335
Views
40
CrossRef citations to date
0
Altmetric
Articles

Optimal design of the adaptive EWMA chart for the mean based on median run length and expected median run length

, ORCID Icon, &
Pages 439-458 | Received 30 Jun 2017, Accepted 01 Apr 2018, Published online: 18 Apr 2018

References

  • Aly, A. A., Hamed, R., & Mahmoud, M. A. (2017). Optimal design of the adaptive exponentially weighted moving average control chart over a range of mean shifts. Communications in Statistics-Simulation and Computation, 46(2), 890–902.
  • Aly, A. A., Mahmoud, M. A., & Hamed, R. (2016). The performance of the multivariate adaptive exponentially weighted moving average control chart with estimated parameters. Quality and Reliability Engineering International, 32(3), 957–967.
  • Aly, A. A., Saleh, N. A., Mahmoud, M. A., & Woodall, W. H. (2015). A reevaluation of the adaptive exponentially weighted moving average control chart when parameters are estimated. Quality and Reliability Engineering International, 31(8), 1611–1622.
  • Bilen, C., Khan, A., & Chattinnawat, W. (2017). Dual-monitoring scheme for multivariate autocorrelated cascade processes with EWMA and MEWMA charts. Quality Technology & Quantitative Management, 14(2), 156–177.
  • Bischak, D. P., & Trietsch, D. (2007). The rate of false signals in *** control charts with estimated limits. Quality Control & Applied Statistics, 39(1), 54–65.
  • Capizzi, G., & Masarotto, G. (2003). An adaptive exponentially weighted moving average control chart. Technometrics, 45(3), 199–207.
  • Capizzi, G., & Masarotto, G. (2008). Practical design of generalized likelihood ratio control charts for autocorrelated data. Technometrics, 50(3), 357–370.
  • Castagliola, P., Celano, G., & Psarakis, S. (2011). Monitoring the coefficient of variation using EWMA charts. Journal of Quality Technology, 43(3), 249–265.
  • Chakraborti, S. (2007). Run length distribution and percentiles: The Shewhart chart with unknown parameters. Quality Engineering, 19(2), 119–127.
  • Crowder, S. V. (1987). Average run lengths of exponentially weighted moving average control charts. Journal of Quality Technology, 19(3), 161–164.
  • Eleftheriou, M., & Farmakis, N. (2016). A continuous sampling plan based on EWMA control chart rules. Quality Technology & Quantitative Management, 13(1), 16–28.
  • Gan, F. F. (1993). An optimal design of EWMA control charts based on median run length. Journal of Statistical Computation and Simulation, 45(3), 169–184.
  • Gan, F. F. (1994). An optimal design of cumulative sum control chart based on median run length. Communications in Statistics-Simulation and Computation, 23(2), 485–503.
  • Golosnoy, V., & Schmid, W. (2007). EWMA control charts for monitoring optimal portfolio weights. Sequential Analysis, 26(2), 195–224.
  • Han, D., & Tsung, F. (2006). A reference-free cuscore chart for dynamic mean change detection and a unified framework for charting performance comparison. Journal of the American Statistical Association, 101(473), 368–386.
  • Haridy, S., Rahim, M. A., Selim, S. Z., Wu, Z., & Benneyan, J. C. (2017). EWMA chart with curtailment for monitoring fraction nonconforming. Quality Technology & Quantitative Management, 14(4), 412–428.
  • Hu, X. L., Castagliola, P., Sun, J. S., & Khoo, M. B. C. (2015). The effect of measurement errors on the synthetic *** chart. Quality and Reliability Engineering International, 31(8), 1769–1778.
  • Huang, W., Shu, L., & Su, Y. (2014). An accurate evaluation of adaptive exponentially weighted moving average schemes. IIE Transactions, 46(5), 457–469.
  • Jones, L. A., Champ, C. W., & Rigdon, S. E. (2004). The run length distribution of the CUSUM with estimated parameters. Journal of Quality Technology, 36(1), 95–108.
  • Khoo, M. B. C., Wong, V. H., Wu, Z., & Castagliola, P. (2011). Optimal designs of the multivariate synthetic chart for monitoring the process mean vector based on median run length. Quality and Reliability Engineering International, 27(8), 981–997.
  • Khoo, M. B. C., Wong, V. H., Wu, Z., & Castagliola, P. (2012). Optimal design of the synthetic chart for the process mean based on median run length. IIE Transactions, 44(9), 765–779.
  • Lee, M. H., & Khoo, M. B. C. (2017). Optimal designs of multivariate synthetic |s| control chart based on median run length. Communications in Statistics-Theory and Methods, 46(6), 3034–3053.
  • Low, C. K., Khoo, M. B. C., Teoh, W. L., & Wu, Z. (2012). The revised m-of-k runs rule based on median run length. Communications in Statistics-Simulation and Computation, 41(8), 1463–1477.
