References
- Almeder, C., & Hartl, R. F. (2013). A metaheuristic optimization approach for a real-world stochastic flexible flow shop problem with limited buffer. International Journal of Production Economics, 145(1), 88–95. Retrieved from http://www.sciencedirect.com/science/article/pii/S0925527312004100
- Attar, S. F., Mohammadi, M., & Tavakkoli-Moghaddam, R. (2013). Hybrid flexible flowshop scheduling problem with unrelated parallel machines and limited waiting times. [journal article]. The International Journal of Advanced Manufacturing Technology, 68(5), 1583–1599.
- Bairamzadeh, S., Pishvaee, M. S., & Saidi-Mehrabad, M. (2016). Multiobjective robust possibilistic programming approach to sustainable bioethanol supply chain design under multiple uncertainties. Industrial & Engineering Chemistry Research, 55(1), 237–256.
- Behnamian, J., & Fatemi Ghomi, S. M. T. (2011). Hybrid flowshop scheduling with machine and resource-dependent processing times. Applied Mathematical Modelling, 35(3), 1107–1123. Retrieved from http://www.sciencedirect.com/science/article/pii/S0307904X10003069
- Ben-Tal, A., & Nemirovski, A. (2000). Robust solutions of linear programming problems contaminated with uncertain data. [journal article]. Mathematical Programming, 88(3), 411–424.
- Bertsimas, D., & Sim, M. (2003). Robust discrete optimization and network flows. [journal article]. Mathematical Programming, 98(1), 49–71.
- Bertsimas, D., & Sim, M. (2004). The price of robustness. Operations Research, 52(1), 35–53.
- Cao, D., Chen, M., & Wan, G. (2005). Parallel machine selection and job scheduling to minimize machine cost and job tardiness. Computers & Operations Research, 32(8), 1995–2012. Retrieved from http://www.sciencedirect.com/science/article/pii/S0305054804000036
- Chaari, T., Chaabane, S., Loukil, T., & Trentesaux, D. (2011). A genetic algorithm for robust hybrid flow shop scheduling. International Journal of Computer Integrated Manufacturing, 24(9), 821–833.
- Dekhici, L., & Belkadi, K. (2010). Operating theatre scheduling under constraints. Journal of Applied Sciences, 10(14), 1380–1388. Retrieved from http://scialert.net/abstract/?doi=jas.2010.1380.1388
- Emmons, H., & Vairaktarakis, G. (2013). Flow shop scheduling. Retrieved from http://www.springer.com/gp/book/9781461451518
- Eren, T. (2010). A bicriteria m-machine flowshop scheduling with sequence-dependent setup times. Applied Mathematical Modelling, 34(2), 284–293. Retrieved from http://www.sciencedirect.com/science/article/pii/S0307904X09001176
- Feng, X., Zheng, F., & Xu, Y. (2016). Robust scheduling of a two-stage hybrid flow shop with uncertain interval processing times. International Journal of Production Research, 54(12), 3706–3717.
- Gholami-Zanjani, S. M., Hakimifar, M., Nazemi, N., & Jolai, F. (2017). Robust and fuzzy optimisation models for a flow shop scheduling problem with sequence dependent setup times: A real case study on a PCB assembly company. International Journal of Computer Integrated Manufacturing, 30(6), 552–563.
- Gupta, J. N. D. (1988). Two-stage, hybrid flowshop scheduling problem. The Journal of the Operational Research Society, 39(4), 359–364. Retrieved from http://www.jstor.org/stable/2582115
- Hall, N. G., & Sriskandarajah, C. (1996). A survey of machine scheduling problems with blocking and no-wait in process. Operations Research, 44(3), 510–525.
- Hamidieh, A., Naderi, B., Mohammadi, M., & Fazli-Khalaf, M. (2017). A robust possibilistic programming model for a responsive closed loop supply chain network design. Cogent Mathematics, 4(1).
