Interval type-2 fuzzy program evaluation and review technique for project management in shipbuilding

ORCID Icon & ORCID Icon
Pages 1872-1890 | Received 21 Mar 2021, Accepted 23 Jun 2021, Published online: 30 Jul 2021

References

  • Abd Rahman WW, Zaki NM, Husain MA. 2019. A review of work breakdown structure and man-hours estimation method used in shipbuilding production. Int. J. Mech. Eng. Technol. 10(01):1141–1158.
  • Ammar MA, Abd-ElKhalek SI. 2019. Criticality measurement in fuzzy project scheduling. Int. J. Constr. Manag.: 1–10. doi:10.1080/15623599.2019.1619226.
  • Barban O. 2016. Multiculturalism in shipbuilding projects [Master’s thesis]. University College of Southeast Norway.
  • Barbosa EG, Duarte HO, Melo S, Bonnano JV. 2019. Project management methodology for boat designing: the case of an as-built project of a 33-foot boat in a Brazilian shipyard. Trans RINA, Vol 161, Part B2, Intl J Small Craft Tech, Jul-Dec 2019, 17–30.
  • Bellman RE, Zadeh LA. 1970. Decision-making in a fuzzy environment. Manage Sci. 17(4):B-141–B-164.
  • Bevilacqua M, Ciarapica FE, Mazzuto G. 2014. Critical chain and theory of constraints applied to yachting shipbuilding: a case study. Int J Project Organ Manage. 6(4):379–397.
  • Buckley JJ. 1985. Fuzzy hierarchical analysis. Fuzzy Set Syst. 17:233–247.
  • Buckley JJ. 1989. Fuzzy PERT. In: Evans G., Karwowski W., Wilhelm M., editor. Applications of fuzzy Set methodologies in Industrial engineering. Amsterdam: Elsevier; p. 103–114.
  • Carral L, Tarrío-Saavedra J, Iglesias G, San-Cristobal JR. 2020. Evaluation of the structural complexity of organisations and products in naval-shipbuilding projects. Ships Offshore Structures. 16(6):670–685. doi:10.1080/17445302.2020.1773049.
  • Çelebi UB, Bilgili L. 2018. An innovative theory of Constraints based approach for improvement of shipyard project management. Dokuz Eylül Üniversitesi Denizcilik Fakültesi Dergisi. 10(1):1–18.
  • Chanas S, Dubois D, Zielinski P. 2002. On the sure criticality of tasks in activity networks with imprecise durations. IEEE Trans Syst, Man, Cybern – Part B: Cybern. 32:393–407.
  • Chanas S, Kamburowski J. 1981. The use of fuzzy variables in PERT. Fuzzy Sets Syst. 5(1):11–19.
  • Chanas S, Kuchta D. 1998. Discrete fuzzy optimization. In: Słowiński R., editor. Fuzzy sets in decision analysis, operations Research and statistics. The handbooks of fuzzy sets series, vol 1. Boston, MA: Springer; p. 249–280.
  • Chanas S, Zielinski P. 2001. Critical path analysis in the network with fuzzy activity times. Fuzzy Sets Syst. 122(2):195–204.
  • Chanas S, Zielinski P. 2002. The computational complexity of the criticality problems in a network with interval activity times. Eur J Oper Res. 136:541–550. https://doi.org/10.1016/S0377-2217(01)00048-0.
  • Chanas S, Zielinski P. 2003. On the hardness of evaluating criticality of activities In planar network with duration intervals. Oper Res Lett. 31:53–59.
  • Chen S. 2007. Analysis of critical paths in a project network with fuzzy activity times. Eur J Oper Res. 183(1):442–459.
  • Chen C, Huang S. 2007. Applying fuzzy method for measuring criticality in project network. Inf Sci. 177(12):2448–2458.
  • Chen SM, Lee LW. 2010. Fuzzy multiple attributes group decision-making based on the interval type-2 TOPSIS method. Expert Syst Appl. 37:2790–2798.
  • Dijk VR, Gademann AJRM, Schouten G, Schutten JMJ. 2002. Multi-project planning in shipbuilding. In Proceedings of the 11th International Conference on Computer Applications in Shipbuilding (ICCAS 2002); September, Malmö, Sweden, p. 9–12.
  • Doğan ÜB, Helvacioğlu İH. 2017. Customized project management methods and their applications in shipbuilding projects. GİDB Dergi. 10:3–20.
  • Dubois D, Fargier H, Fortin J. 2005. Computational methods for determining the latest starting times and floats of tasks in interval-valued activity networks. J Intell Manuf. 16:407–421.
