An integrated approach to investigate the causes of time delays and cost overruns in Afghanistan construction projects

&
Received 06 Dec 2023, Accepted 08 Apr 2024, Published online: 24 Apr 2024

References

  • Abd El-Razek M, Bassioni H, Mobarak A. 2008. Causes of delay in building construction projects in Egypt. J Constr Eng Manage. 134(11):831–841. doi: 10.1061/(ASCE)0733-9364(2008)134:11(831).
  • Aibinu AA, Odeyinka HA. 2006. Construction delays and their causative factors in Nigeria. J Constr Eng Manage. 132(7):667–677. doi: 10.1061/(ASCE)0733-9364(2006)132:7(667).
  • Al-Hazim N, Salem ZA, Ahmad H. 2017. Delay and cost overrun in infrastructure projects in Jordan. Procedia Eng. 182:18–24. doi: 10.1016/j.proeng.2017.03.105.
  • Alinaitwe H, Apolot R, Tindiwensi D. 2013. Investigation into the causes of delays and cost overruns in Uganda’s public sector construction projects. J Constr Develop Countries. 18(2):33–47.
  • Al-Momani AH. 2000. Construction delay: a quantitative analysis. Int J Project Manage. 18(1):51–59. doi: 10.1016/S0263-7863(98)00060-X.
  • Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int J Project Manage. 24(4):349–357. doi: 10.1016/j.ijproman.2005.11.010.
  • Assaf SA, Al-Khalil M, Al-Hazmi M. 1995. Causes of delay in large building construction projects. J Manage Eng. 11(2):45–50. doi: 10.1061/(ASCE)0742-597X(1995)11:2(45).
  • Ayat M, Rehman H, Qureshi SM, Kang CW. 2023. Assessing the causes of project overruns in tunnel construction projects in Pakistan. Int J Construct Manag. 23(11):1856–1866. doi: 10.1080/15623599.2021.2017541.
  • Chan DWM, Kumaraswamy MM. 1997. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage. 15(1):55–63. doi: 10.1016/S0263-7863(96)00039-7.
  • Doloi H, Sawhney A, Iyer KC, Rentala S. 2012. Analyzing factors affecting delays in Indian construction projects. Int J Project Manage. 30(4):479–489. doi: 10.1016/j.ijproman.2011.10.004.
  • Durdyev S, Hosseini MR. 2020. Causes of delays on construction projects: a comprehensive list. IJMPB. 13(1):20–46. doi: 10.1108/p0IJMPB-09-2018-0178.
  • Elawi GSA, Algahtany M, Kashiwagi D. 2016. Owners’ perspective of factors contributing to project delay: case studies of road and bridge projects in Saudi Arabia. Procedia Eng. 145:1402–1409. doi: 10.1016/j.proeng.2016.04.176.
  • Enshassi A, Al-Najjar J, Kumaraswamy M. 2009. Delays and cost overruns in the construction projects in the Gaza Strip. J Financ Manag Proper Construct. 14(2):126–151. doi: 10.1108/13664380910977592.
  • Fellows R, Liu A. 2008. Research methods for construction. 3rd ed. Oxford: Blackwell Science.
  • Frimpong Y, Oluwoye J, Crawford L. 2003. Causes of delay and cost overruns in construction of groundwater projects in developing countries, Ghana as a case study. Int J Proj Manage. 21(5):321–326. doi: 10.1016/S0263-7863(02)00055-8.
  • Fugar FD, Agyakwah-Baah AB. 2010. Delays in building construction projects in Ghana. AJCEB. 10(1-2):103–116. doi: 10.5130/ajceb.v10i1/2.1592.
  • Gómez-Cabrera A, Gutierrez-Bucheli L, Muñoz S. 2023. Causes of time and cost overruns in construction projects: a scoping review. Int J Construct Manage. 1–19. doi: 10.1080/15623599.2023.2252288.
  • Gündüz M, Nielsen Y, Özdemir M. 2013. Quantification of delay factors using the relative importance index method for construction projects in Turkey. J Manage Eng. 29(2):133–139. doi: 10.1061/(ASCE)ME.1943-5479.0000129.
  • Iyer KC, Jha KN. 2005. Factors affecting cost performance: evidence from Indian construction projects. Int J Project Manage. 23(4):283–295. doi: 10.1016/j.ijproman.2004.10.003.
  • Johnson RM, Babu RII. 2020. Time and cost overruns in the UAE construction industry: a critical analysis. Int J Constr Manage. 20(5):402–411. doi: 10.1080/15623599.2018.1484864.