  • Lu, S. L., & Huang, C. J. (2017). Statistically constrained economic design of maximum double EWMA control charts based on loss functions. Quality Technology & Quantitative Management, 14(3), 280–295.
  • Lucas, J. M., & Saccucci, M. S. (1990). Exponentially weighted moving average control schemes: Properties and enhancements. Technometrics, 32(1), 1–12.
  • Mahmoud, M. A., & Zahran, A. R. (2010). A multivariate adaptive exponentially weighted moving average control chart. Communications in Statistics-Theory and Methods, 39(4), 606–625.
  • Maravelakis, P. E., Castagliola, P., & Khoo, M. B. C. (2017). Run length properties of run rules EWMA chart using integral equations. Quality Technology & Quantitative Management, 1–11 doi:10.1080/16843703.2017.1372853
  • Maravelakis, P. E., Panaretos, J., & Psarakis, S. (2005). An examination of the robustness to non normality of the EWMA control charts for the dispersion. Communications in Statistics-Simulation and Computation, 34(4), 1069–1079.
  • Mei, Y. (2008). Is average run length to false alarm always an informative criterion? Sequential Analysis, 27(4), 354–376.
  • Nyau, S. Y., Ming, H. L., & Wong, M. L. D. (2017). Optimal statistical design of variable sample size multivariate exponentially weighted moving average control chart based on median run-length. Quality Technology & Quantitative Management, 14(4), 478–495.
  • Reynolds, M. R., & Stoumbos, Z. G. (2006). Comparisons of some exponentially weighted moving average control charts for monitoring the process mean and variance. Technometrics, 48(4), 550–567.
  • Ryu, J. H., Wan, H., & Kim, S. (2010). Optimal design of a CUSUM chart for a mean shift of unknown size. Journal of Quality Technology, 42(3), 311–326.
  • Saleh, N. A., Mahmoud, M. A., & Abdel-Salam, A. S. G. (2013). The performance of the adaptive exponentially weighted moving average control chart with estimated parameters. Quality and Reliability Engineering International, 29(4), 595–606.
  • Shmueli, G., & Cohen, A. (2003). Run-length distribution for control charts with runs and scans rules. Communications in Statistics-Theory and Methods, 32(2), 475–495.
  • Shu, L. J. (2008). An adaptive exponentially weighted moving average control chart for monitoring process variances. Journal of Statistical Computation and Simulation, 78(4), 367–384.
  • Simões, B. F. T., Epprecht, E. K., & Costa, A. F. B. (2010). Performance comparisons of EWMA control chart schemes. Quality Technology & Quantitative Management, 7(3), 249–261.
  • Su, Y., Shu, L. J., & Tsui, K. L. (2011). Adaptive EWMA procedures for monitoring processes subject to linear drifts. Computational Statistics & Data Analysis, 55(10), 2819–2829.
  • Tang, A. A., Castagliola, P., Sun, J. S., & Hu, X. L. (2017). An adaptive exponentially weighted moving average chart for the mean with variable sampling intervals. Quality and Reliability Engineering International, 33(8), 2023–2034.
  • Teoh, W. L., Chong, J. K., Khoo, M. B. C., Castagliola, P., & Yeong, W. C. (2017). Optimal designs of the variable sample size *** chart based on median run length and expected median run length. Quality and Reliability Engineering International, 33(1), 121–134.
  • Teoh, W. L., Khoo, M. B. C., Castagliola, P., & Chakraborti, S. (2014). Optimal design of the double sampling chart with estimated parameters based on median run length. Computers & Industrial Engineering, 67, 104–115.
  • Teoh, W. L., Khoo, M. B. C., Castagliola, P., & Lee, M. H. (2016). The exact run length distribution and design of the Shewhart chart with estimated parameters based on median run length. Communications in Statistics-Simulation and Computation, 45(6), 2081–2103.
  • Wang, H., Sun, H., Li, C. H., Rahnamayan, S., & Pan, J. S. (2013). Diversity enhanced particle swarm optimization with neighborhood search. Information Sciences, 223(2), 119–135.
  • Woodall, W. H., & Mahmoud, M. A. (2005). The inertial properties of quality control charts. Technometrics, 47(4), 425–436.
  • Yashchin, E. (1987). Some aspects of the theory of statistical control schemes. IBM Journal of Research and Development, 31(2), 199–205.
  • You, H. W., Khoo, M. B. C., Castagliola, P., & Qu, L. (2016). Optimal exponentially weighted moving average charts with estimated parameters based on median run length and expected median run length. International Journal of Production Research, 54(17), 5073–5094.
  • Zwetsloot, I. M., Schoonhoven, M., & Does, R. J. (2016). Robust point location estimators for the EWMA control chart. Quality Technology & Quantitative Management, 13(1), 29–38.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.