- Huang, C.-S., Huang, Y.-C., & Lai, P.-J. (2012). Modified genetic algorithms for solving fuzzy flow shop scheduling problems and their implementation with CUDA. Expert Systems with Applications, 39(5), 4999–5005. Retrieved from http://www.sciencedirect.com/science/article/pii/S0957417411014989
- Ishibuchi, H., Yamamoto, N., Misaki, S., & Tanaka, H. (1994). Local search algorithms for flow shop scheduling with fuzzy due-dates. International Journal of Production Economics, 33(1), 53–66. Retrieved from http://www.sciencedirect.com/science/article/pii/092552739490118X
- Ishibuchi, H., Yamamoto, N., Murata, T., & Tanaka, H. (1994). Genetic algorithms and neighborhood search algorithms for fuzzy flowshop scheduling problems. Fuzzy Sets and Systems, 67(1), 81–100. Retrieved from http://www.sciencedirect.com/science/article/pii/0165011494902100
- Jiang, S., Liu, M., Hao, J., & Qian, W. (2015). A bi-layer optimization approach for a hybrid flow shop scheduling problem involving controllable processing times in the steelmaking industry. Computers & Industrial Engineering, 87, 518–531. Retrieved from http://www.sciencedirect.com/science/article/pii/S0360835215002612
- Jiménez, M., Arenas, M., Bilbao, A., & Rodrı´guez, M. V. (2007). Linear programming with fuzzy parameters: An interactive method resolution. European Journal of Operational Research, 177(3), 1599–1609. Retrieved from http://www.sciencedirect.com/science/article/pii/S0377221705006454
- Kahraman, C., Engin, O., & Yilmaz, M. K. (2009). A new artificial immune system algorithm for multiobjective fuzzy flow shop. International Journal of Computational Intelligence Systems, 2(3), 236–247.
- Khademi Zare, H., & Fakhrzad, M. B. (2011). Solving flexible flow-shop problem with a hybrid genetic algorithm and data mining: A fuzzy approach. Expert Systems with Applications, 38(6), 7609–7615. Retrieved from http://www.sciencedirect.com/science/article/pii/S0957417410014648
- Kouvelis, P., Daniels, R. L., & Vairaktarakis, G. (2000). Robust scheduling of a two-machine flow shop with uncertain processing times. IIE Transactions, 32(5), 421–432.
- Lai, P.-J., & Wu, H.-C. (2011). Evaluate the fuzzy completion times in the fuzzy flow shop scheduling problems using the virus-evolutionary genetic algorithms. Applied Soft Computing, 11(8), 4540–4550. Retrieved from http://www.sciencedirect.com/science/article/pii/S156849461100295X
- Li, J.-Q., & Pan, Q.-K. (2015). Solving the large-scale hybrid flow shop scheduling problem with limited buffers by a hybrid artificial bee colony algorithm. Information Sciences, 316, 487–502. Retrieved from http://www.sciencedirect.com/science/article/pii/S0020025514009888
- McCahon, C. S., & Lee, E. S. (1992). Fuzzy job sequencing for a flow shop. European Journal of Operational Research, 62(3), 294–301. Retrieved from http://www.sciencedirect.com/science/article/pii/037722179290119T
- Mokhtari, H., Abadi, I. N. K., & Cheraghalikhani, A. (2011). A multi-objective flow shop scheduling with resource-dependent processing times: Trade-off between makespan and cost of resources. International Journal of Production Research, 49(19), 5851–5875.
- Mousazadeh, M., Torabi, S. A., Pishvaee, M. S., & Abolhassani, F. (2017). Health service network design: A robust possibilistic approach. International Transactions in Operational Research, 25(1), 337–373.
