Applying work measurements to identify productivity potentials: the case of prefabricated concrete elements

Received 18 Oct 2022, Accepted 15 Nov 2023, Published online: 23 Nov 2023

References

  • Abou Ibrahim H, Hamzeh F, Zankoul E, Lindhard SM, Rizk L. 2019. Understanding the planner’s role in lookahead construction planning. Production Plan Control. 30(4):271–284. doi: 10.1080/09537287.2018.1524163.
  • Allmon E, Haas CT, Borcherding JD, Goodrum PM. 2000. U.S. construction labor productivity trends, 1970–1998. J Constr Eng Manage. 126(2):97–104. doi: 10.1061/(ASCE)0733-9364(2000)126:2(97).
  • Ballard G. 2000. The last planner system of production control [Ph.D. thesis]. University of Birmingham.
  • Ballard G, Howell G. 1998. Shielding production: essential step in production control. J Constr Eng Manage. 124(1):11–17. doi: 10.1061/(ASCE)0733-9364(1998)124:1(11).
  • Chang S, Yi J, Son J. 2015. The productivity improvement for steel framing work efficiency by work sampling and 5-minute rating technique. J Const Eng Project Manage. 5(1):40–46. doi: 10.6106/JCEPM.2015.5.1.040.
  • Cohen J. 1988. Statistical power analysis for the behavioural sciences. 2nd ed. New York: Academic Press.
  • Cook RD, Weisberg S. 1982. Residuals and influence in regression. New York: Chapman & Hall.
  • Diefendorff JM, Seaton GA. 2015. Work motivation. In: J.D. Wright, editor, International encyclopedia of the social & behavioral sciences. 2nd ed. Vol. 25, Oxford: Elsevier Press; p. 680–686.
  • Field A. 2009. Discovering statistics using SPSS. 3rd ed. London: Sage.
  • Franz B, Leicht R, Molenaar K, Messner J. 2017. Impact of team integration and group cohesion on project delivery performance. J Constr Eng Manage. 143(1):04016088. doi: 10.1061/(ASCE)CO.1943-7862.0001219.
  • Ghanbaripour AN, Sher W, Yousefi A. 2020. Critical success factors for subway construction projects – main contractors’ perspectives. Int J Constr Manage. 20(3):177–195. doi: 10.1080/15623599.2018.1484843.
  • Gong J, Borcherding JD, Caldas CH. 2011. Effectiveness of craft time utilization in construction projects. Constr Manage Econ. 29(7):737–751. doi: 10.1080/01446193.2011.595013.
  • Green SB. 1991. How many subjects does it take to do a regression analysis? Multivariate Behav Res. 26(3):499–510. doi: 10.1207/s15327906mbr2603_7.
  • Gustafsson J. 2017. Single case studies vs. multiple case studies: a comparative study. Halmstad, Sweden: Academy of Business, Engineering and Science, Halmstad University.
  • Hajikazemi S, Andersen B, Langlo JA. 2017. Analyzing electrical installation labor productivity through work sampling. IJPPM. 66(4):539–553. doi: 10.1108/IJPPM-06-2016-0122.
  • Handa VK, Abdalla O. 1989. Forecasting productivity by work sampling. Constr Manag Econ. 7(1):19–28. doi: 10.1080/01446198900000003.
  • Hanna AS, Taylor CS, Sullivan KT. 2005. Impact of extended overtime on construction labor productivity. J Constr Eng Manage. 131(6):734–739. doi: 10.1061/(ASCE)0733-9364(2005)131:6(734).
  • Herbsman Z, Ellis R. 1990. Research of factors influencing construction productivity. Constr Manag Econ. 8(1):49–61. doi: 10.1080/01446199000000005.
  • Hwang BG, Krishnankutty P, Zhu L, Caldas CH, Shounak A, Mulva S. 2020. Improving labour productivity in process construction maintenance and shutdown/turnaround projects. Int J Constr Manage. 20(7):822–836. doi: 10.1080/15623599.2018.1492664.
