282
Views
3
CrossRef citations to date
0
Altmetric
Articles

A structured methodology to optimise throughput of production lines

, , , &
Pages 25-36 | Received 08 Apr 2014, Accepted 30 Aug 2014, Published online: 22 Sep 2014

References

  • R. Moen and C. Norman. Evolution of the PDCA Cycle. The Asian Network for Quality Congress (ANQ 2009). September 15–19, Tokyo, Japan, 2009.
  • E.M. Goldratt, J. Cox, and D. Whitford, The Goal: A Process of Ongoing Improvement, Vol. 2, North River Press, New York, 1992.
  • A.C. Marquez, J. Gupta, and A.S. Heguedas, Maintenance policies for a production system with constrained production rate and buffer capacity, Int. J. Prod. Res. 41 (2003), pp. 1909–1926.10.1080/0020754031000123877
  • International Organization for Standarization, Asset Management – Management Systems. ISO 55001:2012, International Organization for Standarization, Prague, 2012.
  • M. Rausand and A. Hyland, System Reliability Theory: Models, Statistical Methods, and Applications, Vol. 396, Wiley-Interscience, New Jersey, 2003.
  • A. Jardine and A. Tsang, Maintenance, Replacement, and Reliability: Theory and Applications. CRC Press, LLC, Boca Raton, FL, 2013.
  • K.B. Misra, Maintenance engineering and maintainability: An introduction, in Handbook of Performability Engineering, Springer, New Delhi, 2008, pp. 755–772.10.1007/978-1-84800-131-2
  • W.Y. Yun, G. Park, and Y.J. Han, An optimal reliability and maintainability design of a searching system. Communications in Statistics-Simulation and Computation (just accepted).
  • M. Moura and E.L. Droguett, Numerical approach for assessing system dynamic availability via continuous time homogeneous semi-Markov processes. Methodol. Comput. Appl. Probab., 12:431–449, 2010.10.1007/s11009-008-9114-2
  • Balbir S. Dhillon, Mining Equipment Reliability, Maintainability, and Safety, Springer, Ottawa, 2008.
  • G. Sharma, T. Haukaas, R.A. Hall, and S. Priyadarshini, Bayesian statistics and production reliability assessments for mining operations, Int. J. Min. Reclam. Environ. 23 (2009), pp. 180–205.10.1080/17480930902916262
  • S. Gupta and J. Bhattacharya, Discrete Markov chains – An analytical tool for productivity analysis of surface mining systems, Int. J. Surf. Min. Reclam. Environ. 13 (1999), pp. 111–116.10.1080/09208119908944226
  • G. Yuriy and N. Vayenas, Discrete-event simulation of mine equipment systems combined with a reliability assessment model based on genetic algorithms, Int. J. Min. Reclam. Environ. 22 (2008), pp. 70–83.10.1080/17480930701589674
  • G. Levitin, S.H. Ng, R. Peng, and M. Xie, Reliability of systems subjected to imperfect fault coverage, in Stochastic Reliability and Maintenance Modeling, T. Dohi, T. Nakagawa, eds., Springer, London, 2013, pp. 159–177.
  • I.D. Lins and E.L. Droguett, Redundancy allocation problems considering systems with imperfect repairs using multi-objective genetic algorithms and discrete event simulation, Simul. Model. Pract. Theory 19 (2011), pp. 362–381.10.1016/j.simpat.2010.07.010
  • R. Ganguli and S. Bandopadhyay, Expert system for equipment selection, Int. J. Surf. Min. Reclam. Environ. 16 (2002), pp. 163–170.10.1076/ijsm.16.3.163.7420
  • A. Bozorgebrahimi, R.A. Hall, and M.A. Morin, Equipment size effects on open pit mining performance, Int. J. Surf. Min. Reclam. Environ. 19 (2005), pp. 41–56.10.1080/13895260412331326821
  • L. Demir, S. Tunal, D.T. Eliiyi, and A. Lkketangen, Two approaches for solving the buffer allocation problem in unreliable production lines. Comput. Oper. Res. 40(10) (2013), pp. 2556–2563.
  • Y. Ouazene, H. Chehade, A. Yalaoui, and F. Yalaoui, Equivalent machine method for approximate evaluation of buffered unreliable production lines, in 2013 IEEE Workshop on Computational Intelligence In Production And Logistics Systems (CIPLS), IEEE, Singapore, 2013, pp. 33–39.
  • Y. Dallery, R. David, and X.L. Xie, Approximate analysis of transfer lines with unreliable machines and finite buffers, IEEE Trans. Autom. Control 34(9) (1989), pp. 943–953.10.1109/9.35807
  • M.H. Burman, New results in flow line analysis, Ph.D. thesis, Massachusetts Institute of Technology, 1995.
  • W.J. Kennedy, J. Wayne Patterson and L. Fredendall, An overview of recent literature on spare parts inventories, Int. J. Prod. Econ. 76 (2002), pp. 201–215.10.1016/S0925-5273(01)00174-8
  • D. Godoy, R. Pascual, and P. Knights, Critical spare parts ordering decisions using conditional reliability and stochastic lead time, Reliab. Eng. Syst. Safe. 119 (2013), pp. 199–206.10.1016/j.ress.2013.05.026
  • R. Kumar and U. Kumar, Service delivery strategy: Trends in mining industries, Int. J. Surf. Min. Reclam. Environ. 18 (2004), pp. 299–307.10.1080/1389526042000274926
  • N. Shah, Process industry supply chains: Advances and challenges, Comput. Chem. Eng. 29 (2005), pp. 1225–1236.
  • R. Shah and P.T. Ward, Lean manufacturing: Context, practice bundles, and performance, J. Oper. Manage. 21 (2003), pp. 129–149.10.1016/S0272-6963(02)00108-0
  • K. Mishina and K. Takeda, Toyota Motor Manufacturing, Harvard Business School, Boston, 1992.
  • C. Eroglu and C. Hofer, Lean, leaner, too lean? The inventory-performance link revisited, J. Oper. Manage. 29 (2011), pp. 356–369.10.1016/j.jom.2010.05.002
  • R. Pascual, D. Godoy, and D.M. Louit, Throughput centered prioritization of machines in transfer lines, Reliab. Eng. Syst. Safe. 96 (2011), pp. 1396–1401.
  • A. Gustafson, H. Schunnesson, D. Galar, and U. Kumar, The influence of the operating environment on manual and automated load-haul-dump machines: A fault tree analysis, Int. J. Min. Reclam. Environ. 27 (2013), pp. 75–87.10.1080/1755182X.2011.651371
  • A.R. Wijaya, J. Lundberg, and U. Kumar, Downtime analysis of a scaling machine, Int. J. Min. Reclam. Environ. 26 (2012), pp. 244–260.10.1080/17480930.2011.603515
  • S. Gupta, J. Maiti, R. Kumar, and U. Kumar, A control chart guided maintenance policy selection, Int. J. Min. Reclam. Environ. 23 (2009), pp. 216–226.10.1080/17480930902916478
  • P.F. Knights, Rethinking Pareto analysis: Maintenance applications of logarithmic scatterplots, J. Qual. Main. Eng. 7 (2001), pp. 252–263.10.1108/13552510110407041
  • M.J. King, K.C. Sole, and W. Davenport, Extractive Metallurgy of Copper, Elsevier, Oxford, UK, 2011.
  • John Moubray, RCM II: Reliability-Centered Maintenance. Industrial Press, Oxford, UK, 2001.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.