3,414
Views
21
CrossRef citations to date
0
Altmetric
Articles

Building design management – key success factors

, &
Pages 479-493 | Received 31 Jan 2017, Accepted 19 Jun 2017, Published online: 29 Jun 2017

References

  • Adler, P. A., & Adler, P. (1994). Observational techniques. In N. K. Denzin & Y. S. Lincoln (Eds.), Handbook of qualitative research (pp. 377–392). Thousand Oaks, CA: Sage.
  • Alvesson, M., & Sköldberg, K. (2009). Reflexive methodology: New vistas for qualitative research. London: Sage.
  • Andersen, B., & Langlo, J. A. (2016). Productivity and performance measurement in the construction sector. Paper presented at the Proceedings of the CIB World Building Congress 2016. Volume IV - Understanding Impacts and Functioning of Different Solutions Tampere, Finland.
  • Ballard, G. (2000). The last planner system of production control (PhD dissertation). Civil Engineering, The University of Birmingham, UK.
  • Ballard, G., & Koskela, L. (1998). On the agenda of design management research. Paper presented at the 6th Annual Conference of the International Group for Lean Construction, 13–15 August, Guarujá, Brazil.
  • Bell, B. S., & Kozlowski, S. W. J. (2002). A typology of virtual teams, implications for effective leadership. Group and Organization Management, 27(1), 14–49. doi: 10.1177/1059601102027001003
  • Bølviken, T. (2012). On the categorization of production: The organization-product matrix. Paper presented at the 20th Annual Conference of the International Group for Lean Construction, 18–­20 July, San Diego, USA.
  • Bølviken, T., Gullbrekken, B., & Nyseth, K. (2010). Collaborative design management. Paper presented at the 18th Annual Conference of the International Group for Lean Construction, 14–16 July, Haifa, Israel.
  • Blyth, A., & Worthington, J. (2001). Managing the brief for better design. London: Spon Press.
  • Boyle, G. (2003). Design project management. Aldershot: Ashgate.
  • Bråthen, K. (2015). Collaboration with BIM – learning from the front runners in the Norwegian industry. 8th Nordic Conference on Construction Economics and Organization, 21, 439–445.
  • Caixeta, M. C. B. F., & Fabricio, M. M. (2013). A conceptual model for the design process of interventions in healthcare buildings: A method to improve design. Architectural Engineering and Design Management, 9(2), 95–109. doi: 10.1080/17452007.2012.738040
  • Chan, A., Scott, D., & Chan, A. (2004). Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), 153–155. doi: 10.1061/(ASCE)0733-9364(2004)130:1(153)
  • Cooke-Davies, T. (2002). The ‘real’ success factors on projects. International Journal of Project Management, 20(3), 185–190. doi: 10.1016/S0263-7863(01)00067-9
  • Corbin, J. M., & Strauss, A. L. (2008). Basics of qualitative research: Techniques and procedures for developing grounded theory. Thousand Oaks, CA: Sage.
  • Creswell, J. W. (2003). Research design: Qualitative, quantitative, and mixed methods approaches. Thousand Oaks, CA: Sage.
  • Creswell, J. W. (2012). Educational research: Planning, conducting, and evaluating quantitative and qualitative research. Boston, MA: Pearson.
  • Dainty, A., Green, S., & Bagilhole, B. (2007). People and culture in construction: A reader. Abingdon: Taylor & Francis.
  • Denscombe, M. (1998). The good research guide: For small-scale social research projects. Buckingham: Open University Press.
  • Ding, Z., Ng, F., & Li, J. (2014). A parallel multiple mediator model of knowledge sharing in architectural design project teams. International Journal of Project Management, 32(1), 54–65. doi: 10.1016/j.ijproman.2013.04.004
  • Dogan, S. Z., Kiliç algici, P., Arditi, D., & Günaydin, H. M. (2015). Critical success factors of partnering in the building design process. METU Journal of the Faculty of Architecture, 32(2), 61–77. doi: 10.4305/METU.JFA.2015.2.4
  • Drucker, P. F. (2008). Management. New York, NY: Collins.
