135
Views
0
CrossRef citations to date
0
Altmetric
Research Article

An efficient and effective method for reliability assessment of project duration

, &
Pages 689-706 | Accepted 15 Oct 2022, Published online: 05 Dec 2022

References

  • Abramowitz, M., & Stegun, I. A. (1972). Handbook of mathematical functions. Dover.
  • Ahuja, H. N., Dozzi, S. P., & Abourizk, S. M. (1994). Project management: Techniques in planning and controlling construction projects. Wiley.
  • Ang, A. H., Chaker, A. A., & Abdelnour, J. (1975). Analysis of activity networks under uncertainty. Journal of Engineering Mechanics Division, 101(4), 373–387. https://doi.org/10.1061/JMCEA3.0002028
  • Anklesaria, K. P., & Drezner, Z. (1986). A multivariate approach to estimating the completion time for PERT networks. The Journal of the Operational Research Society, 37(8), 811–815. https://doi.org/10.1057/jors.1986.140
  • Arsham, H. (1999). Stability analysis of the critical path in project activity networks. Civil Engineering and Environmental Systems, 15, 305–334. https://doi.org/10.1080/02630259908970245
  • Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling. Wiley.
  • Brook, A. C., Leahy, J. P., & Shaffer, L. R. (1967). A man – machine CPM system for decision making in the construction industry. Civil engineering studies, construction research series (Vol. 9). University of Illinois, Urbana, Illinois.
  • Diaz, C. F. (1989). Probabilistic network analyses for construction projects. M.S. thesis, Ohio State Univ.
  • Diaz, C. F., & Hadipriono, F. C. (1993). Nondeterministic networking methods. Journal of Construction Engineering and Management, 119(1), 40–57. https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(40)
  • Ditlevsen, O. (1979). Narrow reliability bounds for structural systems. Journal of Structural Mechanics, 7(4), 453–472. https://doi.org/10.1080/03601217908905329
  • Gong, D., & Hugsted, R. (1993). Time-uncertainty analysis in project networks with a new merge-event time-estimation technique. International Journal of Project Management, 11(3), 165–173. https://doi.org/10.1016/0263-7863(93)90049-S
  • Guo, Q. L., Maher, M., & Wamuziri, S. (2001). Risk analysis in construction networks using a modified stochastic assignment model. Civil Engineering and Environmental Systems, 18(3), 215–241. https://doi.org/10.1080/02630250108970301
  • Halpin, D. W., & Riggs, L. S. (1992). Planning and analysis of construction operations. Wiley.
  • Jun, D. H., & El-Rayes, K. (2011). Fast and accurate risk evaluation for scheduling large-scale construction projects. Journal of Computing in Civil Engineering, 25(5), 407–417. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000106
  • Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and controlling. Wiley.
  • Lee, D., & Arditi, D. (2006). Automated statistical analysis in stochastic project scheduling simulation. Journal of Construction Engineering and Management, 132(3), 268–277. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(268)
  • Lin, Y., Chang, K., C, P., & Cho, Y. L. (2019). Reliability interval for a stochastic project network constrained by budget and time. Quality Technology & Quantitative Management, 16(1), 82–94. https://doi.org/10.1080/16843703.2017.1369651
  • Li, G., Ng, S. H., & Tan, H. Y. (2020). Bayesian optimal designs for efficient estimation of the optimum point with generalised linear models. Quality Technology & Quantitative Management, 17(1), 89–107. https://doi.org/10.1080/16843703.2018.1542965
  • Liu, S., Hu, L., Liu, Z., & Wang, Y. (2021). Reliability of a retrial system with mixed standby components and Bernoulli vacation. Quality Technology & Quantitative Management, 18(2), 248–265. https://doi.org/10.1080/16843703.2020.1853320
  • Li, C. Q., Zhang, G., & Hosseinian, M. (2016). A fast and accurate method to predict reliability of project completion time. Journal of Civil Engineering and Management, 23(1), 37–46. https://doi.org/10.3846/13923730.2014.953570
  • Li, P. P., Zhao, Y. G., & Zhao, Z. (2022). Efficient method for fully quantifying the uncertainty of failure probability. Computer Methods in Applied Mechanics and Engineering, 399, 115345. https://doi.org/10.1016/j.cma.2022.115345
  • Lu, M., & Abourizk, S. M. (2000). Simplified CPM/PERT simulation model. Journal of Construction Engineering and Management, 126(3), 219–226. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:3(219)
  • Malcolm, D. G., Roseboom, J. H., Clark, C. E., & Fazar, W. (1959). Application of a technique for research and development program evaluation. Operations Research, 7(5), 646–669. https://doi.org/10.1287/opre.7.5.646
  • Melchers, R. E. (1999). Structural reliability analysis and prediction. Wiley.
  • Mo, J., Yin, Y., & Gao, M. (2008). State of the art of correlation–based models of project scheduling networks. IEEE Transactions on Engineering Management, 55(2), 349–358. https://doi.org/10.1109/TEM.2008.919702
