752
Views
16
CrossRef citations to date
0
Altmetric
Articles

Extending the current model view definition standards to support multi-storey modular building projects

&
Pages 158-176 | Received 10 Feb 2017, Accepted 26 Sep 2017, Published online: 05 Oct 2017

References

  • Abdirad, H. (2017). Metric-based BIM implementation assessment: A review of research and practice. Architectural Engineering and Design Management, 13(1), 52–78. doi: 10.1080/17452007.2016.1183474
  • Alwisy, A., Al-Hussein, M., & Al-Jibouri, S. H. (2012, June 17–20). Bim approach for automated drafting and design for modular construction manufacturing. In Proceedings of the computing in civil engineering 2012 (pp. 221–228). Clearwater Beach, FL: American Society of Civil Engineers.
  • Annan, C. D., Youssef, M. A., & El Naggar, M. H. (2008). Seismic overstrength in braced frames of modular steel buildings. Journal of Earthquake Engineering, 13(1), 1–21. doi: 10.1080/13632460802212576
  • Annan, C. D., Youssef, M. A., & El Naggar, M. H. (2009a). Experimental evaluation of the seismic performance of modular steel-braced frames. Engineering Structures, 31(7), 1435–1446. doi: 10.1016/j.engstruct.2009.02.024
  • Annan, C. D., Youssef, M. A., & El Naggar, M. H. (2009b). Seismic vulnerability assessment of modular steel buildings. Journal of Earthquake Engineering, 13(8), 1065–1088. doi: 10.1080/13632460902933881
  • Bloor, M. S., & Owen, J. (1995). Product data exchange (1st ed.). London: UCL Press.
  • Building Lifecycle Interoperable Software (BLIS). (2016, July 7). IFC solutions factory. Retrieved from http://www.blis-project.org/IAI-MVD/
  • buildingSMART International. (2016a, March 6). Coordination view version 2.0 summary. Retrieved from http://www.buildingsmart-tech.org/specifications/ifc-view-definition/coordination-view-v2.0
  • buildingSMART International. (2016b, March 6). Ongoing projects of buildingSMART for infrastructure. Retrieved from http://www.buildingsmart-tech.org/infrastructure/projects
  • Cowles, E., & Warner, P. (2013). Prefabrication and modularization in construction: 2013 survey results. FMI Corporation. https://www.fminet.com.
  • Eastman, C. M., Jeong, Y.-S., Sacks, R., & Kaner, I. (2010). Exchange model and exchange object concepts for implementation of national BIM standards. Journal of Computing in Civil Engineering, 24(1), 25–34. doi:10.1061/(ASCE)0887-3801(2010)24:1(25 doi: 10.1061/(ASCE)0887-3801(2010)24:1(25)
  • FMI Corporation. (2017). 2017 FMI/BIMForum prefabrication survey.
  • Gielingh, W. (2008). An assessment of the current state of product data technologies. Computer-Aided Design, 40(7), 750–759. doi: 10.1016/j.cad.2008.06.003
  • Goulding, J. S., Pour Rahimian, F., Arif, M., & Sharp, M. D. (2015). New offsite production and business models in construction: Priorities for the future research agenda. Architectural Engineering and Design Management, 11(3), 163–184. doi: 10.1080/17452007.2014.891501
  • Gupta, A., Cemesova, A., Hopfe, C. J., Rezgui, Y., & Sweet, T. (2014). A conceptual framework to support solar PV simulation using an open-BIM data exchange standard. Automation in Construction, 37, 166–181. doi: 10.1016/j.autcon.2013.10.005
  • Laakso, M., & Kiviniemi, A. (2012). The IFC standard – A review of history, development, and standardization. Journal of Information Technology in Construction (ITcon), 17, 134–161.
  • Lawson, R. M., & Ogden, R. G. (2008). “Hybrid” light steel panel and modular systems. Thin-Walled Structures, 46(7–9), 720–730. doi:10.1016/j.tws.2008.01.042.
  • Lawson, R. M., & Richards, J. (2010). Modular design for high-rise buildings. Proceedings of the ICE-Structures and Buildings, 163(3), 151–164. doi: 10.1680/stbu.2010.163.3.151
  • Lee, Y.-C., Eastman, C. M., & Lee, J.-K. (2015). Validations for ensuring the interoperability of data exchange of a building information model. Automation in Construction, 58, 176–195. doi: 10.1016/j.autcon.2015.07.010
