References
- Chen, Y. J. (2011). Structured methodology for supplier selection and evaluation in a supply chain. Information Sciences, 181, 1651–1670.10.1016/j.ins.2010.07.026
- Ho, W., Xu, X., & Dey, P. K. (2010). Multi -criteria decision making approaches for supplier evaluation and selection: A literature review. European Journal of Operational Research, 202(1), 16–24.10.1016/j.ejor.2009.05.009
- Jin, Y., Ryan, J. K., & Yund, W. (2014). Two stage procurement processes with competitive suppliers and uncertain supplier quality. IEEE Transactions on Engineering Management, 61, 147–158.10.1109/TEM.2013.2266276
- Lin, C. J., & Kuo, H. H. (2014). Multiple comparisons with the best for supplier selection. Quality and Reliability Engineering International, 30(7), 1083–1092.10.1002/qre.1599
- Lin, C. J., & Pearn, W. L. (2010). Process selection for higher production yield based on capability index Spk. Quality and Reliability Engineering International, 26(3), 247–258.10.1002/qre.v26:3
- Lin, C. J., & Pearn, W. L. (2011). Group selection for production yield among k manufacturing lines. Journal of Statistical Planning and Inference, 141(4), 1510–1518.10.1016/j.jspi.2010.11.013
- Pearn, W. L., & Wu, C. H. (2013). Supplier selection critical decision values for processes with multiple independent lines. Quality and Reliability Engineering International, 29(6), 899–909.10.1002/qre.v29.6
- Pearn, W. L., Wu, C. W., & Lin, H. C. (2007). Procedure for supplier selection based on Cpm applied to super twisted nematic liquid crystal display processes. International Journal of Production Research, 42(13), 2719–2734.
- Pearn, W. L., Hung, H. N., & Cheng, Y. C. (2009). Supplier selection for one-sided processes with unequal sample sizes. European Journal of Operational Research, 195(2), 381–393.10.1016/j.ejor.2008.01.050
- Pearn, W. L., Hung, H. N., Chuang, Y. S., & Su, R. H. (2011). An effective powerful test for one-sided supplier selection problem. Journal of Statistical Computation and Simulation, 81(10), 1313–1331.10.1080/00949655.2010.483475
- Pearn, W. L., Tai, Y. T., & Wang, C. Y. (2012). An effective powerful test for supplier selection evaluation with multiple characteristics. Journal of Testing and Evaluation, 40(4), 633–642.
- Pearn, W. L., Tai, Y. T., & Wu, C. H. (2016). A note on production yield measure for multiple lines. Quality Technology & Quantitative Management, 13(4), 394–402.10.1080/16843703.2016.1191150
- Pearn, W. L., Wu, C. H., & Chung, C. C. (2014). An effective procedure for supplier selection applied to glass substrate processes with multiple lines. Journal of Testing and Evaluation, 42(6), 1458–1465.
- Tai, Y. T., Pearn, W. L., & You, S. K. (2011). An effective test for supplier selection evaluation with multiple characteristics. Journal of Testing and Evaluation, 39(6), 1165–1173.
- Wan, Z., Beil, D. R., & Katok, E. (2012). Why does it pay to delay supplier qualification? Theory and experiments Management Science, 58(11), 2057–2075.10.1287/mnsc.1120.1539