  • El. Reifi, M. H., Emmitt, S., & Ruikar, K. (2013). Developing a conceptual lean briefing process model for lean design management. Paper presented at the 21st Annual Conference of the International Group for Lean Construction. Fortaleza, Brazil.
  • Emmitt, S. (2016). The construction design manager – a rapidly evolving innovation. Architectural Engineering and Design Management, 12(2), 138–148. doi: 10.1080/17452007.2015.1136519
  • Emmitt, S., & Ruikar, K. (2013). Collaborative design management. London: Routledge.
  • Eynon, J. (2013). The design manager’s handbook. Chicester: Wiley.
  • Fink, A. (2009). How to conduct surveys: A step-by-step guide (4th ed.). Los Angeles, CA: Sage.
  • Flager, F., Welle, B., Bansal, P., Soremekun, G., & Haymaker, J. (2009). Multidisciplinary process integration & design optimization of a classroom building. Journal of Information Technology in Construction (ITcon), 14, 595–612.
  • Flyvbjerg, B. (2006, April). Five misunderstandings about case-study research. Qualitative Inquiry, 12(2), 219–245. doi: 10.1177/1077800405284363
  • Fundli, I. S., & Drevland, F. (2014). Collaborative design management – a case study paper presented at the IGLC-22Oslo, Norway, 25–27 June 2014.
  • Ghobadi, S., & D’Ambra, J. (2012). Knowledge sharing in cross-functional teams: A coopetitive model. Journal of Knowledge Management, 16(2), 285–301. doi: 10.1108/13673271211218889
  • Gilbertson, A. L. (2006). Briefing: Measuring the value of design. Proceedings of the Institution of Civil Engineers: Municipal Engineer, 159(3), 125–128.
  • Glaser, B. G., & Strauss, A. L. (1968). The discovery of grounded theory: Strategies for qualitative research. London: Weidenfeld and Nicolson.
  • Gray, C. (1994). The successful management of design: A handbook of building design management. Reading: Centre for Strategic Studies in Construction, University of Reading.
  • Gray, C., & Hughes, W. (2001). Building design management. Oxford: Butterworth-Heinemann.
  • Hansen, G. K., & Olsson, N. O. E. (2011). Layered project-layered process: Lean thinking and flexible solutions. Architectural Engineering and Design Management, 7(2), 70–84. doi: 10.1080/17452007.2011.582331
  • Jerrard, B., Ingram, J., & Hands, D. (2002). Design management case studies. London: Routledge.
  • Kaplan, R. S., & Norton, D. P. (1996). The balanced scorecard: Translating strategy into action. Boston: Harvard Business School Press.
  • Kerosuo, H. (2015). BIM-based collaboration across organizational and disciplinary boundaries through knotworking. 8th Nordic Conference on Construction Economics and Organization, 21, 201–208.
  • Knotten, V., Svalestuen, F., Hansen, G. K., & Lædre, O. (2015a). Design management in the building process – a review of current literature. 8th Nordic Conference on Construction Economics and Organization, 21(0), 120–127.
  • Knotten, V., Svalestuen, F., Hansen, G. K., & Lædre, O. (2015b). Design management in the building process: A review of current literature. Paper presented at the 8th Nordic Conference on Construction Economics and Organization. Tampere, Finland.
  • Koutsikouri, D., Austin, S., & Dainty, A. (2008). Critical success factors in collaborative multi-disciplinary design projects. Journal of Engineering, Design and Technology, 6(3), 198–226. doi: 10.1108/17260530810918243
  • Kristensen, K. H. (2013). Building design management: Management of the cooperative design and its interdisciplinary functions (Vol. 180). Trondheim: Norges teknisk-naturvitenskapelige universitet.
  • Kärnä, S., & Junnonen, J. M. (2017). Designers’ performance evaluation in construction projects. Engineering, Construction and Architectural Management, 24(1), 154–169. doi: 10.1108/ECAM-06-2015-0101
  • Kvale, S., & Brinkmann, S. (2009). Interviews: Learning the craft of qualitative research interviewing. Los Angeles, CA: Sage.
