Optimising the mine production scheduling accounting for stockpiling and investment decisions under geological uncertainty

, & ORCID Icon
Pages 355-374 | Received 08 Jul 2022, Accepted 31 Mar 2023, Published online: 13 Apr 2023

References

  • R. Dimitrakopoulos, A. Lamghari, Simultaneous stochastic optimization of mining complexes/mineral value chains: An overview of concepts, examples and comparisons, Int. J. Min. Reclam. Environ. 36, 6 (2022), pp. 443–460. doi:10.1080/17480930.2022.2065730
  • P. Bodon, C. Fricke, T. Sandeman, and C. Stanford, Modeling the mining supply chain from mine to port: A combined optimization and simulation approach, J. Min. Sci. 47 (2) (2011), pp. 202–211. doi:10.1134/S1062739147020079.
  • S. Hoerger, F. Seymour, and L. Hoffman, Mine planning at Newmont’s Nevada operations, Min. Eng. 51 (1999), pp. 26–30.
  • B. Pimentel, G. Mateus, and F. Almeida, Mathematical models for optimizing the global mining supply chain, in Intelligent Systems in Operations: Methods, Models and Applications in the Supply Chain, : Business Science Reference, Maryland, USA, 2010, pp. 133–163 doi:10.4018/978-1-61520-605-6.ch008.
  • P. Stone, G. Froyland, M. Menadbe, B. Law, R. Paysar, and P. Monkhouse, Blasor-Blended iron ore mine planning optimisation at Yandi, Western Australia, in Orebody Modelling and Strategic Mine Planning, R. Dimitrakopoulos, ed., The Australasian Institute of Mining and Metallurgy, Carlton, Vic, 2005, pp. 133–136. Spectrum Series 14.
  • J. Whittle, The Global Optimiser Works - What Next?, in Advances in Applied Strategic Mine Planning, R. Dimitrakopoulos, ed., Springer International Publishing, Cham, 2018, pp. 31–37. doi:10.1007/978-3-319-69320-0_3
  • K. Lane, The economic definition of ore: Cut-off grades in theory and practice. Mining Journal Books, the University of California, CA, USA, 1988.
  • T.B. Johnson (1969) Improving returns from mine products through use of operation research techniques. US Bureau of Mines, Report of investigations 7230, Washington, DC
  • Y.C. Kim (1967) Mathematical programming analysis of mine planning problems. Ph.D. Thesis, The Pennsylvania State University, University Park, PA
  • D. Bienstock and M. Zuckerberg (2010) Solving LP relaxations of large-scale precedence constrained problems. Proceedings from the 14th conference on Integer Programming and Combinatorial Optimization (IPCO). Lecture Notes in Computer Science 6080, 1–14. DOI: 10.1007/978-3-642-13036-6_1
  • D.S. Johnson and K.A. Niemi, On knapsacks, partitions, and a new dynamic programming technique for trees, Math. Oper. Res. 8 (1) (1983), pp. 1–14. doi:10.1287/moor.8.1.1.
  • C. Cullenbine, R.K. Wood, and A. Newman, A sliding time window heuristic for open pit mine block sequencing, Optim. Lett. 5 (3) (2011), pp. 365–377. doi:10.1007/s11590-011-0306-2.
  • A. Bley, N. Boland, C. Fricke, and G. Froyland, A strengthened formulation and cutting planes for the open pit mine production scheduling problem, Comput. Oper. Res. 37 (9) (2010), pp. 1641–1647. doi:10.1016/j.cor.2009.12.008.
  • N. Boland, I. Dumitrescu, G. Froyland, and A. Gleixner, LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity, Comput. Oper. Res. 36 (4) (2009), pp. 1064–1089. doi:10.1016/j.cor.2007.12.006.
  • J.A. Ferland, J. Amaya, and M.S. Djuimo, Application of a particle swarm algorithm to the capacitated open pit mining problem, in Autonomous Robots and Agents, S. Mukhopadhyay and G. Sen Gupta, eds., Vol. 76, Springer-Verlag, Berlin, Germany. 2007, pp. 127–133. doi:10.1007/978-3-540-73424-6_15.
  • R. Chicoisne, D. Espinoza, M. Goycoolea, E. Moreno, and E. Rubio, A new algorithm for the open-pit mine production scheduling problem, Oper. Res. 60 (3) (2012), pp. 517–528. doi:10.1287/opre.1120.1050.
