References
- Aptean. 2012. “ERP Market.” Accessed December 15. http://www.aptean.com/en/Solutions/By-Application-Area/Enterprise-Resource-Planning-ERP/Resources-Folder/ERP-Market
- Aris Community. 2014. “Event-Driven Process Chain (EPC).” Accessed June 16. http://www.ariscommunity.com/event-driven-process-chain
- Attie, P. C., M. Singh, E. A. Emerson, A. Sheth, and M. Rusinkiewicz. 1996. “Scheduling Workflows by Enforcing Intertask Dependencies.” Distributed Systems Engineering Journal 3 (4): 222–238. doi:10.1088/0967-1846/3/4/003.
- Beheshti, H. M., and C. M. Beheshti. 2010. “Improving Productivity and Firm Performance with Enterprise Resource Planning.” Enterprise Information Systems 4 (4): 445–472. doi:10.1080/17517575.2010.511276.
- Brehm, L., A. Heinzl, and M. L. Markus. 2001. “Tailoring ERP Systems: A Spectrum of Choices and Their Implications.” Paper presented at the HICSS’34 – 34th Annual Hawaii International Conference on System Sciences, Hawaii. doi:10.1109/HICSS.2001.927130
- Chapron, J., X. Boucher, P. Burlat, and P. Lebrun. 2008. “Analysis of Organizational Dependency for Urbanism of Information Systems.” International Journal of Computer Integrated Manufacturing 21 (3): 337–350. doi:10.1080/09511920701370761.
- Dardenne, A., A. Van Lamsweerde, and S. Fickas. 1993. “Goal-Directed Requirements Acquisition.” Science of Computer Programming 20: 3–50. doi:10.1016/0167-6423(93)90021-G.
- Darras, F. 2004. “Proposition of a Framework for the Design and the Operation of an ERP System (In French).” PhD diss., INP Toulouse, France.
- Davenport, T. H. 1998. “Putting the Enterprise into the Enterprise System.” Harvard Business Review 76 (4): 121–131.
- Ducq, Y., and B. Vallespir. 2005. “Definition and Aggregation of a Performance Measurement System in Three Aeronautical Workshops Using the ECOGRAI Method.” Production Planning and Control 16 (2): 163–177. doi:10.1080/09537280512331333066.
- Engelsman, W., D. Quartel, H. Jonkers, and M. Van Sinderen. 2011. “Extending Enterprise Architecture Modelling with Business Goals and Requirements.” Enterprise Information Systems 5 (1): 9–36. doi:10.1080/17517575.2010.491871.
- Escobar-Rodriguez, T., B. Escobar-Pérez, and P. Monge-Lozano. 2012. “Technical and Organisational Aspects in Enterprise Resource Planning Systems Implementation: Lessons from a Spanish Public Hospital.” Enterprise Information Systems 8 (5): 1–30.
- Etien, A. 2009. “Business Process/Information System Co-evolution.” Ingénierie Des Systèmes D’information (ISI), Special Issue on Information Systems Evolution 14 (6): 41–57.
- Gajic, G., S. Stankovski, G. Ostojic, Z. Tesic, and L. Miladjnovic. 2012. “Method of Evaluating the Impact of ERP Implementation Critical Success Factors – A Case Study in Oil and Gas Industries.” Enterprise Information Systems 8 (1): 1–23.
- Glass, R. L. 1998. “Enterprise Resource Planning? Breakthrough and/or Term Problem?” ACM SIGMIS Database 29 (2): 13–16. doi:10.1145/298752.298755.
- ISO 19439. 2006. Enterprise Integration — Framework for Enterprise Modelling. Geneva: ISO Copyright Office.
- ISO/DIS 19440. 2004. Enterprise Integration – Constructs for Enterprise Modelling. Geneva: ISO Copyright Office.
- Lee, S. M., D. L. Olson, and S.-H. Lee. 2009. “Open Process and Open-Source Enterprise Systems.” Enterprise Information Systems 3 (2): 201–209. doi:10.1080/17517570902777624.
- Malone, T., and K. Crowston. 1994. “The Interdisciplinary Study of Coordination.” ACM Computing Surveys 26 (1): 87–119. doi:10.1145/174666.174668.
- Mamoghli, S., V. Goepp, and V. Botta-Genoulaz. 2011. “A Decision Algorithm for ERP Systems Alignment.” International Journal of Business Information Systems 8 (1): 23–45.
- Millet, P.-A., P. Schmitt, and V. Botta-Genoulaz. 2009. “The SCOR Model for the Alignment of Business Processes and Information Systems.” Enterprise Information Systems 3 (4): 393–407. doi:10.1080/17517570903030833.
