References
- Cassidy M, Martin C, Houlsby G. 2004. Development and application of force resultant models describing jack-up foundation behaviour. Mar Struct. 17:165–193.
- Ellis J, Shirley R. 2005. A weighty issue. Offshore Eng. April 2005: 125–128.
- Geiger PR. 2004. Offshore drilling and production vessels. In: Lamb T, editor. Ship design and construction. Jersey City (NJ): Society of Naval Architects and Marine Engineers. p. 1–51.
- Global Chimaks. 2009. Drilling rigs. Available from: http://www.globalchimaks.com/drilling_rigs.
- Halkyard J. 2005. Floating offshore platform design. In: Chakrabarti S, editor. Handbook of offshore engineering. Amsterdam: Elsevier B.V. p. 419–661.
- Hamada K, Wake T, Kusuhara Y, Koyama Y, Nakatsuji K. 1982. Making and fabricating of steel components for jack-up rig legs. . Tokyo: Kawasaki Steel. Kawasaki Steel Technical Report No. 6.
- Jablonowski C, Strachan A. 2009. Cost modeling of deepwater oil and gas facilities: a case study of spars and tension leg platforms. Ships Offshore Struct. 4(1):69–76.
- LeTourneau Technologies. 2011. Offshore products. Rig designs. Super 116E. Super 116E brochure. . Available from: http://www.letourneautechnologies.com/offshore/resources/docs/super116E_v8.pdf.
- Macy RH. 1966. Mobile drilling platforms. J Pet Technol. 18(9):1069–1081.
- Massie W, Liu P. 1990. The jackup durability problem. . Paper presented at: the European Petroleum Conference; Oct 21–24; The Hague, Netherlands.
- Molland AF. 2008. The maritime engineering reference book. A guide to ship design, construction and operation. Oxford (UK): Elsevier; 902 p.
- Mommaas CJ, Blankestijn EP. 1984. Development and design of two series of jackups for hostile waters. . Paper presented at: the 5th Offshore South East Asia Conference; Feb 21–24; Singapore. . SPE 12406.
- Petroprod. 2009. CJ70 D&P1 jack-up drilling rig. Monthly construction report. . Available from: http://www.petroprod.com/docs/cj70report.pdf.
- Vazquez J, Michel R, Alford J, Quah M, Foo KS. 2005. Jackup units: a technical primer for the offshore industry professional. . Available from: http://www.bbengr.com/jack_up_primer.pdf.
- William MS, Thompson RSG, Houlsby GT. 1999. A parametric study of the non-linear dynamic behavior of an offshore jack-up unit. Eng Struct. 21:383–394.
- Wang Y, Ji Z, Lin Y. 2009. Mathematically modeling the main dimensions of self-elevating drilling units. J Mar Sci Appl. 8(3):211–215.
- Yang YT, Shim SS, Lee SY, Hwang OJ, Sin BY. 2002. Innovative methodology for assembling jack up leg of 205m on ground of ultra harsh jack up rig. . Available from: http://kosfic.chonnam.ac.kr/∼haeyang/literature_information/proceeding/109/1090000015.pdf.