References
- Abdal-HadiM. (2010). Factors affecting pre-tender cost estimates in the Gaza Strip (Master's thesis). The Islamic University, Gaza, Palestine.
- Abdul RahmanI., MemonA., & Abd. KarimA. (2013). Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, 13, 286–293.
- AhujaH., DozziS., & Abou RizkS. (1994). Project management techniques in planning and controlling construction projects (2nd ed.). New York: Wiley.
- Al-JuwairahY. (1997). Factors affecting construction costs in Saudi Arabia (Master's thesis). King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
- Al-ZarooniS., & AbdouA. (2000). Risk management in pre-design stage and its potential benefits for UAE public projects. 28th world congress on housing challenges for the 21st century15–19 April, (pp. 109–118). Abu Dhabi, UAE.
- AzharN., FarooquiR., & AhmedS. (2008). Cost overrun factors in construction industry of Pakistan. Proceedings of the first international conference on construction in developing countries. Karachi, Pakistan.
- ElinwaA., & BubaS. (1993). Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119, 698–713.
- EmoryC. (1980). Business research methods (revised ed.). Homewood, IL: Richard D. Irwin.
- EnshassiA., MohamedS., & MadiI. (2005). Factors affecting accuracy of cost estimation of building contracts in Gaza Strip. Journal of Financial Management of Property and Construction, 10, 115–125.
- HolmL., SchaufelbergerJ., GriffinD., & ColeT. (2005). Construction cost estimating – process and practice (pp. 3–12). Upper Saddle River, NJ: Pearson Prentice Hall.
- IyerK., & JhaK. (2005). Factors affecting cost performance: Evidence from Indian construction projects. International Journal of Project Management, 23, 283–295.
- KoleolaO., & HenryO. (2008). Factors affecting the accuracy of a pre-tender cost estimate in Nigeria. Journal of Cost Engineering, 50, 32–35.
- MahamidI. (2014). Contractors' perception of risk factors affecting cost overrun in building projects in Palestine. The IES Journal Part A: Civil & Structural Engineering, 7(1). 10.1080/19373260.2013.854180.
- MahamidI., & BrulandA. (2012). Cost deviation in road construction projects: The case of Palestine. Australasian Journal of Construction Economics and Building, 12, 58–71.
- OgwuelekaA. (2011). The critical success factors influencing project performance in Nigeria. International Journal of Management Science and Engineering Management, 6, 343–349.
- PCBS (The Palestinian Central Bureau of Statistics). (2012). Tables retrieved from http://www.pcbs.gov.ps/Portals/_Rainbow/Documents/Employed%20Person%20by%20sector.htm.