Manage. 21(9):958–968.
  • Huang J, You JX, Liu HC, Song MS. 2020. Failure mode and effect analysis improvement: a systematic literature review and future research agenda. Reliab Eng Syst Saf. 199:106885.
  • Hyun KC, Min S, Choi H, Park J, Lee IM. 2015. Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels. Tunnel Underg Space Technol. 49:121–129.
  • Islam MS, Nepal MP, Skitmore M, Attarzadeh M. 2017. Current research trends and application areas of fuzzy and hybrid methods to the risk assessment of construction projects. Adv Eng Inf. 33:112–131.
  • Jian-Wen H, Xing-Xia W. 2009. Risk analysis of construction schedule based on Monte Carlo simulation. In: Institute of Electrical and Electronics. Vol. 4.
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Project Manage. 27(5):522–531.
  • Li H, Shu D, Zhang Y, Grace YY. 2018. Simultaneous variable selection and estimation for multivariate multilevel longitudinal data with both continuous and binary responses. Comput Stat Data Anal. 118:126–137.
  • Liu HC, You JX, You XY, Shan MM. 2015. A novel approach for failure mode and effects analysis using combination weighting and fuzzy VIKOR method. Appl Soft Comput. 28:579–588.
  • Li J, Zou PX. 2011. Fuzzy AHP-based risk assessment methodology for PPP projects. J Constr Eng Manage. 137(12):1205–1209.
  • Maher MLJ, McGoey-Smith AD. 2006, September. Risk-based cost and schedule estimation for large transportation projects. Proceedings of the Annual European Transport Conference. (pp. 18–20).
  • Mahamid I. 2011. Risk matrix for factors affecting time delay in road construction projects: owners’ perspective. Eng Constr Archit Manage. 18(6):609–617.
  • Mahamid I. 2013. Common risks affecting time overrun in road construction projects in Palestine: contractors’ perspective. Aust J Constr Econ Build. 13(2):45–53.
  • Mishra S, Mishra B. 2016. A study on risk factors involved in the construction projects. Int J Innov Res Sci Eng Technol. 5(2):1190–1196.
  • Pehlivan S, Öztemir AE. 2018. Integrated risk of progress-based costs and schedule delays in construction projects. Eng Manage J. 30(2):108–116.
  • Peláez CE, Bowles JB. 1996. Using fuzzy cognitive maps as a system model for failure modes and effects analysis. Inform Sci. 88(1–4):177–199.
  • Project Management Institute. 2021. A guide to the project management body of knowledge (PMBOK® Guide)-and the standard for project management. Project Management Institute.
  • Raychaudhuri S. 2008 Dec. Introduction to Monte Carlo simulation. In: 2008 Winter Simulation Conference. IEEE; p. 91–100.
  • Sadeghi N, Fayek AR, Pedrycz W. 2010. Fuzzy Monte Carlo simulation and risk assessment in construction. Comput-Aided Civ Infrastruct Eng. 25(4):238–252.
  • Sohu S, Halid A, Nagapan S, Fattah A, Latif I, Ullah K. 2017. Causative factors of cost overrun in highway projects of Sindh province of Pakistan. IOP Conf Ser: Mater Sci Eng. 271(1):012036.
  • Sumathi S, Paneerselvam S. 2010. Computational intelligence paradigms: theory & applications using MATLAB. 1st ed. CRC Press.
  • Tawalare A. 2019. Identification of risks for Indian highway construction. IOP Conf Ser: Mater Sci Eng. 471(10):102003.
  • Thorat M, Birajdar BV. 2015. Cost overrun assessment model in highway construction projects using fuzzy uncertainty analysis. Int J Eng Res Technol. 6(4):568–574.
  • Twin A. 2022. Delphi method. [accessed 2022 May 27]. https://www.investopedia.com/terms/d/delphi-method.asp
  • Van Leeuwen JF, Nauta MJ, De Kaste D, Odekerken-Rombouts YMCF, Oldenhof MT, Vredenbregt MJ, Barends DM. 2009. Risk analysis by FMEA as an element of analytical validation. J Pharm Biomed Anal. 50(5):1085–1087.
  • Vu HA, Wang J, Min L, Mai SH, Nguyen HP. 2016. Research on cost overrun risk of construction phase of Vietnam highway international contracting project. Engineering. 08(03):86–98.
  • Wang XX, Huang JW. 2009, January. Risk analysis of construction schedule based on Monte Carlo simulation. Proceedings of the 2009th International Symposium on Computer Network and Multimedia Technology. IEEE. pp. 1–4.
  • Wu X, Wu J. 2021. The risk priority number evaluation of FMEA analysis based on random uncertainty and fuzzy uncertainty. Complexity. 2021:1–15.
  • Yucelgazi F, Yitmen I. 2019. An ANP model for risk assessment in large-scale transport infrastructure projects. Arab J Sci Eng.. 44:4257–4275.
  • Zaman MB, Kobayashi E, Wakabayashi N, Khanfir S, Pitana T, Maimun A. 2014. Fuzzy FMEA model for risk evaluation of ship collisions in the Malacca Strait: based on AIS data. J Simul. 8(1):91–104.
  • Zayed T, Amer M, Pan J. 2008. Assessing risk and uncertainty inherent in Chinese highway projects using AHP. Int J Project Manage. 26(4):408–419.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.