  • Kakar AS, Hasan A, Jha KN. 2020. Schedule success factors in construction projects in a war-affected region. J Leg Aff Dispute Resolut Eng Constr. 12(3):05020008. doi: 10.1061/(ASCE)LA.1943-4170.0000417.
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Project Manage. 27(5):522–531. doi: 10.1016/j.ijproman.2008.07.003.
  • Khoshgoftar M, Bakar AHA, Osman O. 2010. Causes of delays in Iranian construction projects. Int J Constr Manag. 10(2):53–69. doi: 10.1080/15623599.2010.10773144.
  • Kikwasi G. 2013. Causes and effects of delays and disruptions in construction projects in Tanzania. Australas. J. Constr. Econ. Build. 1(2):52–59.
  • Koushki PA, Al‐Rashid K, Kartam N. 2005. Delays and cost increases in the construction of private residential projects in Kuwait. Construct Man Econ. 23(3):285–294. doi: 10.1080/0144619042000326710.
  • Larsen JK, Shen GQ, Lindhard SM, Brunoe TD. 2015. Factors affecting schedule delay, cost overrun, and quality level in public construction projects. J Manage Eng. 32(1):10. Article 04015032. doi: 10.1061/(asce)me.1943-5479.0000391.
  • Le-Hoai L, Lee YD, Lee JY. 2008. Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries. KSCE J Civ Eng. 12(6):367–377. doi: 10.1007/s12205-008-0367-7.
  • Mansfield NR, Ugwu OO, Doran T. 1994. Causes of delay and cost overruns in Nigerian construction projects. Int J Project Manage. 12(4):254–260. doi: 10.1016/0263-7863(94)90050-7.
  • Niazi GA, Painting N. 2017. Significant factors causing cost overruns in the construction industry in Afghanistan. Procedia Eng. 182(1):510–517. doi: 10.1016/j.proeng.2017.03.145.
  • Peterson RA. 2013. Constructing effective questionnaires. Thousand Oaks (CA): Sage Publications.
  • Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Project Manage. 25(5):517–526. doi: 10.1016/j.ijproman.2006.11.007.
  • Sanni-Anibire MO, Mohamad Zin R, Olatunji SO. 2022. Causes of delay in the global construction industry: a meta analytical review. Int J Constr Manag. 22(8):1395–1407. doi: 10.1080/15623599.2020.1716132.
  • Santoso DS, Soeng S. 2016. Analyzing delays of road construction projects in Cambodia: causes and effects. J Manage Eng. 32(6):5016020. doi: 10.1061/(ASCE)ME.1943-5479.0000467.
  • Selcuk O, Turkoglu H, Polat G, Hajdu M. 2022. An integrative literature review on the causes of delays in construction projects: evidence from developing countries. Int J Construct Manag. 24(6):610–622. doi: 10.1080/15623599.2022.2135939.
  • Sweis GJ, Sweis R, Rumman MA, Hussein RA, Dahiyat SE. 2013. Cost overruns in public construction projects: the case of Jordan. J Am Sci. 9(7):134–141.
  • Taha G, Badawy M, El-Nawawy O. 2016. A model for evaluation of delays in construction projects. Int J Innov Res Sci Eng Technol. 5(3):3021–3028.
  • Terwee CB, Bot SD, de Boer MR, van der Windt DA, Knol DL, Dekker J, Bouter LM, de Vet HC. 2007. Quality criteria were proposed for measurement properties of health status questionnaires. J Clin Epidemiol. 60(1):34–42. doi: 10.1016/j.jclinepi.2006.03.012.
  • Toor SUR, Ogunlana SO. 2008. Problems causing delays in major construction projects in Thailand. Construction Man & Econ. 26(4):395–408. doi: 10.1080/01446190801905406.
  • Trading Economics. 2020. The GDP value of Afghanistan represents 0.01 percent of the,macro models and analysts expectations. https://tradingeconomics.com/afghanistan/gdp-:∼:text=the World Bank.
  • United Nations Population Fund. 2023. https://www.unfpa.org/data/world-population/AF
  • World Bank. 2021. GDP, PPP (current international $) – Afghanistan. https://data.worldbank.org/indicator/ny.gdp.mktp.pp.cd?locations=AF
  • Yin RK. 2017. Case study research: design and methods. 6th ed. Newbury Park (CA): Sage
  • Zidane YJT, Andersen B. 2018. The top 10 universal delay factors in construction projects. IJMPB. 11(3):650–672. doi: 10.1108/IJMPB-05-2017-0052.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.