Publication Cover
Structure and Infrastructure Engineering
Maintenance, Management, Life-Cycle Design and Performance
Volume 15, 2019 - Issue 12
301
Views
3
CrossRef citations to date
0
Altmetric
Original Articles

Capturing the spatial and operational interdependencies among building systems using building information modelling

ORCID Icon & ORCID Icon
Pages 1613-1629 | Received 11 Oct 2018, Accepted 17 Apr 2019, Published online: 16 Jul 2019

References

  • Akinci, B., Tantisevi, K., & Ergen, E. (2003). Assessment of the capabilities of a commercial 4D CAD system to visualize equipment space requirements on construction sites. Construction Research Congress: Wind of Change: Integration and Innovation (pp. 1–7). Hawaii: ASCE.
  • Amirebrahimi, S., Rajabifard, A., Mendis, P., & Ngo, T. (2016). A BIM-GIS integration method in support of the assessment and 3D visualisation of flood damage to a building. Journal of Spatial Science, 61(2, 317–350. doi:10.1080/14498596.2016.1189365
  • Asen, Y. (2012). Building information modeling based integration and visualization for facilities management (Doctoral dissertation). Concordia University, Montreal.
  • Atef, A. (2015). Asset management tools for municipal infrastructure considering interdependency and vulnerability (Doctoral dissertation). Concordia University, Montreal.
  • Atef, A., & Bristow, D. (2017a). Modeling spatial and operational interdependencies among building systems using building information modeling. The 2017 Canadian Society of Civil Engineering Conference. Vancouver: CSCE.
  • Atef, A., & Bristow, D. (2017b). Trends, benefits and challenges in utilizing building information modeling technology for building operation and maintenance. The 2017 Canadian Society of Civil Engineering Conference. Vancouver: CSCE.
  • Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM – A case study approach. Automation in Construction, 24, 149–159. doi:10.1016/j.autcon.2012.02.008
  • Bristow, D. (2016). Building information modeling enabled dependency risk analysis for resilient building design and operation. Mitacs Accelerate Proposal 1–5, Research Proposal, 2016 Website: https://www.mitacs.ca/en/projects/building-information-modeling-enabled-dependency-risk-analysis-resilient-building-design-0.
  • Bristow, D. N., & Hay, A. H. (2016). Graph model for probabilistic resilience and recovery planning of multi-infrastructure systems. Journal of Infrastructure Systems, 23(3), 1–23. doi:10.1061/(ASCE)IS.1943-555X.0000338
  • Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building information modelling (BIM). International Journal of Project Management, 31(7), 971–980. doi:10.1016/j.ijproman.2012.12.001
  • Chau, K. W., Anson, M., & Zhang, J. P. (2004). Four-dimensional visualization of construction scheduling and site utilization. Journal of Construction Engineering and Management, 130(4), 598–606. doi:10.1061/(ASCE)0733-9364(2004)130:4(598)
  • Clough, R., Sears, G., & Sears, S. (2008). Construction project management: A practical guide to field construction management. Hoboken, NJ: Wiley.
  • Cromwell, J. E. (2002). Costs of infrastructure failure. American Water Works. Association Denver, Colorado, USA.
  • Crucitti, P., Latora, V., Marchiori, M., & Rapisarda, A. (2003). Efficiency of scale-free networks: Error and attack tolerance. Physica A: Statistical Mechanics and Its Applications, 320, 622–642. doi:10.1016/S0378-4371(02)01545-5
  • Dudenhoeffer, D. D., Permann, M. R., & Manic, M. (2006). CIMS: A framework for infrastructure interdependency modeling and analysis. Proceedings of the 38th conference on Winter Simulation, (pp. 478–485). California, USA.
  • Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013). BIM implementation throughout the UK construction project lifecycle: An analysis. Automation in Construction, 36, 145–151. doi:10.1016/j.autcon.2013.09.001
  • Ganan, A., Bouchlaghem, N. B., & Anumba, C. (2005). VISCON: Computer visualisation support for constructability. Journal of Information Technology in Construction, 10, 69–83. Retrieved from http://www.itcon.org/2005/7
  • Haimes, Y. Y., & Jiang, P. (2001). Leontief-based model of risk in complex interconnected infrastructures. Journal of Infrastructure Systems, 7(1), 1–12. doi:10.1061/(ASCE)1076-0342(2001)7:1(1)
  • Haimes, Y. Y., Horowitz, B. M., Lambert, J. H., Santos, J. R., Lian, C., & Crowther, K. G. (2005). Inoperability input-output model for interdependent infrastructure sectors. I: Theory and methodology. Journal of Infrastructure Systems, 11(2), 67–79. doi:10.1061/(ASCE)1076-0342(2005)11:2(67)
  • Ibrahim, M. (2015). Models for efficient automated site data acquisition (Doctoral dissertation). Concordia University, Montreal.
  • Insurance Bureau of Canada [IBC] (2017). Canada’s P&C insurance industry, all sectors. Toronto: Insurance Bureau of Canada. Retrieved from http://assets.ibc.ca/Documents/Facts%20Book/Facts_Book/2017/Fact-Book-Section-1.pdf