  • Jenkins JL. 2004. Productivity improvement through work sampling. Cost Eng. 46(3):27.
  • Johari S, Jha KN. 2020. Impact of work motivation on construction labor productivity. J Manage Eng. 36(5):04020052. doi: 10.1061/(ASCE)ME.1943-5479.0000824.
  • Josephson PE, Bjorkman L. 2013. Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Eng Constr Arch Manage. 20(6):589–603. doi: 10.1108/ECAM-12-2011-0108.
  • Kenley R. 2014. Productivity improvement in the construction process. Constr Manag Econ. 32(6):489–494. doi: 10.1080/01446193.2014.930500.
  • Kim H. 2013. Statistical notes for clinical researchers: assessing normal distribution (2) using skewness and kurtosis. Restor Dent Endod. 38(1):52–54. doi: 10.5395/rde.2013.38.1.52.
  • Larsen JK, Lindhard SM, Brunoe TD, Jensen KN. 2018. The relation between pre-planning, commissioning and enhanced project performance. CEB. 18(2):1–14. doi: 10.5130/AJCEB.v18i2.5762.
  • Leung M, Chen D, Yu J. 2008. Demystifying moderate variables of the interrelationships among affective commitment, job performance, and job satisfaction of construction professionals. J Constr Eng Manage. 134(12):963–971. doi: 10.1061/(ASCE)0733-9364(2008)134:12(963).
  • Lieberman MB, Kang J. 2008. How to measure company productivity using value-added: a focus on Pohang Steel (POSCO). Asia Pacific J Manage. 25(2):209–224. doi: 10.1007/s10490-007-9081-0.
  • Lindhard SM, Hamzeh F, Gonzalez VA, Wandahl S, Ussing LF. 2019. Impact of activity sequencing on reducing variability. J Constr Eng Manage. 145(3):04019001. doi: 10.1061/(ASCE)CO.1943-7862.0001618.
  • Lindhard SM, Neve H, Terje Kalsaas B, Møller DE, Wandahl S. 2020. Ranking and comparing key factors causing time-overruns in on-site construction. Int J Constr Manage. 22(14):2724–2730. doi: 10.1080/15623599.2020.1820659.
  • Lingard H, Gilbert G, Graham P. 2001. Improving solid waste reduction and recycling performance using goal setting and feedback. Constr Manag Econ. 19(8):809–817. doi: 10.1080/01446190110070952.
  • Liou FS, Borcherding JD. 1986. Work sampling can predict unit rate productivity. J Constr Eng Manage. 112(1):90–103. doi: 10.1061/(ASCE)0733-9364(1986)112:1(90).
  • Liu AMM, Walker A. 1998. Evaluation of project outcomes. Constr Manage Econ. 16(2):209–219.
  • Locke EA, Latham GP. 2006. New directions in goal-setting theory. Curr Dir Psychol Sci. 15(5):265–268. doi: 10.1111/j.1467-8721.2006.00449.x.
  • Love PED, Tse RYC, Edwards DJ. 2005. Time–cost relationships in Australian building construction projects. J Constr Eng Manage. 131(2):187–194. doi: 10.1061/(ASCE)0733-9364(2005)131:2(187).
  • Marginson D, McAulay L, Roush M, van Zijl T. 2014. Examining a positive psychological role for performance measures. Manage Accounting Res. 25(1):63–75. doi: 10.1016/j.mar.2013.10.002.
  • Meiling JH, Sandberg M, Johnsson H. 2014. A study of a plan-do-check-act method used in less industrialized activities: two cases from industrialized housebuilding. Constr Manag Econ. 32(1–2):109–125. doi: 10.1080/01446193.2013.812227.
  • Nahmens I, Ikuma LH, Khot D. 2012. Kaizen and job satisfaction – a case study in industrialized homebuilding. Lean Constr J. 91–104.