  • Nasir, D., McCabe, B., & Hartono, L. (2003). Evaluating risk in construction schedule model (ERIC-S): Construction schedule risk model. Journal of Construction Engineering and Management, 129(5), 518–527. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:5(518)
  • Ograjensek, I., & Žabkar, B. (2010). Enhancing the value of survey data on customer satisfaction in the framework of a customer loyality programme: Case of a Slovenian retailer. Quality Technology & Quantitative Management, 7(2), 133–147. https://doi.org/10.1080/16843703.2010.11673224
  • Okmen, O., & Oztas, A. (2008). Construction project network evaluation with correlated schedule risk analysis model. Journal of Construction Engineering and Management, 134(1), 49–63. https://doi.org/10.1061/(ASCE)0733-9364(2008)134:1(49)
  • Rackwitz, R. (2001). Reliability analysis - a review and some perspectives. Structural Safety, 23(4), 365–395. https://doi.org/10.1016/S0167-4730(02)00009-7
  • Robb, D. J. (1992). Scheduling in a management context: Stochastic tasks and nonregular reward functions. Unpublished Doctoral Dissertation, Faculty of Management. University of Calgary.
  • Robb, D. J., & Silver, E. A. (1993). Scheduling in a management context: Uncertain processing times and non-regular performance measures. Decision Sciences, 24(6), 1085–1108. https://doi.org/10.1111/j.1540-5915.1993.tb00505.x
  • Sculli, D. (1989). A simulation solution to the PERT problem. IMA Journal of Management Mathematics, 2(3), 255–265. https://doi.org/10.1093/imaman/2.3.255
  • Sculli, D., & Shum, Y. W. (1991). An approximate solution to the PERT problem. Computers & Mathematics with Applications, 21(8), 1–7. https://doi.org/10.1016/0898-1221(91)90046-7
  • Slyke, R. M. V. (1963). Monte Carlo methods and the PERT problem. Operations Research, 11(5), 839–860. https://doi.org/10.1287/opre.11.5.839
  • Soltanali, H., Rohani, A., Tabasizadeh, M., Abbaspour-Fard, M. H., & Parida, A. (2020). Operational reliability evaluation-based maintenance planning for automotive production line. Quality Technology & Quantitative Management, 17(2), 186–202. https://doi.org/10.1080/16843703.2019.1567664
  • Williams, T. (2004). Why Monte Carlo simulations of project networks can mislead? Project Management Journal, 35(3), 53–61. https://doi.org/10.1177/875697280403500307
  • Wu, J., Zhang, D., Jiang, C., Han, X., & Li, Q. (2021). On reliability analysis method through rotational sparse grid nodes. Mechanical Systems and Signal Processing, 147, 107106. https://doi.org/10.1016/j.ymssp.2020.107106
  • Wu, J., Zhang, D., Liu, J., Jia, X., & Han, X. (2020). A computational framework of kinematic accuracy reliability analysis for industrial robots. Applied Mathematical Modelling, 82, 189–216. https://doi.org/10.1016/j.apm.2020.01.005
  • Xu, H., & Rahman, S. (2004). A generalized dimension‐reduction method for multidimensional integration in stochastic mechanics. International Journal for Numerical Methods in Engineering, 61(12), 1992–2019. https://doi.org/10.1002/nme.1135
  • Yang, I. T. (2005). Impact of budget uncertainty on project time-cost trade off. IEEE Transactions on Engineering Management, 52(2), 167–174. https://doi.org/10.1109/TEM.2005.844924
  • Yang, I. T., Lin, Y. C., & Lee, Y. C. (2014). Use of support vector regression to improve computational efficiency of stochastic time-cost trade-off. Journal of Construction Engineering and Management, 140(1), 04013036. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000784
  • Yu, L., & Mishra, A. (2012). Experience in predicting fault-prone software modules using complexity metrics. Quality Technology & Quantitative Management, 9, 421–434. https://doi.org/10.1080/16843703.2012.11673302
  • Zhang, D., Han, Z., Wang, F., & Han, X. (2021). Proficiency of statistical moment-based methods for analysis of positional accuracy reliability of industrial robots. International Journal of Mechanics and Materials in Design, 17(2), 403–418. https://doi.org/10.1007/s10999-021-09532-2
  • Zhao, Y. G., & Ang, A. H. S. (2003). System reliability assessment by method of moments. Journal of Structural Engineering, 129(10), 1341–1349. https://doi.org/10.1061/(ASCE)0733-9445(2003)129:10(1341)
  • Zhao, Y. G., & Lu, Z. H. (2021). Structural reliability: Approaches from perspectives of statistical moments. Wiley.
  • Zhao, Y. G., & Ono, T. (2000). New point estimates for probability moments. Journal of Engineering Mechanics, 126(4), 433–436. https://doi.org/10.1061/(ASCE)0733-9399(2000)126:4(433)
  • Zhao, Y. G., & Ono, T. (2001). Moment methods for structural reliability. Structure Safety, 23(1), 47–75. https://doi.org/10.1016/S0167-4730(00)00027-8

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.