References
- Acosta-Mejia, C. A. (1999). Improved p charts to monitor process quality. IIE Transactions, 31(6), 509–516. https://doi.org/https://doi.org/10.1080/07408179908969854
- Albers, W., Kallenberg, W. C., & Nurdiati, S. (2005). Exceedance probabilities for parametric control charts. Statistics, 39(5), 429–443. https://doi.org/https://doi.org/10.1080/02331880500310181
- Alevizakos, V., & Koukouvinos, C. (2019). A double exponentially weighted moving average chart for time between events. Communications in Statistics: Simulation and Computation, 1–20. https://doi.org/https://doi.org/10.1080/03610918.2018.1532516
- Alevizakos, V., Koukouvinos, C., & Lappa, A. (2019). Monitoring of time between events with a double generally weighted moving average control chart. Quality and Reliability Engineering International35(2), 685–710. https://doi.org/https://doi.org/10.1002/qre.2430
- Ali, S., Pievatolo, A., & Göb, R. (2016). An overview of control charts for high-quality processes. Quality and Reliability Engineering International, 32(7), 2171–2189. https://doi.org/https://doi.org/10.1002/qre.1957
- Calvin, T. W. (1983). Quality control techniques for zero-defects. IEEE Transactions on Components, Hybrids, and Manufacturing Technology, 6(3), 323–328. https://doi.org/https://doi.org/10.1109/TCHMT.1983.1136174
- Chakraborti, S. (2000). Run length, average run length and false alarm rate of shewhart x-bar chart: Exact derivations by conditioning. Communications in Statistics - Simulation and Computation, 29(1), 61–81. https://doi.org/https://doi.org/10.1080/03610910008813602
- Chakraborti, S. (2006). Parameter estimation and design considerations in prospective applications of the X¯ chart. Journal of Applied Statistics, 33(4), 439–459. https://doi.org/https://doi.org/10.1080/02664760500163516
- Chakraborti, S. (2007). Run length distribution and percentiles: The shewhart chart with unknown parameters. Quality Engineering, 19(2), 119–127. https://doi.org/https://doi.org/10.1080/08982110701276653
- Chan, L. Y., Xie, M., & Goh, T. N. (2000). Cumulative quantity control charts for monitoring production processes. International Journal of Production Research, 38(2), 397–408. https://doi.org/https://doi.org/10.1080/002075400189482
- Chang, T. C., & Gan, F. F. (2007). Modified Shewhart charts for high yield processes. Journal of Applied Statistics, 34(7), 857–877. https://doi.org/https://doi.org/10.1080/02664760701546279
- Chen, G. (1997). The mean and standard deviation of the run length distribution of charts when control limits are estimated. Statistica Sinica, 7(3), 789–798. https://www.jstor.org/stable/24306122
- Cheng, Y., Sun, L., & Guo, B. (2018). Phase II synthetic exponential charts and effect of parameter estimation. Quality Technology & Quantitative Management, 15(1), 125–142. https://doi.org/https://doi.org/10.1080/16843703.2017.1304046
- Chong, Z. L., Tan, K. L., Khoo, M. B., Teoh, W. L., & Castagliola, P. (2020). Optimal designs of the exponentially weighted moving average (EWMA) median chart for known and estimated parameters based on median run length. Communications in Statistics: Simulation and Computation, 1–25. https://doi.org/https://doi.org/10.1080/03610918.2020.1721539
- Diko, M. D., Chakraborti, S., & Graham, M. A. (2016). Monitoring the process mean when standards are unknown: A classic problem revisited. Quality and Reliability Engineering International, 32(2), 609–622. https://doi.org/https://doi.org/10.1002/qre.1776
- Faraz, A., Saniga, E., & Montgomery, D. (2019). Percentile-based control chart design with an application to Shewhart X and S 2 control charts. Quality and Reliability Engineering International, 35(1), 116–126. https://doi.org/https://doi.org/10.1002/qre.2384
- Gan, F. F. (1992). Exact run length distributions for one-sided exponential CUSUM schemes. Statistica Sinica, 2(1), 297–312. https://www.jstor.org/stable/24304133
- Gan, F. F. (1994). Design of Optimal Exponential CUSUM Control Charts. Journal of Quality Technology, 26(2), 109–124. https://doi.org/https://doi.org/10.1080/00224065.1994.11979511
