7,162
Views
41
CrossRef citations to date
0
Altmetric
Articles

The interdependences of BIM and supply chain partnering: empirical explorations

, &
Pages 476-494 | Received 22 Apr 2016, Accepted 11 Jul 2016, Published online: 27 Jul 2016

References

  • Adriaanse, A., Voordijk, H., & Dewulf, G. (2010). Adoption and use of interorganizational ICT in a construction project. Journal of Construction Engineering and Management, 136(9), 1003–1014. doi:http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000201
  • Azhar, S. (2011). Building Information Modeling (BIM): Trends, benefits, risks, and challenges for the AEC Industry. Leadership and Management in Engineering, 11(3), 241–252. doi:http://dx.doi.org/10.1061/(ASCE)LM.1943-5630.0000127
  • Barlish, K., & Sullivan, K. (2012). How to measure the benefits of BIM – A case study approach. Automation in Construction, 24, 149–159. doi:http://dx.doi.org/10.1016/j.autcon.2012.02.008
  • Bemelmans, J., Voordijk, H., Vos, B., & Buter, J. (2011). Assessing buyer-supplier relationship management: Multiple case-study in the Dutch construction industry. Journal of Construction Engineering and Management, 138(1), 163–176.
  • Benbasat, I., Goldstein, D. K., & Mead, M. (1987). The case research strategy in studies of information systems. MIS Quarterly, 11(3), 369–386.
  • Bengtsson, B., & Hertting, N. (2014). Generalization by mechanism thin rationality and ideal-type analysis in case study research. Philosophy of the Social Sciences, 44(6), 707–732.
  • Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of Building Information Modelling (BIM). International Journal of Project Management, 31(7), 971–980. doi:http://dx.doi.org/10.1016/j.ijproman.2012.12.001
  • Cao, D., Li, H., & Wang, G. (2014). Impacts of isomorphic pressures on BIM adoption in construction projects. Journal of Construction Engineering and Management, 140(12), doi:http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000903
  • Cao, D., Wang, G., Li, H., Skitmore, M., Huang, T., & Zhang, W. (2015). Practices and effectiveness of building information modelling in construction projects in China. Automation in Construction, 49, 113–122. doi:http://dx.doi.org/10.1016/j.autcon.2014.10.014
  • Cerovsek, T. (2011). A review and outlook for a ‘Building Information Model’ (BIM): A multi-standpoint framework for technological development. Advanced Engineering Informatics, 25(2), 224–244. doi:http://dx.doi.org/10.1016/j.aei.2010.06.003
  • Cidik, M. S., Boyd, D., & Thurairajah, N. (2014, September 1–3). Leveraging collaboration through the use of building information models. Paper presented at the proceedings 30th annual ARCOM conference, Portsmouth, UK.
  • CPIc. (2013). CPIx Pre-Contract Building Information Modelling (BIM) Execution Plan (BEP). Retrieved from www.cpic.org.uk/wp-content/uploads/2013/06/cpix_pre-contract_bim_execution_plan_bep_v2.0.pdf
  • Demian, P., & Walters, D. (2014). The advantages of information management through building information modelling. Construction Management and Economics, 32(12), 1153–1165. doi:http://dx.doi.org/10.1080/01446193.2013.777754
  • Dorée, A. G. (2004). Collusion in the Dutch construction industry: An industrial organization perspective. Building Research and Information, 32(2), 146–156. doi:http://dx.doi.org/10.1080/0961321032000172382
  • Dossick, C. S., & Neff, G. (2010). Organizational divisions in BIM-enabled commercial construction. Journal of Construction Engineering and Management, 136(4), 459–467.
  • Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013). BIM implementation throughout the UK construction project lifecycle: An analysis. Automation in Construction, 36, 145–151. doi:http://dx.doi.org/10.1016/j.autcon.2013.09.001
  • Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers, and contractors (2nd ed.). Hoboken, NJ: John Wiley & Sons.
