Using extreme gradient boosting (XGBoost) machine learning to predict construction cost overruns

&
Received 13 Apr 2023, Accepted 22 Nov 2023, Published online: 09 Dec 2023

References

  • Abbasi O, Noorzai E, Gharouni Jafari K, Golabchi M. 2020. Exploring the causes of delays in construction industry using a cause-and-effect diagram: case study for Iran. J Archit Eng. 26(3):05020008. doi: 10.1061/(ASCE)AE.1943-5568.0000431.
  • Acharya NK, Lee YD, Kim SY, Lee JC, Kim CS. 2006. Analysis of construction delay factor: a Korean perspective. Proceedings of the 7th Asia Pacific Industrial Engineering and Management Systems Conference, 2006, p. 883–895.
  • Adams FK. 2008. Risk perception and Bayesian analysis of international construction contract risks: the case of payment delays in a developing economy. Int J Project Manage. 26(2):138–148. doi: 10.1016/j.ijproman.2007.05.007.
  • Ahiaga-Dagbui DD, Smith SD. 2012. Neural networks for modelling the final target cost of water projects.
  • Ahmed R, Philbin SP, Cheema F-A. 2021. Systematic literature review of project manager’s leadership competencies. ECAM. 28(1):1–30. doi: 10.1108/ECAM-05-2019-0276.
  • Akinradewo O, Aigbavboa C, Oke A, Coffie H. 2021. Modelling a cost profile for road projects. Can J Civ Eng. 48(4):366–376. doi: 10.1139/cjce-2019-0739.
  • Alex DP, Al Hussein M, Bouferguene A, Fernando S. 2010. Artificial neural network model for cost estimation: city of Edmonton’s water and sewer installation services. J Constr Eng Manage. 136(7):745–756. doi: 10.1061/(ASCE)CO.1943-7862.0000184.
  • Al-Kharashi A, Skitmore M. 2009. Causes of delays in Saudi Arabian public sector construction projects. Construct Manag Econom. 27(1):3–23. doi: 10.1080/01446190802541457.
  • Ameyaw EE, Hu Y, Shan M, Chan AP, Le Y. 2016. Application of Delphi method in construction engineering and management research: a quantitative perspective. J Civil Eng Manag. 22(8):991–1000. doi: 10.3846/13923730.2014.945953.
  • Asghari V, Hsu S-C, Wei H-H. 2021. Expediting life cycle cost analysis of infrastructure assets under multiple uncertainties by deep neural networks. J Manage Eng. 37(6):04021059. doi: 10.1061/(ASCE)ME.1943-5479.0000950.
  • Attalla M, Hegazy T. 2003. Predicting cost deviation in reconstruction projects: artificial neural networks versus regression. J Constr Eng Manage. 129(4):405–411. doi: 10.1061/(ASCE)0733-9364(2003)129:4(405).
  • Azhar N, Farooqui RU, Ahmed SM. 2008. Cost overrun factors in construction industry of Pakistan. First International Conference on Construction in Developing Countries (ICCIDC–I), Advancing and Integrating Construction Education, Research & Practice, p. 499–508.
  • Baccarini D, Love PE. 2014. Statistical characteristics of cost contingency in water infrastructure projects. J Constr Eng Manage. 140(3):04013063. doi: 10.1061/(ASCE)CO.1943-7862.0000820.
  • Baccarini D. 2005. Estimating project cost contingency – beyond the 10% syndrome. 2005 Australian Institute of Project Management Conference, AIPM. [accessed 2022 Mar 20]. www.aipm.com.au/resource/Baccarini-AIPMconf05.pdf.
  • Bordat C, McCullouch BG, Labi S, Sinha KC. 2004. An analysis of cost overruns and time delays of INDOT projects.
  • Bulsari A. 1993. Some analytical solutions to the general approximation problem for feedforward neural networks. Neural Netw. 6(7):991–996. doi: 10.1016/S0893-6080(09)80008-7.
  • Chambers M, Dinsmore TW. 2015. Modern analytics methodologies: driving business value with analytics. Upper Saddle River, NJ: Pearson Education, Inc.
  • Chan AP, Chan AP. 2004. Key performance indicators for measuring construction success. Benchmarking. 11(2):203–221. doi: 10.1108/14635770410532624.
  • Chen T, Guestrin C. 2016. XGBoost: a scalable tree boosting system. Proceedings of the 22nd Acm Sigkdd International Conference on Knowledge Discovery and Data Mining, p. 785–794.
  • Cheng Y-M. 2014. An exploration into cost-influencing factors on construction projects. Int J Project Manage. 32(5):850–860. doi: 10.1016/j.ijproman.2013.10.003.
  • Chimwaso DK. 2000. An evaluation of cost performance of public projects: case of Botswana. Proceedings of the 2nd International Conference on Construction in Developing Countries, p. 81–89.
  • Coffie GH, Aigbavboa CO, Thwala WD. 2019. Modelling construction completion cost in Ghana public sector building projects. Asian J Civ Eng. 20(7):1063–1070. doi: 10.1007/s42107-019-00165-7.