  • Islam, T., & Moselhi, O. (2012). Modeling geospatial interdependence for integrated municipal infrastructure. Journal of Infrastructure Systems, 18(2), 68–74. doi:10.1061/(ASCE)IS.1943-555X.0000065
  • Jrade, A., & Lessard J. (2015). “An Integrated BIM System to Track the Time and Cost of Construction Projects: A Case Study,” Journal of Construction Engineering, vol. 2015, Article ID 579486, 1–10. doi:10.1155/2015/579486
  • Jalaei, F., & Jrade, A. (2015). Integrating building information modeling (BIM) and LEED system at the conceptual design stage of sustainable buildings. Sustainable Cities and Society, 18, 95–107. doi: doi:10.1016/j.scs.2015.06.007
  • Jiang, L., & Leicht, R. M. (2014). Automated rule-based constructability checking: Case study of formwork. Journal of Management in Engineering, 31(1), 456–478. doi:10.1061/(ASCE)ME.1943-5479.0000304
  • Khanzode, A., Fischer, M., & Reed, D. (2005). Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project. 13th International Group for Lean Construction Conference: Proceedings, Sydney, Australia.
  • König, M., Koch, C., Habenicht, I., & Spieckermann, S. (2012). Intelligent BIM-based construction scheduling using discrete event simulation. Proceedings of the Winter Simulation Conference, Berlin, Germany, 9–12 Dec 2012.
  • Krukowski, A., & Arsenijevic, D. (2010). RFID-based positioning for building management systems. Proceedings of 2010 IEEE International Symposium on Circuits and Systems (pp. 3569–3572). Paris, France: IEEE. doi:10.1109/ISCAS.2010.5537800
  • Lee, E. E., Mitchell, J. E., & Wallace, W. A. (2004). Assessing vulnerability of proposed designs for interdependent infrastructure systems. The 37th Hawaii International Conference on System Sciences (pp. 1–8). Hawaii: IEEE.
  • Lee, S. I., Bae, J. S., & Cho, Y. S. (2012). Efficiency analysis of set-based design with structural building information modeling (S-BIM) on high-rise building structures. Automation in Construction, 23, 20–32. doi:10.1016/j.autcon.2011.12.008
  • Lee, S. K., Kim, K. R., & Yu, J. H. (2014). BIM and ontology-based approach for building cost estimation. Automation in Construction, 41, 96–105. doi: doi:10.1016/j.autcon.2013.10.020
  • Macal, C. M., & North, M. J. (2005). Tutorial on agent-based modeling and simulation. The 2005 proceedings of the winter simulation conference. Orlando: IEEE.
  • Montaser, A. (2013). Automated site data acquisition for effective project control (Doctoral dissertation). Concordia University, Montreal.
  • O’Neill, P. (2013). Protecting critical infrastructure by identifying pathways of exposure to risk. Technology Innovation Management Review, 3(8), 34–40. doi:10.22215/timreview/714
  • Oti, A. H., Kurul, E., Cheung, F., & Tah, J. H. (2016). A framework for the utilization of building management system data in building information models for building design and operation. Automation in Construction, 72, 195–210. doi:10.1016/j.autcon.2016.08.043
  • Rinaldi, S. M., Peerenboom, J. P., & Kelly, T. K. (2001). Identifying, understanding, and analyzing critical infrastructure interdependencies. IEEE Control Systems, 21(6), 11–25. doi:10.1109/37.969131
  • Santos, J. R., & Haimes, Y. Y. (2004). Modeling the demand reduction input‐output (I‐O) inoperability due to terrorism of interconnected infrastructures. Risk Analysis: An International Journal, 24(6), 1437–1451. doi:10.1111/j.0272-4332.2004.00540.x
  • Satumtira, G., & Dueñas-Osorio, L. (2010). Synthesis of modeling and simulation methods on critical infrastructure interdependencies research. In Sustainable and resilient critical infrastructure systems (pp. 1–51). Berlin: Springer. doi:10.1007/978-3-642-11405-2_1
  • Setayeshgar, S. (2014). Improving safety on construction sites using bim-based dynamic virtual fences and ultra-wideband technology (Master’s thesis). Concordia University, Montreal.
  • Shahata, K. F. (2013). Decision-support framework for integrated asset management of major municipal infrastructure (Doctoral dissertation). Concordia University, Montreal.
  • Soltani, M. (2013). Neighborhood localization method for locating construction resources based on RFID and BIM (Master’s thesis). Concordia University, Montreal.
  • Staub, S., Fischer, M., & Spradlin, M. (1998). Industrial case study of electronic design, cost and schedule integration. In Working Paper, Nr. 48, CIFE, Stanford.
  • Sterman, J. D. (2000). Business dynamics: systems thinking and modeling for a complex world. Boston, MA: McGraw-Hill.
  • Wetzel, E. M., & Thabet, W. Y. (2015). The use of a BIM-based framework to support safe facility management processes. Automation in Construction, 60, 12–24. doi:10.1016/j.autcon.2015.09.004
  • Wu, L., Wen, Y., Zhou, C., Xiao, C., & Zhang, J. (2013). Modeling the vulnerability of waterway networks. Journal of Waterway, Port, Coastal, and Ocean Engineering, 140(4), 1–6. doi:10.1061/(ASCE)WW.1943-5460.0000238

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.