  • A. Lamghari, R. Dimitrakopoulos, and J. Ferland, A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines, J. Global Optim. 63 (3) (2015), pp. 555–582. doi:10.1007/s10898-014-0185-z.
  • E. Moreno, M. Rezakhah, A. Newman, and F. Ferreira, Linear models for stockpiling in open-pit mine production scheduling problems, Eur. J. Oper. Res. 260 (1) (2017), pp. 212–221. doi:10.1016/j.ejor.2016.12.014.
  • C.K. Baker and S.M. Giacomo, Resource and reserves: Their uses and abuses by the equity markets, Ore reserves and finance: a joint seminar between Australasian Institute of Mining and Metallurgy and ASX, 15 June 1998, Sydney. The Australasian Institute of Mining and Metallurgy, Carlton, Victoria, ‎Australia. 1998, pp. 667–676.
  • J.R. Birge and F. Louveaux, Introduction to Stochastic Programming, Springer, NY, 1997.
  • J. Benndorf and R. Dimitrakopoulos, Stochastic long-term production scheduling of iron ore deposits: Integrating joint multi-element geological uncertainty, J. Min. Sci. 49 (1) (2013), pp. 68–81. doi:10.1134/S1062739149010097.
  • S. Ramazan and R. Dimitrakopoulos, Stochastic optimisation of long-term production scheduling for open pit mines with a new integer programming formulation, in Advances in Applied Strategic Mine Planning R. Dimitrakopoulos ed., Springer, Cham, Cham, Switzerland, 2005, pp. 139–153. doi:10.1007/978-3-319-69320-0_11.
  • P. Dowd, Risk assessment in reserve estimation and open-pit planning, Trans. Inst Min. Metall. (Section A: Min. Ind.) 103 (1994), pp. A148–154.
  • P. Dowd, Risk in minerals projects: Analysis, perception and management, Min. Tech 106 (1997), pp. A9–18.
  • R. Dimitrakopoulos, C.T. Farrelly, and M.C. Godoy, Moving forward from traditional optimization: Grade uncertainty and risk effects in open pit design, Min. Tech 111 (1) (2002), pp. A82–89. doi:10.1179/mnt.2002.111.1.82.
  • R. Dimitrakopoulos and S. Ramazan, Stochastic integer programming for optimizing long-term production schedules of open pit mines: Methods, application and value of stochastic solutions, Min. Tech 117 (4) (2008), pp. 155–160. doi:10.1179/174328609X417279.
  • K. Behrang, A.N. Hooman, V.D. Clayton, A linear programming model for long-term mine planning in the presence of grade uncertainty and a stockpile, Int. J. Min. Sci. Technol. 24, 4 (2014), pp. 451–459. doi:10.1016/j.ijmst.2014.05.006
  • R. Goodfellow and R. Dimitrakopoulos, Global optimization of open pit mining complexes with uncertainty, Appl. Soft. Comput. 40 (2016), pp. 292–304. doi:10.1016/j.asoc.2015.11.038.
  • R. Goodfellow and R. Dimitrakopoulos, Simultaneous stochastic optimization of mining complexes and mineral value chains, Math. Geosci. 49 (3) (2017), pp. 341–360. doi:10.1007/s11004-017-9680-3.
  • A. Kumar and R. Dimitrakopoulos, Application of simultaneous stochastic optimization with geometallurgical decisions at a copper–gold mining complex, Min. Tech 128 (2) (2019), pp. 88–105. doi:10.1080/25726668.2019.1575053.
  • L. Montiel and R. Dimitrakopoulos, Optimizing mining complexes with multiple processing and transportation alternatives: An uncertainty-based approach, Eur. J. Oper. Res. 247 (1) (2015), pp. 166–178. doi:10.1016/j.ejor.2015.05.002.
  • L. Montiel and R. Dimitrakopoulos, A heuristic approach for the stochastic optimization of mine production schedules, J. Heuristics 23 (5) (2017), pp. 397–415. doi:10.1007/s10732-017-9349-6.
  • A. Paithankar, S. Chatterjee, R. Goodfellow, and M.W.A. Asad, Simultaneous stochastic optimization of production sequence and dynamic cut-off grades in an open pit mining operation, Resour. Policy 66 (2020), pp. 101634. doi:10.1016/j.resourpol.2020.101634.