  • Love, P. E. D., Irani, Z., & Edwards, D. J. (2003). Learning to reduce rework in projects: Analysis of firm’s organizational learning and quality practices. Project Management Journal, 34(3), 13–25.
  • Mark, G. (2001). Extreme collaboration. Forthcoming in Communications of the ACM, December, 2001.
  • Mejlænder-Larsen, Ø. (2015). Generalising via the case studies and adapting the oil and gas industry’s project execution concepts to the construction industry. 8th Nordic Conference on Construction Economics and Organization, 21, 271–278.
  • Meland, Ø. (2000). Prosjekteringsledelse i byggeprosessen: suksesspåvirker eller andres alibi for fiasko? (Vol. 116). Trondheim: [Tapir].
  • Mohammed, S., Hamilton, K., Tesler, R., Mancuso, V., & McNeese, M. (2015). Time for temporal team mental models: Expanding beyond ‘what’ and ‘how’ to incorporate ‘when’. European Journal of Work and Organizational Psychology, 24(5), 693–709. doi: 10.1080/1359432X.2015.1024664
  • Olsson, N. (2009). Fleksibilitet i prosjekter: et tveegget sverd (Vol. nr. 1). Trondheim: Concept-programmet.
  • Otter, A., & Emmitt, S. (2008). Design team communication and design task complexity: The preference for dialogues. Architectural Engineering and Design Management, 4(2), 121–129. doi: 10.3763/aedm.2008.0072
  • Oyedele, L. O. (2010). Sustaining architects’ and engineers’ motivation in design firms. Engineering, Construction and Architectural Management, 17(2), 180–196. doi: 10.1108/09699981011024687
  • PMBOK. (2004). A guide to the project management body of knowledge: (PMBOK guide). Newtown Square, PA: Project Management Institute.
  • Postholm, M. B., & Jacobsen, D. I. (2011). Læreren med forskerblikk: innføring i vitenskapelig metode for lærerstudenter. Kristiansand: Høyskoleforl.
  • Ragin, C. C., & Becker, H. S. (1992). What is a case?: Exploring the foundations of social inquiry. Cambridge: Cambridge University Press.
  • Samset, K. (2010). Early project appraisal: Making the initial choices. New York, NY: Palgrave Macmillan.
  • Sanvido, V. E., & Parfitt, M. K. (1993). Checklist of critical success factors for building projects. Journal of Management in Engineering, 9(3), 243–249.
  • Savin-Baden, M., & Major, C. H. (2013). Qualitative research: The essential guide to theory and practice. London: Routledge.
  • Sinclair, D. (2011). Leading the team an architect’s guide to design management. London: RIBA.
  • Snowden, D. J., & Boone, M. (2007). A leader’s framework for decision making. Harvard Business Review (November 2007), 85(11), 69–76.
  • Svalestuen, F., Frøystad, K., Drevland, F., Ahmad, S., Lohne, J., & Lædre, O. (2015). Key elements to an effective building design team. Procedia Computer Science, 64(Conference on Project Management, ProjMAN), 838–843. doi: 10.1016/j.procs.2015.08.636
  • Thompson, J. D. (1967). Organizations in action: Social science bases of administrative theory. New York, NY: McGraw-Hill.
  • VERBI. (2015). MAXQDA 12. Retrieved from http://www.maxqda.com
  • Wang, T. F., Tang, W. Z., Qi, D. S., Shen, W. X., & Huang, M. (2016). Enhancing design management by partnering in delivery of international EPC projects: Evidence from Chinese construction companies. Journal of Construction Engineering and Management, 142(4), 04015099-1–04015099-12. doi: 10.1061/(ASCE)CO.1943-7862.0001082
  • Yin, R. K. (2014). Case study research: Design and methods. Los Angeles, CA: Sage.
  • Zidane, Y. J. T., Stordal, K. B., Johansen, A., & Van Raalte, S. (2015). Barriers and challenges in employing of concurrent engineering within the Norwegian construction projects. 8th Nordic Conference on Construction Economics and Organization, 21, 494–501.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.