  • Creedy GD, Skitmore M, Wong JK. 2010. Evaluation of risk factors leading to cost overrun in delivery of highway construction projects. J Constr Eng Manage. 136(5):528–537. doi: 10.1061/(ASCE)CO.1943-7862.0000160.
  • Durdyev S, Hosseini MR. 2020. Causes of delays on construction projects: a comprehensive list. IJMPB. 13(1):20–46. doi: 10.1108/IJMPB-09-2018-0178.
  • El-Kholy AM. 2013. Modeling delay percentage of construction projects in Egypt using statistical-fuzzy approach. IOSR-JMCE. 7(5):47–58. doi: 10.9790/1684-0754758.
  • Elmousalami HH. 2020. Artificial intelligence and parametric construction cost estimate modeling: state-of-the-art review. J Constr Eng Manage. 146(1):03119008. doi: 10.1061/(ASCE)CO.1943-7862.0001678.
  • ElSawy I, Hosny H, Razek MA. 2011. A neural network model for construction projects site overhead cost estimating in Egypt (arXiv:1106.1570). 8(3):273–283.
  • Engebø A, Lædre O, Young B, Larssen PF, Lohne J, Klakegg OJ. 2020. Collaborative project delivery methods: a scoping review.
  • Flyvbjerg B, Holm MS, Buhl S. 2002. Underestimating costs in public works projects: error or lie? J Am Plan Associat. 68(3):279–295. doi: 10.1080/01944360208976273.
  • Flyvbjerg B. 2009. Survival of the unfittest: why the worst infrastructure gets built—and what we can do about it. Oxf Rev Econ Policy. 25(3):344–367. doi: 10.1093/oxrep/grp024.
  • Flyvbjerg B. 2014. What you should know about megaprojects and why: an overview. Project Manag J. 45(2):6–19. doi: 10.1002/pmj.21409.
  • Frimpong Y, Oluwoye J, Crawford L. 2003. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage. 21(5):321–326. doi: 10.1016/S0263-7863(02)00055-8.
  • Gbahabo P, Samuel AO. 2017. Effects of infrastructure project cost overruns and schedule delays in sub-saharan Africa. 11th International Conference on Social Sciences Helsinki, p. 20–21.
  • Gonzalez P, González V, Molenaar K, Orozco F. 2014. Analysis of causes of delay and time performance in construction projects. J Constr Eng Manage. 140(1):04013027. doi: 10.1061/(ASCE)CO.1943-7862.0000721.
  • Gupta N. 2013. Artificial neural network. Network Comp Syst. 3(1):24–28.
  • Han J, Kamber M, Pei J. 2012. Data mining concepts and techniques third edition. Waltham, MA: University of Illinois at Urbana-Champaign Micheline Kamber Jian Pei Simon Fraser University.
  • Heravi G, Mohammadian M. 2021. Investigating cost overruns and delay in urban construction projects in Iran. Int J Construct Manag. 21(9):958–968. doi: 10.1080/15623599.2019.1601394.
  • Hsu C-W, Chang C-C, Lin C-J. 2003. A practical guide to support vector classification. Technical Report, Department of Computer Science and Information Engineering, University of National Taiwan, Taipei; p. 1–12.
  • Hu Y, Chan AP, Le Y, Jin R. 2015. From construction megaproject management to complex project management: bibliographic analysis. J Manage Eng. 31(4):04014052. doi: 10.1061/(ASCE)ME.1943-5479.0000254.
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Project Manage. 27(5):522–531. doi: 10.1016/j.ijproman.2008.07.003.
  • Karaca I, Gransberg DD, Jeong HD. 2020. Improving the accuracy of early cost estimates on transportation infrastructure projects. J Manage Eng. 36(5):04020063. doi: 10.1061/(ASCE)ME.1943-5479.0000819.
  • Kholif W, Hosny H, Sanad A. 2013. Analysis of time and cost overruns in educational building projects in Egypt. Int J Eng Tech Res. 1(10):10.
  • Kuhn M, Johnson K. 2013. Applied predictive modeling. Vol. 26. New York: Springer; p. 13.
  • Kumar RD, Searleman AC, Swamidass SJ, Griffith OL, Bose R. 2015. Statistically identifying tumor suppressors and oncogenes from pan-cancer genome-sequencing data. Bioinformatics. 31(22):3561–3568. doi: 10.1093/bioinformatics/btv430.
  • Laryea SA. 2010. Challenges and opportunities facing contractors in Ghana.
  • Le-Hoai L, Lee YD, Lee JY. 2008. Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries. KSCE J Civ Eng. 12(6):367–377. doi: 10.1007/s12205-008-0367-7.
  • Lin T, Yi T, Zhang C, Liu J. 2019. Intelligent prediction of the construction cost of substation projects using support vector machine optimized by particle swarm optimization. Math Prob Eng. 2019:1–10. doi: 10.1155/2019/7631362.
  • Lovallo D, Kahneman D. 2003. Delusions of success. Harv Bus Rev. 81(7):56–63, 117.