  • J. Zhang and R. Dimitrakopoulos, Optimising a mineral supply chain under uncertainty with long-term sales contracts, in Advances in Applied Strategic Mine Planning, R. Dimitrakopoulos, ed., Springer, Cham, 2018, pp. 787–800. doi:10.1007/978-3-319-69320-0_45
  • A. Rimélé, M. Gamache, and R. Dimitrakopoulos, A stochastic optimization method with in-pit waste and tailings disposal for open pit life-of-mine production planning, Resour. Policy 57 (2018), pp. 112–121. doi:10.1016/j.resourpol.2018.02.006.
  • M. Zuckerberg, P. Stone, R. Pasyar, and E. Mader, Joint Ore Extraction and In-Pit Dumping Optimization, in Orebody Modelling and Strategic Mine Planning: Uncertainty and Risk Management Models,R. Dimitrakopoulos, ed., 2nd ed., Australasian Institute of Mining and Metallurgy, Carlton, Victoria, Australia, (2007), pp. 137–140.
  • E. Ben-Awuah and H. Askari-Nasab, Oil sands mine planning and waste management using mixed integer goal programming, Int. J. Min. Reclam. Environ. 25 (3) (2011), pp. 226–247. doi:10.1080/17480930.2010.549656.
  • Y. Li, E. Topal, and S. Ramazan, Optimising the long-term mine waste management and truck schedule in a large-scale open pit mine, Min. Tech 125 (1) (2016), pp. 35–46. doi:10.1080/14749009.2015.1107343.
  • A. Lamghari and R. Dimitrakopoulos, Hyper-heuristic approaches for strategic mine planning under uncertainty, Comput. Oper. Res. 115, (2019), pp. 104590. Available online 17 November 2018. 10.1016/j.cor.2018.11.010
  • S. Ahmed, A. King, and G. Parija, A multi-stage stochastic integer programming approach for capacity expansion under uncertainty, J. Global Optim. 26 (1) (2003), pp. 3–24. doi:10.1023/A:1023062915106.
  • N. Boland, I. Dimitrescu, and G. Froyland (2008) A multistage stochastic programming approach to open pit mine production scheduling with uncertain geology. Optimization Online, http://www.optimization-online.org/DB_FILE/2008/10/2123.pdf. Visited 19 July 2019
  • M. Godoy and R. Dimitrakopoulos, Managing risk and waste mining in long-term production scheduling, SME Trans. 316 (2004), pp. 43–50.
  • I. Farmer (2016) Stochastic mining supply chain optimization: A study of integrated capacity decisions and pushback design under uncertainty. M.Sc. thesis, McGill University, Montreal, Qc, Canada
  • A.D. Ajak, E. Lilford, and E. Topal, Application of predictive data mining to create mine plan flexibility in the face of geological uncertainty, Resour. Policy 55 (2018), pp. 62–79. doi:10.1016/J.RESOURPOL.2017.10.016.
  • M.F. Del Castillo and R. Dimitrakopoulos, Dynamically optimizing the strategic plan of mining complexes under supply uncertainty, Resour. Policy 60 (2019), pp. 83–93. doi:10.1016/j.resourpol.2018.11.019.
  • Z. Brika (2019) Optimisation de la planification stratégique d’une mine à ciel ouvert en tenant compte de l’incertitude géologique. PhD thesis, Ecole Polytechnique, Montreal, QC, Canada
  • M. Rezakhah and A. Newman, Open Pit Mine Planning with Degradation due to Stockpiling, Comput. Oper. Res. 115 (2018), pp. 115. doi:10.1016/j.cor.2018.11.009.
  • S. Ramazan and R. Dimitrakopoulos, Production scheduling with uncertain supply: A new solution to the open pit mining problem, Optim. Eng. 14 (2) (2013), pp. 361–380. doi:10.1007/s11081-012-9186-2.
  • D. Hochbaum, The pseudoflow algorithm: A new algorithm for the maximum flow problem, Oper. Res. 58 (4) (2008), pp. 992–1009. doi:10.1287/opre.1080.0524.
  • G. Munoz, D. Espinoza, M. Goycoolea, E. Moreno, M. Queyranne, O. Rivera, A study of the Bienstock-Zuckerberg algorithm, Comput. Optim. Appl. 69, 2 (2018), pp. 501–534. doi:10.1007/s10589-017-9946-1
  • A. Boucher and R. Dimitrakopoulos, Block simulation of multiple correlated variables, Math. Geosci. 41 (2) (2009), pp. 215–237. doi:10.1007/s11004-008-9178-0.
  • M. Godoy (2003) The effective management of geological risk. Ph.D. thesis, University of Queensland, Brisbane, Qld, Australia

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.