  • Lee, G., Park, Y. H., & Ham, S. (2013). Extended process to product modeling (xPPM) for integrated and seamless IDM and MVD development. Advanced Engineering Informatics, 27(4), 636–651. doi: 10.1016/j.aei.2013.08.004
  • Lu, N. (2009). The current use of offsite construction techniques in the United States construction industry. In Construction research congress 2009 (Vol. 2, pp. 946–955). Seattle,WA: ASCE.
  • McGraw Hill Construction. (2011). Prefabrication and modularization: Increasing productivity in the construction industry. Smart Market Report, McGraw Hill Construction, Bedford, MA.
  • McGraw Hill Construction. (2012). The business value of BIM in North America: Multi-year trend analysis and user ratings (2007–2012). Smart Market Report, McGraw Hill Construction, Bedford, MA.
  • Mohsen, O. M., Knytl, P. J., Abdulaal, B., Olearczyk, J., & Al-Hussein, M. (2008, December 7–10). Simulation of modular building construction. In Proceedings of the 40th conference on winter simulation (pp. 2471–2478). Miami, FL: Winter Simulation Conference.
  • National Institute of Building Sciences (NIBS). (2012). United States national building information modeling standard: Version 2.
  • Nawari, N. O. (2012). Bim standard in off-site construction. Journal of Architectural Engineering, 18(2), 107–113. doi: 10.1061/(ASCE)AE.1943-5568.0000056
  • Nawari, N. O., & Sgambelluri, M. (2010, May 12–15). The role of national BIM standard in structural design. In The 2010 structures congress joint with the North American steel construction conference (pp. 1660–1671). Orlando, FL: American Society of Civil Engineers.
  • NIST Off-Site Construction Concil. (2015). Report of the results of the 2015 off-site construction industry survey of software usage, National Institute of Building Sciences.
  • Nonko, E. (2013). World’s tallest modular building going up in Brooklyn. Retrieved January 1, 2015, from http://www.newyork.com/articles/real-estate/worlds-tallest-modular-building-going-up-in-brooklyn-57141/
  • Ramaji, I. J., & Memari, A. M. (2013, February 20–21). Identification of structural issues in design and construction of multi-story modular buildings. In 1st residential building design & construction conference (pp. 294–303). Bethlehem,PA: Pennsylvania Housing Research Center (PHRC).
  • Ramaji, I. J., & Memari, A. M. (2016). Product architecture model for multistory modular buildings. Journal of Construction Engineering and Management, 142(10), 04016047. doi: 10.1061/(ASCE)CO.1943-7862.0001159
  • Ramaji, I. J., Memari, A. M., & Messner, J. I. (2017). Product-oriented information delivery framework for multi-story modular building projects. Journal of Computing in Civil Engineering, 31(4), 1–17. doi: 10.1061/(ASCE)CP.1943-5487.0000649
  • Sause, R., & Powell, G. H. (1990). A design process model for computer integrated structural engineering. Engineering with Computers, 6(3), 129–143. doi: 10.1007/BF01200311
  • Smith, R. E. (2015). Permanent modular construction: Process, practice, performance. Modular Building Institue http://www.modular.org/
  • Solnosky, R. L., Memari, A. M., & Ramaji, I. J. (2014, February 19–20). Structural BIM processes for modular multi-story buildings in design and construction. In 2nd residential building design & construction conference (pp. 201–215). University Park,PA: Pennsylvania Housing Research Center (PHRC).
  • Threlfall, R. (2016). Smart construction: The value in offsite construction.
  • Vries, H. J. de. (2006). It standards typology. In Chapter 1 of the advanced topics in information technology standards and standardization research (Vol. 1, pp. 1–26). Hershey: Idea Group.
  • Wix, J., & Karlshoej, J. (2010). Information delivery manual: Guide to components and development methods. Retrieved February 2, 2015, from http://iug.buildingsmart.org/idms/development/
  • Zanni, M. A., Soetanto, R., & Ruikar, K. (2017). Towards a BIM-enabled sustainable building design process: Roles, responsibilities, and requirements. Architectural Engineering and Design Management, 13(2), 101–129. doi: 10.1080/17452007.2016.1213153

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.