  • Love PE, Ahiaga-Dagbui DD, Smith SD, Sing MC-P, Tokede O. 2018. Cost profiling of water infrastructure projects. J Infrastruct Syst. 24(4):04018023. doi: 10.1061/(ASCE)IS.1943-555X.0000441.
  • Love PE, Edwards DJ, Irani Z. 2012. Moving beyond optimism bias and strategic misrepresentation: an explanation for social infrastructure project cost overruns. IEEE Trans Eng Manage. 59(4):560–571. doi: 10.1109/TEM.2011.2163628.
  • Love PE, Edwards DJ, Smith J. 2005. Contract documentation and the incidence of rework in projects. Architect Eng Des Manag. 1(4):247–259. doi: 10.1080/17452007.2005.9684596.
  • Love PE, Smith J, Simpson I, Regan M, Olatunji O. 2015. Understanding the landscape of overruns in transport infrastructure projects. Environ Plann B Plann Des. 42(3):490–509. doi: 10.1068/b130102p.
  • Lowe DJ, Emsley MW, Harding A. 2006. Predicting construction cost using multiple regression techniques. J Constr Eng Manage. 132(7):750–758. doi: 10.1061/(ASCE)0733-9364(2006)132:7(750).
  • Lundberg SM, Lee S-I. 2017. A unified approach to interpreting model predictions. Advances in Neural Information Processing Systems. Technical Report, Department of Computer Science and Information Engineering, University of National Taiwan, Taipei; p. 1–12.
  • Marzouk M, Elkadi M. 2016. Estimating water treatment plants costs using factor analysis and artificial neural networks. J Cleaner Prod. 112:4540–4549. doi: 10.1016/j.jclepro.2015.09.015.
  • Noorzai E, Gharouni Jafari K, Moslemi Naeni L. 2022. Lessons learned on selecting the best mass housing method based on performance evaluation criteria in Iran. Int J Construct Educ Res. 18(2):123–141. doi: 10.1080/15578771.2020.1867258.
  • Odeck J. 2004. Cost overruns in road construction—What are their sizes and determinants? Transport Policy. 11(1):43–53. doi: 10.1016/S0967-070X(03)00017-9.
  • Patel VR, Mehta RG. 2011. Impact of outlier removal and normalization approach in modified k-means clustering algorithm. Int J Comp Sci Issues (IJCSI). 8(5):331.
  • Petroutsatou K, Georgopoulos E, Lambropoulos S, Pantouvakis JP. 2012. Early cost estimating of road tunnel construction using neural networks. J Constr Eng Manage. 138(6):679–687. doi: 10.1061/(ASCE)CO.1943-7862.0000479.
  • Pham TQD, Le-Hong T, Tran XV. 2023. Efficient estimation and optimization of building costs using machine learning. Int J Construct Manag. 23(5):909–921. doi: 10.1080/15623599.2021.1943630.
  • Pourrostam T, Ismail A, Mansournejad M. 2011. Identification of success factors in minimizing delays on construction projects in IAU-Shoushtar Branch-Iran. AMM. 94–96:2189–2193. doi: 10.4028/www.scientific.net/AMM.94-96.2189.
  • Rafiei MH, Adeli H. 2018. A novel unsupervised deep learning model for global and local health condition assessment of structures. Eng Struct. 156:598–607. doi: 10.1016/j.engstruct.2017.10.070.
  • Safarishahrbijari A. 2018. Workforce forecasting models: a systematic review. J Forecast. 37(7):739–753. doi: 10.1002/for.2541.
  • Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Project Manage. 25(5):517–526. doi: 10.1016/j.ijproman.2006.11.007.
  • Sanni-Anibire MO, Mohamad Zin R, Olatunji SO. 2022. Causes of delay in the global construction industry: a meta analytical review. Int J Construct Manag. 22(8):1395–1407. doi: 10.1080/15623599.2020.1716132.
  • Sohrabi H, Noorzai E. 2022. Risk-supported case-based reasoning approach for cost overrun estimation of water-related projects using machine learning. Eng Constr Archit Manage. doi: 10.1108/ECAM-05-2022-0450.
  • Stanitsas M, Kirytopoulos K, Leopoulos V. 2021. Integrating sustainability indicators into project management: the case of construction industry. J Cleaner Prod. 279:123774. doi: 10.1016/j.jclepro.2020.123774.
  • Sweis GJ. 2013. Factors affecting time overruns in public construction projects: the case of Jordan. IJBM. 8(23):120. doi: 10.5539/ijbm.v8n23p120.
  • Wu Y, Feng J. 2018. Development and application of artificial neural network. Wireless Pers Commun. 102(2):1645–1656. doi: 10.1007/s11277-017-5224-x.
  • Ye K, Shen L, Tan Y. 2010. Response strategies to the competition in the Chinese construction market. Construct Manag Econom. 28(2):115–124. doi: 10.1080/01446190903473774.
  • Zou PX, Zhang G, Wang J. 2007. Understanding the key risks in construction projects in China. Int J Project Manage. 25(6):601–614. doi: 10.1016/j.ijproman.2007.03.001.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.