  • Dubois D, Fargier H, Galavagnon V. 2003. On latest starting times and floats in activity networks with ill-known durations. Eur J Operat Res. 147(2):266–280.
  • Elaiwi AH. 2018. Efficiency of critical path method (CPM) and PERT technique for yacht construction. Int J Mech Eng Technol (IJMET). 9:11–48.
  • Fafandjel N, Zamarin A, Hadjina M. 2010. Shipyard production cost structure optimization model related to product type. Int J Prod Res. 48(5):1479–1491.
  • Gazdik I. 1983. Fuzzy network planning. IEEE Trans Reliab R-32(3):304–313.
  • Haghighi MH, Mousavi SM, Antuchevičienė J, Mohagheghi V. 2019. A new analytical methodology to handle time-cost trade-off problem with considering quality loss cost under interval-valued fuzzy uncertainty. Technol Econ Dev Econ. 25(2):277–299. https://doi.org/10.3846/tede.2019.8422.
  • Han D, Yang B, Li J, Sun M, Zhou Q, Wang J. 2017. A three-layer parallel computing system for shipbuilding project scheduling optimization. Adv Mech Eng. 9(109):1–17.
  • Hapke M, Jaszkiewicz A, Slowinski R. 1994. Fuzzy project scheduling system for software development. Fuzzy Sets Syst. 67:101–117.
  • Hapke M, Slowinski R. 1996. Fuzzy priority heuristics for project scheduling. Fuzzy Sets Syst. 83:291–299.
  • Jaswar and Syafwan bin Anah. 2013. Traditional ship production case study in Kepulauan Riau-Indonesia. Departement of Aeronautic, Automotive and Ocean Engineering, Faculty of Mechanical, University Teknologi Malaysia.
  • Jiang G, Feng D, Zhu W. 2016. Toward efficient merchant shipbuilding based on the lean production methodology. J Ship Prod Design. 32(4): 245–257
  • Johansen D. 2019. Shipbuilding projects in Norway: Joint risk management in shipbuilding projects [Master’s thesis]. University of South-Eastern Norway.
  • Kahraman C, Kaya I. 2010. A fuzzy multicriteria methodology for selection among energy alternatives. Expert Syst Appl. 37(9):6270–6281. https://doi.org/10.1016/j.eswa.2010.02.095.
  • Kaufmann A, Gupta MM. 1985. Introduction to fuzzy arithmetic theory and applications. New York, NY: Van Nostrand Reinhold Publishing Co.
  • Kelley J. 1961. Critical path planning and scheduling—mathematical basis. Oper Res. 9:296–320.
  • Kim H, Lee SS, Park JH, Lee JG. 2005. A model for a simulation-based shipbuilding system in a shipyard manufacturing process. Int J Computer Integr Manuf. 18(6):427–441.
  • Lee LW, Chen SM. 2008. Fuzzy multiple attributes group decision-making based on the extension of TOPSIS method and interval type-2 fuzzy sets. Proceedings of the Seventh International Conference on Machine Learning and Cybernetics, Kunming, 12–15 July 2008.
  • Lin CK, Shaw HJ. 2017. Feature-based estimation of preliminary costs in shipbuilding. Ocean Eng. 144:305–319.
  • Liu F, Chen C, Wu W. 2017. Research on intelligent design of luxury yacht. Procedia Eng. 174:927–933.
  • Liu X, Li Z, Wang X, Zhao W. 2008. Study on dynamic production planning system oriented to shipbuilding process. In 2008 IEEE Industry Applications Society Annual Meeting, 5-9 October Admonton, AB Canada, p. 1–6. IEEE.
  • Lorterapong P, Moselhi O. 1996. Project network analysis using fuzzy sets theory. Constr Eng Manage, ASCE. 122(4):308–318.
  • Malcolm DD, Roseboom JS, Clarc CI, Fazar W. 1959. Application of a technique for research and development program evaluation. Oper Res. 7(5):646–669.
  • Mascaraque-Ramírez C, Para-González L, Moreno-Sánchez D. 2018. Improvement of the construction project of tuna purse seine vessels through a cost and term analysis. Ships Offsh Struct. 13(1):20–27. doi:10.1080/17445302.2017.1335576.
  • McCahon CS. 1993. Using PERT as an approximation of fuzzy project-network analysis. IEEE Trans Eng Manage. 40:146–153.
  • Mccahon CS, Lee ES. 1988. Project network analysis with fuzzy activity times. Comput Math Appl. 15(10):829–838.
  • Mei Y, Zeng Z, Ye J. 2020. A computing model: the closed-loop optimal control for large-scale one-of-a-kind production based on multilevel hierarchical PERT-Petri net. IEEE Trans Eng Manage. 1–13.