  • EC. (2015, October 5). Growth: Internal market, Industry, Entrepreneurship and SMEs: Construction. Retrieved from http://ec.europa.eu/growth/sectors/construction/index_en.htm
  • Eisenhardt, K. M., & Graebner, M. E. (2007). Theory building from cases: Opportunities and challenges. Academy of Management Journal, 50(1), 25–32. doi:http://dx.doi.org/10.5465/AMJ.2007.24160888
  • Elmualim, A., & Gilder, J. (2014). BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3–4), 183–199.
  • Fernie, S., & Tennant, S. (2013). The non-adoption of supply chain management. Construction Management and Economics, 31(10), 1038–1058. doi:http://dx.doi.org/10.1080/01446193.2013.830186
  • GCCG. (2011). Government construction client group: BIM working party strategy paper. Retrieved from http://www.bimtaskgroup.org/wp-content/uploads/2012/03/BIS-BIM-strategy-Report.pdf
  • Gosling, J., Naim, M., Towill, D., Abouarghoub, W., & Moone, B. (2015). Supplier development initiatives and their impact on the consistency of project performance. Construction Management and Economics (5–6), 1–14. doi:http://dx.doi.org/10.1080/01446193.2015.1028956
  • Hartmann, T., van Meerveld, H., Vossebeld, N., & Adriaanse, A. (2012). Aligning building information model tools and construction management methods. Automation in Construction, 22, 605–613. doi:http://dx.doi.org/10.1016/j.autcon.2011.12.011
  • Harty, C., & Whyte, J. (2010). Emerging hybrid practices in construction design work: Role of mixed media. Journal of Construction Engineering and Management, 136(4), 468–476.
  • Leonard-Barton, D. (1990). A dual methodology for case studies: Synergistic use of a longitudinal single site with replicated multiple sites. Organization Science, 1(3), 248–266. doi:http://dx.doi.org/10.1287/orsc.1.3.248
  • London, K., & Kenley, R. (2001). An industrial organization economic supply chain approach for the construction industry: A review. Construction Management and Economics, 19(8), 777–788. doi:http://dx.doi.org/10.1080/01446190110081699
  • Love, P. E., Matthews, J., Simpson, I., Hill, A., & Olatunji, O. A. (2014). A benefits realization management building information modeling framework for asset owners. Automation in Construction, 37, 1–10. doi:http://dx.doi.org/10.1016/j.autcon.2013.09.007
  • Mahamadu, A.-M., Mahdjoubi, L., & Booth, C. A. (2014). Determinants of Building Information Modelling (BIM) acceptance for supplier integration: A conceptual model. Paper presented at the proceedings 30th Annual ARCOM conference, Portsmouth, UK.
  • Mäki, T., & Kerosuo, H. (2015). Site managers’ daily work and the uses of building information modelling in construction site management. Construction Management and Economics, 33(3), 163–175. doi:http://dx.doi.org/10.1080/01446193.2015.1028953
  • Mentzer, J. T., DeWitt, W., Keebler, J. S., Min, S., Nix, N. W., Smith, C. D., & Zacharia, Z. G. (2001). Defining supply chain management. Journal of Business Logistics, 22(2), 1–25. doi:http://dx.doi.org/10.1002/j.2158-1592.2001.tb00001.x
  • Miettinen, R., & Paavola, S. (2014). Beyond the BIM utopia: Approaches to the development and implementation of building information modeling. Automation in Construction, 43, 84–91. doi:http://dx.doi.org/10.1016/j.autcon.2014.03.009
  • Mignone, G., Hosseini, M. R., Chileshe, N., & Arashpour, M. (2016). Enhancing collaboration in BIM-based construction networks through organisational discontinuity theory: A case study of the new Royal Adelaide Hospital. Architectural Engineering and Design Management, 1–20. doi:10.1080/17452007.2016.1169987
  • Mondrup, T. F., Karlshøj, J., & Vestergaard, F. (2012). Communicate and collaborate by using building information modeling. Paper presented at the International Council for research and innovation in building and construction (CIB) W078 Conference, Beirut, Lebanon.
  • van Nederveen, S., Beheshti, R., & de Ridder, H. (2010). Supplier-driven integrated design. Architectural Engineering and Design Management, 6(4), 241–253.
