218
Views
0
CrossRef citations to date
0
Altmetric
Research Articles

Application of machine learning techniques in estimating the construction cost of residential buildings in the Middle East region

, &
Pages 946-958 | Received 14 Mar 2023, Accepted 13 Jul 2023, Published online: 25 Jul 2023

References

  • Adeli H, Karim A. 1997. Scheduling/cost optimization and neural dynamics model for construction. J Constr Eng Manage. 123(4):450–458. doi: 10.1061/(ASCE)0733-9364(1997)123:4(450).
  • Adeli H, Wu M. 1998. Regularization neural network for construction cost estimation. J Constr Eng Manage. 124(1):18–24. doi: 10.1061/(ASCE)0733-9364(1998)124:1(18).
  • Das S, Gupta R, Kabundi A. 2009. Could we have predicted the recent downturn in the South African housing market? J Housing Econ. 18(4):325–335. doi: 10.1016/j.jhe.2009.04.004.
  • El Hajj B, Schoefs F, Castanier B, Yeung T. 2017. A condition‐based deterioration model for the stochastic dependency of corrosion rate and crack propagation in corroded concrete structures. Comput Aided Civ Infrastruct Eng. 32(1):18–33. doi: 10.1111/mice.12208.
  • Favara G, Song Z. 2014. House price dynamics with dispersed information. J Econ Theory. 149:350–382. doi: 10.1016/j.jet.2013.05.001.
  • Fereshtehnejad E, Shafieezadeh A. 2016. Multiple hazard incidents lifecycle cost assessment of structural systems considering state‐dependent repair times and fragility curves. Earthquake Engng Struct Dyn. 45(14):2327–2347. doi: 10.1002/eqe.2764.
  • Florez L. 2017. Crew allocation system for the masonry industry. Comput Aided Civ Infrastruct Eng. 32(10):874–889. doi: 10.1111/mice.12301.
  • Gao H, Zhang X. 2013. A Markov‐based road maintenance optimization model considering user costs. Comput Aided Civ Infrastruct Eng. 28(6):451–464. doi: 10.1111/mice.12009.
  • Gribniak V, Mang HA, Kupliauskas R, Kaklauskas G, Juozapaitis A. 2016. Stochastic tension‐stiffening approach for the solution of serviceability problems in reinforced concrete: exploration of predictive capacity. Comput Aided Civ Infrastruct Eng. 31(6):416–431. doi: 10.1111/mice.12183.
  • Hsiao FY, Wang SH, Wang WC, Wen CP, Yu WD. 2012. Neuro‐fuzzy cost estimation model enhanced by fast messy genetic algorithms for semiconductor hookup construction. Comput Aided Civ Infrastruct Eng. 27(10):764–781. doi: 10.1111/j.1467-8667.2012.00786.x.
  • Jafarzadeh R, Ingham JM, Wilkinson S, González V, Aghakouchak AA. 2014. Application of artificial neural network methodology for predicting seismic retrofit construction costs. J Constr Eng Manage. 140(2):04013044. doi: 10.1061/(ASCE)CO.1943-7862.0000725.
  • Karim A, Adeli H. 1999. CONSCOM: an OO construction scheduling and change management system. J Constr Eng Manage. 125(5):368–376. doi: 10.1061/(ASCE)0733-9364(1999)125:5(368).
  • Kim GH, Yoon JE, An SH, Cho HH, Kang KI. 2004. Neural network model incorporating a genetic algorithm in estimating construction costs. Build Environ. 39(11):1333–1340. doi: 10.1016/j.buildenv.2004.03.009.
  • Myers D. 2016. Construction economics: a new approach. Boca Raton (FL): Routledge.
  • Peško I, Mučenski V, Šešlija M, Radović N, Vujkov A, Bibić D, Krklješ M. 2017. Estimation of costs and durations of construction of urban roads using ANN and SVM. Complexity. 2017:1–13. doi: 10.1155/2017/2450370.
  • Rafiei MH, Adeli H. 2016. A novel machine learning model for estimation of sale prices of real estate units. J Constr Eng Manage. 142(2):04015066. doi: 10.1061/(ASCE)CO.1943-7862.0001047.
  • Rafiei MH, Adeli H. 2018. Novel machine-learning model for estimating construction costs considering economic variables and indexes. J Constr Eng Manage. 144(12):04018106. doi: 10.1061/(ASCE)CO.1943-7862.0001570.
  • Renaud O, Victoria-Feser MP. 2010. A robust coefficient of determination for regression. J Stat Plan Inference. 140(7):1852–1862. doi: 10.1016/j.jspi.2010.01.008.
  • Smith R, Ferrebee E, Ouyang Y, Roesler J. 2014. Optimal staging area locations and material recycling strategies for sustainable highway reconstruction. Comput Aided Civ Infrastruct Eng. 29(8):559–571. doi: 10.1111/mice.12089.
  • Tijanić K, Car-Pušić D, Šperac M. 2020. Cost estimation in road construction using artificial neural network. Neural Comput Applic. 32(13):9343–9355. doi: 10.1007/s00521-019-04443-y.
  • Wang YR, Yu CY, Chan HH. 2012. Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models. Int J Project Manage. 30(4):470–478. doi: 10.1016/j.ijproman.2011.09.002.
  • Yi W, Wang S. 2016. Multi‐objective mathematical programming approach to construction laborer assignment with equity consideration. Comput Aided Civ Infrastruct Eng. 31(12):954–965. doi: 10.1111/mice.12239.
  • Yi W, Wang S. 2017. Mixed‐integer linear programming on work‐rest schedule design for construction sites in hot weather. Comput Aided Civ Infrastruct Eng. 32(5):429–439. doi: 10.1111/mice.12267.
  • Yu J, Zhong D, Ren B, Tong D, Hong K. 2017. Probabilistic risk analysis of diversion tunnel construction simulation. Comput Aided Civ Infrastruct Eng. 32(9):748–771. doi: 10.1111/mice.12276.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.