  • Mendel JM, John RI, Liu F. 2006. Interval type-2 fuzzy logic systems made simple. IEEE Trans Fuzzy Syst. 14(6):808–821.
  • Mohagheghi V, Meysam S, Mousavi SM, Vahdani B. 2017. Analyzing project cash flow by a new interval type-2 fuzzy model with an application to construction industry. Neural Comput Appl. 28:3393–3341. doi:10.1007/s00521-016-2235-6.
  • Mullai N, Surya R. 2019. Neutrosophic project evaluation and review techniques. Neutrosophic Sets Syst. 24:1–9.
  • Müller-Plath G, Jung D, Müller M. 2018. Research-based design and usability guidelines for electronic charting systems (ECS) in yachting and boating. Int J e-Navig Maritime Econ. 10:032–048.
  • Nasution SH. 1994. Fuzzy critical path method. IEEE Trans Syst, Man, Cybern. 24:48–57.
  • Niewiadomski A, Ochelska J, Szczepaniak PS. 2006. Interval-valued linguistic summaries of databases. Control Cybern. 35(2):415–443.
  • Para-González L, Mascaraque-Ramírez C. 2020. The six dimensions of CSR as a driver of key results in the shipbuilding industry. Corporate Soc Responsibility Environ Manage. 27(2):576–584.
  • Park C, Chung KH, Park JC, Cho KK, Baek TH, Son EI. 2002. A spatial scheduling application at the block paint shop in shipbuilding: the HYPOS project. Prod Plan Control. 13(4):342–354.
  • Prade H. 1979. Using fuzzy sets theory in a scheduling problem: a case study. Fuzzy Sets Syst. 2:153–165.
  • Roh MI, Lee KY. 2018. Analysis of ship owner’s requirements. In Computational Ship Design, p. 15–18. Singapore: Springer.
  • Rommelfanger H. 1994. Network analysis and information flow in fuzzy environment. Fuzzy Sets Syst. 67:119–128.
  • Shetelig H. 2013. Shipbuilding Cost Estimation. Master’s Thesis, University of Trondheim, Trondheim, Norway, 2013.
  • Shipley MF, De Korvin A, Omer K. 1997. BIFPET methodology versus PERT in project management: fuzzy probability instead of the beta distribution. J Eng Tech Manage. 14(1):49–65.
  • Taşdemir A, Nohut S. 2020. An overview of wire arc additive manufacturing (WAAM) in shipbuilding industry. Ships Offsh Struct. 1–18. doi:10.1080/17445302.2020.1786232.
  • Tonchia S, Mahagaonkar. 2018. Industrial project management. Berlin, Germany: Springer.
  • Tresnadi A, Suparno S, Sutrisno S. 2020, October. Analysis of the acceleration time and optimal costs of the shipbuilding project specified in the electrical system with the critical path method. In Sttal Postgraduate-Internatıonal Conference (Vol. 4, No. 1).
  • Turan E, Asar R. 2020. Ship repair and maintenance management: application of PERT analysis on a tanker vessel. J Ship Prod Design. 36(3): 181–188.
  • Uçal Sari I, Öztayşi B, Kahraman C. 2013. Fuzzy analytic hierarchy process using type-2 fuzzy sets: An Application to warehouse location selection. In: M. Doumpos, E. Grigoroudis, editors. Multicriteria decision Aid and artificial intelligence. West Sussex, United Kingdom: Wiley; p. 285–308. https://doi.org/10.1002/9781118522516.ch12.
  • UNCTAD. 2020. Review of Maritime Transport 2020, New York: United Nations Publications. ISBN 978-92-1-112993-9.
  • Veenstra AW, Ludema MW. 2006. The relationship between design and economic performance of ships. Maritime Policy Manage. 33(2):159–171. doi:10.1080/03088830600612880.
  • Vose D. 2008. Risk analysis: a quantitative guide. West Sussex, England: Wiley.
  • Zadeh LA. 1965. Fuzzy sets. Inf Control. 8(3):338–353. https://doi.org/10.1016/S0019-9958(65)90241-X.
  • Zadeh LA. 1975. The concept of a linguistic variable and its application to approximate reasoning-I. Inf Sci (Ny). 8(3):199–249. https://doi.org/10.1016/0020-0255(75)90036-5.
  • Zeng J, Min A, Smith NJ. 2007. Application of fuzzy based decision-making methodology to construction project risk assessment. Int J Proj Manage. 25:589–600.
  • Zhou HG, Wang Z, Liu JF, Tian GZ, Jing XW, Li L. 2020. Research on block storage yard scheduling according to grid method. Concurrency Comput: Practice Exp. 32(23):1–11.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.