References
- Ansari, S., Bell, J., & Okano, H. (2007). Target costing: Uncharted research territory. In C. S. Chapman, A. G. Hopwood, & M. D. Shields (Eds.), Handbook of management accounting research (pp. 507–530). Oxford: Elsevier.
- Ballard, G. (2000). The last planner system of production control (PhD thesis). University of Birmingham, UK.
- Ballard, G. (2008). The lean project delivery system: An update. Lean Construction Journal, 1–19. Retrieved from http://www.leanconstruction.org/media/library/id53/The_Lean_Project_Delivery_System_An_Update.pdf
- Ballard, G. (2011). Target value design: Current benchmark (1.0). Lean Construction Journal, 79–84. Retrieved from http://www.leanconstruction.org/media/library/id58/Target_Value_Design_Current_Benchmark.pdf
- Ballard, G., & Reiser, P. (2004). The St. Olaf college fieldhouse project: A case study in designing to target cost. Proceeding 12th Annual Conference of the International Group for Lean Construction (IGLC), Elsinore, Denmark
- Cohen, J. (2010). Integrated project delivery: Case studies. (Report for AIA/AIA-California Council). Retrieved from the American Institute of Architects website. Retrieved from http://www.aia.org/about/initiatives/AIAB082049
- Cooper, R., & Kaplan, R. (1999). Design of cost management systems. Upper Saddle River, NJ: Prentice Hall.
- Denerolle, S. (2013). Technical report: The application of target value design to the design phase of 3 hospital projects. Retrieved from https://s3-us-west-2.amazonaws.com/tvdgroup/publications/Technical+Report+on+the+design+phase+of+3+TVD+projects.pdf
- Do, D., Chen, C., Ballard, G., & Tommelein, I. (2014). Target value design as a method for controlling project cost overruns. Proceeding 22nd Annual Conference of the International Group for Lean Construction (IGLC), Oslo, Norway. Retrieved from http://www.iglc.net/Papers/Details/1065/pdf
- Dyer, G., & Wilkins, A. (1991). Better stories, not better constructs, to generate better theory: A rejoinder to Eisenhardt. Academy of Management Review, 16(3), 613–619. Retrieved from http://www.jstor.org/stable/258920?seq=1#page_scan_tab_contents
- Emmitt, S., Sander, D., & Christoffersen, A. K. (2004). Implementing value through lean design management. Proceeding 12th Annual Conference of the International Group for Lean Construction. Helsingør, Denmark
- Flyvbjerg, B. (2006). Five misunderstandings about case-study research. Qualitative Inquiry, 12(2), 219–245. doi:10.1177/1077800405284363
- Jacomit, A. M., & Granja, A. D. (2011). An investigation into the adoption of target costing on Brazilian public social housing projects. Architectural Engineering and Design Management, 7(2), 113–127. doi:10.1080/17452007.2011.582334
- Knott, T. (1996). No business as usual. London: B.P. Education.
- Macomber, H., & Barberio, J. (2007). Target-value design: Nine foundational practices for delivering surprising client value. Lean Project Consulting. Retrieved from http://www.leanconstruction.org/media/docs/3-Target-Value-Design-LPC.pdf
- NASFA, COAA, APPA, AGC, AIA. (2010). Integrated project delivery for public and private owners. Retrieved from http://www.aia.org/aiaucmp/groups/aia/documents/pdf/aiab085586.pdf
- Nicolini, D., Tomkins, C., Holti, R., Oldman, A., & Smalley, M. (2000). Can target costing be applied in the construction industry? Evidence from two case studies. British Journal of Management, 11(4), 303–324. doi:10.1111/1467-8551.00175
- Palaneeswaran, E., Kumaraswamy, M., & Ng, T. (2003). Targeting optimum value in public sector projects through “best value”-focused contractor selection. Engineering Construction and Architectural Management, 10(6), 418–431. doi:http://dx.doi.org/10.1108/09699980310509390
- Parrish, K., Tommelein, I., & Ballard, G. (2009). Use of A3 reports to focus design and construction conversations. Proceeding construction research congress 2009: pp. 360–369. doi:10.1061/41020(339)37
- Pishdad-Bozorgi, P., Moghaddam, E., & Karasulu, Y. (2013). Advancing target price and target value design process in IPD using BIM and risk-sharing approaches. Proceeding 49th annual international associated school of construction (ASC). San Luis Obispo, California.
- Sakal, M. W. (2005). Project alliancing: A relational contracting mechanism for dynamic projects. Lean Construction Journal, 2(1), 67–79. Retrieved from http://www.leanconstruction.org/media/docs/lcj/LCJ_05_005.pdf
- Sobek II, D. K. (2008). Steps of the A3 Process. Retrieved from http://www.coe.montana.edu/IE/faculty/sobek/A3/steps.htm
- Sobek II, D. K., Ward, A. C., & Liker, J. K. (1999). Toyota's principles of set-based concurrent engineering. Sloan Management Review, 40(2), 67–83. Retrieved from http://sloanreview.mit.edu/article/toyotas-principles-of-setbased-concurrent-engineering/
- Suhr, J. (1999). The choosing by advantages decision-making system. Westport, CT: Quorum.
- Taylor, J. E., Dossick, C. S., & Garvin, M. J. (2011). Meeting the burden of proof with case-study research. Journal of Construction Engineering and Management, 137(4), 303–311. doi:http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000283
- Tommelein, I. T., Ballard, G., & Lee, H. W. (2011). Task 4 progress report: Develop target value design and delivery process to incorporate energy efficiency metrics. Report for the United States Department of Energy.
- Waara, F., & Brochner, J. (2006). Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, 132(8), 797–804. doi:http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:8(797)
- Yin, R. K. (1994). Case study research: Design and methods. Thousand Oaks, CA: Sage.
- Yli-Villamo, H. (2012). Integrated project deliveries in Finland. Lean in Public Sector Construction Conference, Tampere, Finland.
- Zimina, D., Ballard, G., & Pasquire, C. (2012). Target value design: Using collaboration and a lean approach to reduce construction cost. Construction Management and Economics, 30(5), 383–398. http://dx.doi.org/10.1080/01446193.2012.676658 doi: 10.1080/01446193.2012.676658