- Gan, F. F. (1998). Designs of one- and two-sided exponential EWMA charts. Journal of Quality Technology, 30(1), 55–69. https://doi.org/https://doi.org/10.1080/00224065.1998.11979819
- Gan, F. F., & Chang, T. C. (2000). Computing average run lengths of exponential EWMA charts. Journal of Quality Technology, 32(2), 183–187. https://doi.org/https://doi.org/10.1080/00224065.2000.11979989
- Goedhart, R., Da Silva, M. M., Schoonhoven, M., Epprecht, E. K., Chakrabortic, S., Does, R. J., & Veiga, Á. (2017). Shewhart control charts for dispersion adjusted for parameter estimation. IISE Transactions, 49(8), 838–848. https://doi.org/https://doi.org/10.1080/24725854.2017.1299956
- Goedhart, R., Schoonhoven, M., & Does, R. J. (2018). On guaranteed in-control performance for the Shewhart X and control charts. Journal of Quality Technology, 50(1), 130–132. https://doi.org/https://doi.org/10.1080/00224065.2018.1404876
- Hu, X., Castagliola, P., Tang, A., & Zhong, J. (2019). Guaranteed conditional performance of the median run length based EWMA chart with unknown process parameters. Communications in Statistics - Simulation and Computation, 1–20. https://doi.org/https://doi.org/10.1080/03610918.2019.1642485
- Hu, X. L., Castagliola, P., Tang, A. A., Zhou, X. J., & Zhou, P. P. (2020). Conditional median run length performance of the synthetic X¯ chart with unknown process parameters. Quality and Reliability Engineering International, 36(3), 1111–1131. https://doi.org/https://doi.org/10.1002/qre.2618
- Huang, S., Mukherjee, A., & Yang, J. (2018). Two CUSUM schemes for simultaneous monitoring of parameters of a shifted exponential time to events. Quality and Reliability Engineering International, 34(6), 1158–1173. https://doi.org/https://doi.org/10.1002/qre.2314
- Jardim, F. S., Chakraborti, S., & Epprecht, E. K. (2020). Two perspectives for designing a phase II control chart with estimated parameters: The case of the Shewhart X¯ Chart. Journal of Quality Technology, 52(2), 198–217. https://doi.org/https://doi.org/10.1080/00224065.2019.1571345
- Kumar, N. (2020). Conditional analysis of Phase II exponential chart for monitoring times to an event. Quality Technology & Quantitative Management, 17(3), 285–306. https://doi.org/https://doi.org/10.1080/16843703.2019.1613772
- Kumar, N., & Baranwal, A. (2019). Design and implementation of q th quantile-unbiased tr tr -chart for monitoring times between events. Quality and Reliability Engineering International, 35(4), 1061–1080. https://doi.org/https://doi.org/10.1002/qre.2445
- Kumar, N., & Chakraborti. (2016). Phase II Shewhart-type control charts for monitoring times between events and effects of parameter estimation. Quality and Reliability Engineering International, 32(1), 315–328. https://doi.org/https://doi.org/10.1002/qre.1752
- Kumar, N., Chakraborti, S., & Rakitzis, A. C. (2017). Improved Shewhart-type charts for monitoring times between events. Journal of Quality Technology, 49(3), 3. https://doi.org/https://doi.org/10.1080/00224065.2017.11917995
- Kumar, N., & Jaiswal, S. (2020). Use of median-based estimator to construct Phase II exponential chart. Quality and Reliability Engineering International, 36(6), 2044–2056. https://doi.org/https://doi.org/10.1002/qre.2672
- Liu, J. Y., Xie, M., Goh, T. N., & Sharma, P. R. (2006). A comparative study of exponential time between events charts. Quality Technology & Quantitative Management, 3(3), 347–359. https://doi.org/https://doi.org/10.1080/16843703.2006.11673120
- Mei, Y. (2008). Is average run length to false alarm always an informative criterion? Sequential Analysis, 27(4), 354–376. https://doi.org/https://doi.org/10.1080/07474940802445790
- Montgomery, D. C. (2012). Introduction to Statistical Quality Control (7 ed ed.). John Wiley.
- Qiao, Y. L., Sun, J. S., Castagliola, P., & Hu, X. L. (2020). Optimal design of one-sided exponential EWMA charts based on median run length and expected median run length. Communications in Statistics - Theory and Methods, 1–21. https://doi.org/https://doi.org/10.1080/03610926.2020.1782937.