  • Ozorovskaja, R., Voordijk, J. T., & Wilderom, C. P. (2007). Leadership and cultures of Lithuanian and Dutch construction firms. Journal of Construction Engineering and Management, 133(11), 900–911.
  • Pala, M., Edum-Fotwe, F., Ruikar, K., Doughty, N., & Peters, C. (2014). Contractor practices for managing extended supply chain tiers. Supply Chain Management: An International Journal, 19(1), 31–45. doi:http://dx.doi.org/10.1108/SCM-04-2013-0142
  • Porwal, A., & Hewage, K. N. (2013). Building Information Modeling (BIM) partnering framework for public construction projects. Automation in Construction, 31, 204–214. doi:http://dx.doi.org/10.1016/j.autcon.2012.12.004
  • Rezgui, Y., & Miles, J. (2010). Exploring the potential of SME alliances in the construction sector. Journal of Construction Engineering and Management, 136(5), 558–567.
  • Rijksgebouwendienst. (2012). Rgd BIM Standard, v. 1.0.1. Retrieved from http://www.rijksvastgoedbedrijf.nl/english/documents/publication/2014/07/08/rgd-bim-standard-v1.0.1-en-v1.0_2
  • Sebastian, R. (2011). Changing roles of the clients, architects and contractors through BIM. Engineering, Construction and Architectural Management, 18(2), 176–187.
  • Sebastian, R., & van Berlo, L. (2010). Tool for benchmarking BIM performance of design, engineering and construction firms in the Netherlands. Architectural Engineering and Design Management, 6(4), 254–263.
  • Segerstedt, A., Olofsson, T., Hartmann, A., & Caerteling, J. (2010). Subcontractor procurement in construction: The interplay of price and trust. Supply Chain Management: An International Journal, 15(5), 354–362. doi:http://dx.doi.org/10.1108/13598541011068288
  • Son, H., Lee, S., & Kim, C. (2015). What drives the adoption of building information modeling in design organizations? An empirical investigation of the antecedents affecting architects’ behavioral intentions. Automation in Construction, 49, 92–99. doi:http://dx.doi.org/10.1016/j.autcon.2014.10.012
  • Sporrong, J., & Kadefors, A. (2014). Municipal consultancy procurement: New roles and practices. Building Research & Information, 42(5), 616–628. doi:http://dx.doi.org/10.1080/09613218.2014.900260
  • Statsbygg. (2011). Statsbygg Building Information Modelling Manual Version 1.2 (SBM1.2). Retrieved from http://www.statsbygg.no/Files/publikasjoner/manualer/StatsbyggBIMmanualV1-2Eng2011-10-24.pdf
  • Succar, B., & Kassem, M. (2015). Macro-BIM adoption: Conceptual structures. Automation in Construction, 57, 64–79. doi:http://dx.doi.org/10.1016/j.autcon.2015.04.018
  • Succar, B., Sher, W., & Williams, A. (2012). Measuring BIM performance: Five metrics. Architectural Engineering and Design Management, 8(2), 120–142. doi:10.1080/17452007.2012.659506
  • Volk, R., Stengel, J., & Schultmann, F. (2014). Building Information Modeling (BIM) for existing buildings – Literature review and future needs. Automation in Construction, 38, 109–127. doi:http://dx.doi.org/10.1016/j.autcon.2013.10.023
  • Vrijhoef, R. (2011). Supply chain integration in the building industry: The emergence of integrated and repetitive strategies in a fragmented and project-driven industry. Amsterdam: IOS Press.
  • Wamelink, J. W. F., & Heintz, J. L. (2015). Innovating for integration: Clients as drivers of industry improvement. In F. Orstavik, A. Dainty, & C. Abbott (Eds.), Construction innovation (1st ed., pp. 149–161). West Sussex: John Wiley & Sons.
  • Yin, R. K. (1984). Case study research: Design and methods (1st ed.). Beverly Hills, CA: SAGE Publications.
  • Yin, S. Y.-L., Tserng, H. P., Toong, S. N., & Ngo, T. L. (2014). An improved approach to the subcontracting procurement process in a lean construction setting. Journal of Civil Engineering and Management, 20(3), 389–403. doi:http://dx.doi.org/10.3846/13923730.2013.801900