- Mousazadeh, M., Torabi, S. A., & Zahiri, B. (2015). A robust possibilistic programming approach for pharmaceutical supply chain network design. Computers & Chemical Engineering, 82, 115–128. Retrieved from http://www.sciencedirect.com/science/article/pii/S0098135415002203
- Naderi, B., Gohari, S., & Yazdani, M. (2014). Hybrid flexible flowshop problems: Models and solution methods. Applied Mathematical Modelling, 38(24), 5767–5780. Retrieved from http://www.sciencedirect.com/science/article/pii/S0307904X14001826
- Pishvaee, M. S., & Fazli Khalaf, M. (2016). Novel robust fuzzy mathematical programming methods. Applied Mathematical Modelling, 40(1), 407–418. Retrieved from http://www.sciencedirect.com/science/article/pii/S0307904X15003686
- Pishvaee, M. S., Razmi, J., & Torabi, S. A. (2012). Robust possibilistic programming for socially responsible supply chain network design: A new approach. Fuzzy Sets and Systems, 206, 1–20. Retrieved from http://www.sciencedirect.com/science/article/pii/S0165011412001819
- Pishvaee, M. S., Torabi, S. A., & Razmi, J. (2012). Credibility-based fuzzy mathematical programming model for green logistics design under uncertainty. Computers & Industrial Engineering, 62(2), 624–632. Retrieved from http://www.sciencedirect.com/science/article/pii/S0360835211003512
- Rabbani, M., Zhalechian, M., & Farshbaf-Geranmayeh, A. (2016). A robust possibilistic programming approach to multiperiod hospital evacuation planning problem under uncertainty. International Transactions in Operational Research, 25(1), 157–189.
- Rahmani, D., & Heydari, M. (2014). Robust and stable flow shop scheduling with unexpected arrivals of new jobs and uncertain processing times. Journal of Manufacturing Systems, 33(1), 84–92. Retrieved from http://www.sciencedirect.com/science/article/pii/S0278612513000332
- Rahmani, D., Ramezanian, R., & Saidi-Mehrabad, M. (2014). Multi-objective flow shop scheduling problem with stochastic parameters: Fuzzy goal programming approach. International Journal of Operational Research, 21(3), 322–340.
- Rezaie, N., Tavakkoli-Moghaddam, R., & Torabi, S. A. (2009). A new mathematical model for fuzzy flexible flow shop scheduling of unrelated parallel machines maximizing the weighted satisfaction level. IFAC Proceedings Volumes, 42(4), 798–803. Retrieved from http://www.sciencedirect.com/science/article/pii/S1474667016338915
- Rippin, D. W. T. (1983). Design and operation of multiproduct and multipurpose batch chemical plants. — An analysis of problem structure. Computers & Chemical Engineering, 7(4), 463–481. Retrieved from http://www.sciencedirect.com/science/article/pii/0098135483800234
- Ruiz, R., Şerifoğlu, F. S., & Urlings, T. (2008). Modeling realistic hybrid flexible flowshop scheduling problems. Computers & Operations Research, 35(4), 1151–1175. Retrieved from http://www.sciencedirect.com/science/article/pii/S0305054806001560
- Shahnaghi, K., Shahmoradi-Moghadam, H., Noroozi, A., & Mokhtari, H. (2016). A robust modelling and optimisation framework for a batch processing flow shop production system in the presence of uncertainties. International Journal of Computer Integrated Manufacturing, 29(1), 92–106.
- Su, L.-H., & Lien, C.-Y. (2009). Scheduling parallel machines with resource-dependent processing times. International Journal of Production Economics, 117(2), 256–266. Retrieved from http://www.sciencedirect.com/science/article/pii/S0925527308003617
- Tao, Z., Liu, X., & Zeng, P. (2014). Study on hybrid flow shop scheduling problem with blocking based on GASA. The Open Automation and Control Systems Journal, 6, 593–600.
- White, C. H., & Wilson, R. C. (1977). Sequence dependent set-up times and job sequencing. International Journal of Production Research, 15(2), 191–202.
- Zahiri, B., Tavakkoli-Moghaddam, R., & Pishvaee, M. S. (2014). A robust possibilistic programming approach to multi-period location–Allocation of organ transplant centers under uncertainty. Computers & Industrial Engineering, 74, 139–148. Retrieved from http://www.sciencedirect.com/science/article/pii/S0360835214001533
- Zandieh, M., & Rashidi, E. (2009). An effective hybrid genetic algorithm for hybrid flow shops with sequence dependent setup times and processor blocking. Journal of Optimization in Industrial Engineering, 2(4), 51–58. Retrieved from http://www.qjie.ir/article_32_390bbd205fe27d81e187d7ac38c902ae.pdf
- Zhou, Y., Li, Y. P., & Huang, G. H. (2015). A robust possibilistic mixed-integer programming method for planning municipal electric power systems. International Journal of Electrical Power & Energy Systems, 73, 757–772. Retrieved from http://www.sciencedirect.com/science/article/pii/S0142061515002653