Factors affecting cost estimate accuracy: Evidence from Palestinian construction projects

Pages 117-125 | Received 29 May 2013, Accepted 06 Jan 2014, Published online: 18 Jun 2014

References

  • Abdal-HadiM. (2010). Factors affecting pre-tender cost estimates in the Gaza Strip (Master's thesis). The Islamic University, Gaza, Palestine.
  • Abdul RahmanI., MemonA., & Abd. KarimA. (2013). Significant factors causing cost overruns in large construction projects in Malaysia. Journal of Applied Sciences, 13, 286–293.
  • AhujaH., DozziS., & Abou RizkS. (1994). Project management techniques in planning and controlling construction projects (2nd ed.). New York: Wiley.
  • Al-JuwairahY. (1997). Factors affecting construction costs in Saudi Arabia (Master's thesis). King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
  • Al-ZarooniS., & AbdouA. (2000). Risk management in pre-design stage and its potential benefits for UAE public projects. 28th world congress on housing challenges for the 21st century15–19 April, (pp. 109–118). Abu Dhabi, UAE.
  • AzharN., FarooquiR., & AhmedS. (2008). Cost overrun factors in construction industry of Pakistan. Proceedings of the first international conference on construction in developing countries. Karachi, Pakistan.
  • ElinwaA., & BubaS. (1993). Construction cost factors in Nigeria. Journal of Construction Engineering and Management, 119, 698–713.
  • EmoryC. (1980). Business research methods (revised ed.). Homewood, IL: Richard D. Irwin.
  • EnshassiA., MohamedS., & MadiI. (2005). Factors affecting accuracy of cost estimation of building contracts in Gaza Strip. Journal of Financial Management of Property and Construction, 10, 115–125.
  • HolmL., SchaufelbergerJ., GriffinD., & ColeT. (2005). Construction cost estimating – process and practice (pp. 3–12). Upper Saddle River, NJ: Pearson Prentice Hall.
  • IyerK., & JhaK. (2005). Factors affecting cost performance: Evidence from Indian construction projects. International Journal of Project Management, 23, 283–295.
  • KoleolaO., & HenryO. (2008). Factors affecting the accuracy of a pre-tender cost estimate in Nigeria. Journal of Cost Engineering, 50, 32–35.
  • MahamidI. (2014). Contractors' perception of risk factors affecting cost overrun in building projects in Palestine. The IES Journal Part A: Civil & Structural Engineering, 7(1). 10.1080/19373260.2013.854180.
  • MahamidI., & BrulandA. (2012). Cost deviation in road construction projects: The case of Palestine. Australasian Journal of Construction Economics and Building, 12, 58–71.
  • OgwuelekaA. (2011). The critical success factors influencing project performance in Nigeria. International Journal of Management Science and Engineering Management, 6, 343–349.
  • PCBS (The Palestinian Central Bureau of Statistics). (2012). Tables retrieved from http://www.pcbs.gov.ps/Portals/_Rainbow/Documents/Employed%20Person%20by%20sector.htm.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.