  • Neve HH, Wandahl S, Lindhard S, Teizer J, Lerche J. 2020. Determining the relationship between direct work and construction labor productivity in North America: four decades of insights. J Constr Eng Manage. 146(9):04020110. doi: 10.1061/(ASCE)CO.1943-7862.0001887.
  • Neve H, Wandahl S, Lindhard S, Teizer J, Lerche J. 2020. Learning to see value-adding and non-value-adding work time in renovation production systems. Product Plan Control. 33(8):790–802. doi: 10.1080/09537287.2020.1843730.
  • Ofori G, Zhang Z, Ling FYY. 2020. Key barriers to increase construction productivity: the Singapore case. Int J Constr Manage. 22(14):2635–2646. doi: 10.1080/15623599.2020.1819521.
  • Peer S. 1986. An improved systematic activity sampling technique for work study. Constr Manag Econ. 4(2):151–159. doi: 10.1080/01446198600000012.
  • Pollitt C. 2013. The logics of performance management. Evaluation. 19(4):346–363. doi: 10.1177/1356389013505040.
  • Porter LW, Steers RM. 1973. Organizational, work, and personal factors in employee turnover and absenteeism. Psychol Bulletin. 80(2):151–176. doi: 10.1037/h0034829.
  • Prather CW. 2005. The dumb thing about SMART goals for innovation. Res Technol Manage. 48(5):14–15. doi: 10.1080/08956308.2005.11657331.
  • Rojas EM, Aramvareekul P. 2003. Is construction labor productivity really declining? J Constr Eng Manage. 129(1):41–46. doi: 10.1061/(ASCE)0733-9364(2003)129:1(41).
  • Salhab D, Møller DE, Lindhard SM, Hamzeh F, Randrup M, Pilgaard A. 2022. Accounting for variability: identifying critical activities as a supplement to the critical path. J Constr Eng Manage. 148(5):04022019. doi: 10.1061/(ASCE)CO.1943-7862.0002266.
  • Schmidt AF, Finan C. 2018. Linear regression and the normality assumption. J Clin Epidemiol. 98:146–151. doi: 10.1016/j.jclinepi.2017.12.006.
  • Shahin A, Mahbod MA. 2007. Prioritization of key performance indicators: an integration of analytical hierarchy process and goal setting. Int J Product Performance Manage. 56(3):226–240. doi: 10.1108/17410400710731437.
  • Slomp J, Bokhorst JAC, Germs R. 2009. A lean production control system for high-variety/low-volume environments: a case study implementation. Product Plan Control. 20(7):586–595. doi: 10.1080/09537280903086164.
  • Thomas HR. 1991. Labor productivity and work sampling: the bottom line. J Constr Eng Manage. 117(3):423–444. doi: 10.1061/(ASCE)0733-9364(1991)117:3(423).
  • Thomas HR, Guevara JM, Gustenhoven CT. 1984. Improving productivity estimates by work sampling. J Constr Eng Manage. 110(2):178–188. doi: 10.1061/(ASCE)0733-9364(1984)110:2(178).
  • Thomas HR, Maloney WF, Horner R, MW, Smith GR, Handa VK, Sanders SR. 1990. Modeling construction labor productivity. J Constr Eng Manage. 116(4):705–726. doi: 10.1061/(ASCE)0733-9364(1990)116:4(705).
  • Welsh DT, Ordóñez LD. 2014. The dark side of consecutive high performance goals: linking goal setting, depletion, and unethical behavior. Organ Behavior Human Decision Process. 123(2):79–89. doi: 10.1016/j.obhdp.2013.07.006.
  • Wyke S, Lindhard SM, Larsen JK. 2023. Using principal component analysis to identify latent factors affecting cost and time overrun in public construction projects. Eng Constr Arch Manage. doi: 10.1108/ECAM-02-2022-0189.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.