- Qu, L., Khoo, M., Castegliola, P., & He, Z. (2018). Exponential cumulative sums chart for detecting shifts in time-between-events. Quality and Reliability Engineering International, 56(10), 3683–3698. https://doi.org/https://doi.org/10.1080/00207543.2017.1412523
- Quesenberry, C. P. (1993). The effect of sample size on estimated limits for x and x control chrats. Journal of Quality Technology, 25(4), 237–247. https://doi.org/https://doi.org/10.1080/00224065.1993.11979470
- Rakitzis, A. C. (2016). Monitoring exponential data using two-sided control charts with runs rules. Journal of Statistical Computation and Simulation, 86(1), 149–159. https://doi.org/https://doi.org/10.1080/00949655.2014.998219
- Rizzo, C., Chin, S. T., van den Heuvel, E., & Di Bucchianico, A. (2020). Performance measures of discrete and continuous time-between-events control charts. Quality and Reliability Engineering International, 36(8), 2754–2768. https://doi.org/https://doi.org/10.1002/qre.2687
- Saleh, N. A., Mahmoud, M. A., Keefe, M. J., & Woodall, W. H. (2015). The difficulty in designing Shewhart X-bar and X control charts with estimated parameters. Journal of Quality Technology, 47(2), 127–138. https://doi.org/https://doi.org/10.1080/00224065.2015.11918120
- Santiago, E., & Smith, J. (2013). Control charts based on the exponential distribution: Adapting runs rules for the t chart. Quality Engineering, 25(2), 85–96. https://doi.org/https://doi.org/10.1080/08982112.2012.740646
- Sarmiento, M. G. C., Chakraborti, S., & Epprecht, E. K. (2017). Conditional median run length as performance measure of Shewhart control chart with estimated parameter. In Joint Statistical Meeting 2017: Quality and Productivity Section, number (pp. 3304–3323). 2012.
- Shah, M. T., Azam, M., Aslam, M., & Sherazi, U. (2021). Time between events control charts for gamma distribution. Quality and Reliability Engineering International, 37(2), 785–803. https://doi.org/https://doi.org/10.1002/qre.2763
- Tang, A., Castagliola, P., Sun, J., & Hu, X. (2019). Optimal design of the adaptive EWMA chart for the mean based on median run length and expected median run length. Quality Technology & Quantitative Management, 16(4), 439–458. https://doi.org/https://doi.org/10.1080/16843703.2018.1460908
- Teoh, W. L., Chong, J. K., Khoo, M. B., Castagliola, P., & Yeong, W. C. (2017). Optimal designs of the variable sample size X¯chart based on median run length and expected median run length. Quality and Reliability Engineering International, 33(1), 121–134. https://doi.org/https://doi.org/10.1002/qre.1994
- Teoh, W. L., Khoo, M. B., Castagliola, P., & Chakraborti, S. (2015). A median run length-based double-sampling X ¯ chart with estimated parameters for minimizing the average sample size. International Journal of Advanced Manufacturing Technology, 80(1–4), 411–426. https://doi.org/https://doi.org/10.1007/s00170-015-6949-x
- Vardeman, S., & Ray, D. (1985). Average run lengths for CUSUM schemes when observations are exponentially distributed. Technometrics, 27(2), 145–150. https://doi.org/https://doi.org/10.1080/00401706.1985.10488031
- Wang, F., Bizuneh, B., & Abebe, T. (2017). A comparison study of control charts for Weibull distributed time between events. Quality and Reliability Engineering International, 33(8), 2747–2759. https://doi.org/https://doi.org/10.1002/qre.2238
- Xie, M., Goh, T. N., & Ranjan, P. (2002). Some effective control chart procedures for reliability monitoring. Reliability Engineering and System Safety, 77(2), 143–150. https://doi.org/https://doi.org/10.1016/S0951-8320(02)00041-8
- Xie, Y. J., Tsui, K. L., Xie, M., & Goh, T. N. (2010). Monitoring time-between-events for health management. In Prognostics and Health Management Conference, 2010. PHM’10 IEEE, (pp. 1–8). Macao, China: IEEE. https://doi.org/https://doi.org/10.1109/PHM.2010.5413412
- Yang, J., Yu, H., Cheng, Y., & Xie, M. (2015). Design of exponential control charts based on average time to signal using a sequential sampling scheme. International Journal of Production Research, 53(7), 2131–2145. https://doi.org/https://doi.org/10.1080/00207543.2014.974848
- Zhang, C. W., Xie, M., & Goh, T. N. (2006). Design of exponential control charts using a sequential sampling scheme. IIE Transactions, 38(12), 1105–1116. https://doi.org/https://doi.org/10.1080/07408170600728905
- Zhang, C. W., Xie, M., Liu, J. Y., & Goh, T. N. (2007). A control chart for the gamma distribution as a model of time between events. International Journal of Production Research, 45(23), 5649–5666. https://doi.org/https://doi.org/10.1080/00207540701325082
- Zhang, M., Megahed, F. M., & Woodall, W. H. (2014). Exponential CUSUM charts with estimated control limits. Quality and Reliability Engineering International, 30(2), 275–286. https://doi.org/https://doi.org/10.1002/qre.1495