- Niu, N., M. Jin, and J.-R. C. Cheng. 2011. “A Case Study of Exploiting Enterprise Resource Planning Requirements.” Enterprise Information Systems 5 (2): 183–206. doi:10.1080/17517575.2010.519052.
- Noy, N. F., and D. L. McGuinness. 2001. “Ontology Development 101: A Guide to Creating Your First Ontology.” In Stanford Knowledge Systems Laboratory Technical Report KSL-01-05 and Stanford Medical Informatics Technical Report SMI-2001-0880. Stanford, CA: Stanford University.
- Olson, D. L., and J. Staley. 2012. “Case Study of Open-Source Enterprise Resource Planning Implementation in a Small Business.” Enterprise Information Systems 6 (1): 79–94. doi:10.1080/17517575.2011.566697.
- OMG. 2011. OMG Unified Modeling LanguageTM (OMG UML), Superstructure, version 2.4.1. Needhan, MA: Object Management Group.
- OMG. 2014. “Business Process Model and Notation.” Accessed June 16. http://www.bpmn.org/
- Panorama Consulting Group. 2012. 2012 ERP Report. Denver, CO: Panorama Consulting Solutions.
- Prakash, N., and C. Rolland. 2001. “Matching ERP System Functionality to Customer Requirements”. Paper presented at the 5th IEEE International Symposium on Requirements Engineering, Toronto, Canada.
- Scott, J. E., and L. Kaindl. 2000. “Enhancing Functionality in an Enterprise Software Package.” Information & Management 37 (3): 111–122. doi:10.1016/S0378-7206(99)00040-3.
- Soffer, P., B. Golany, and D. Dori. 2003. “ERP Modeling: A Comprehensive Approach.” Information Systems 28 (6): 673–690. doi:10.1016/S0306-4379(02)00078-9.
- Soffer, P., B. Golany, and D. Dori. 2005. “Aligning an ERP System with Enterprise Requirements: An Object-Process Based Approach.” Information & Management 44 (8): 666–680.
- Soh, C., S. S. Kien, and J. Tay-yap. 2000. “Enterprise Resource Planning: Cultural Fits and Misfits: Is ERP a Universal Solution?” Communications of the ACM 43 (4): 47–51. doi:10.1145/332051.332070.
- Sumner, M. R. 2009. “How Alignment Strategies Influence ERP Project Success.” Enterprise Information Systems 3 (4): 425–448. doi:10.1080/17517570903045617.
- Tsai, W.-H., K.-C. Lee, J.-Y. Liu, S.-J. Lin, and Y.-W. Chou. 2012. “The Influence of Enterprise Resource Planning (ERP) System’s Performance on Earnings Management.” Enterprise Information Systems 6 (4): 491–517. doi:10.1080/17517575.2011.622414.
- Tserng, H. P., S. Y. L. Yin, M. J. Skibniewski, and M. H. Lee. 2010. “Developing an ARIS-House-Based Method from Existing Information Systems to Project-Based Enterprise Resource Planning for General Contractor.” Journal of Construction Engineering and Management 136 (2): 199–209. doi:10.1061/(ASCE)CO.1943-7862.0000125.
- Van Lamsweerde, A. 2001. “Goal-Oriented Requirements Engineering: A Guided Tour”. Paper presented at the 5th IEEE International Symposium on Requirements Engineering, Toronto, Canada.
- Vilpola, I. H. 2008. “A Method for Improving ERP Implementation Success by the Principles and Process of User-Centred Design.” Enterprise Information Systems 2 (1): 47–76. doi:10.1080/17517570701793848.
- Wu, J.-H., -S.-S. Shin, and M. S. H. Heng. 2007. “A Methodology for ERP Misfit Analysis.” Information & Management 44 (8): 666–680. doi:10.1016/j.im.2007.09.001.
- Yahia, E., A. Aubry, and H. Panetto. 2012. “Formal Measures for Semantic Interoperability Assessment in Cooperative Enterprise Information Systems.” Computers in Industry 63 (5): 443–457. doi:10.1016/j.compind.2012.01.010.
- Zeng, Y., and M. J. Skibniewski. 2012. “Risk Assessment for Enterprise Resource Planning (ERP) System Implementations: A Fault Tree Analysis Approach.” Enterprise Information Systems 7 (3): 1–22.
- Zhou, H., D. A. Collier, and D. D. Wilson. 2008. “The Relationship of Strategic Business Alignment and Enterprise Information Management in Achieving Better Business Performance.” Enterprise Information Systems 2 (2): 201–220. doi:10.1080/17517570802095226.
- Zoukar, I. 2005. “MIBE: Requirement Engineering Method for ERP System Implementation (In French).” PhD diss., Paris I University - Sorbonne.