586
Views
21
CrossRef citations to date
0
Altmetric
Original Articles

Integrated scheduling of production and distribution operations in a global MTO supply chain

, & ORCID Icon
Pages 490-514 | Received 13 Sep 2017, Accepted 12 Jan 2018, Published online: 18 Jan 2018

References

  • Armentano, V., A. Shiguemoto, and A. Lokketangen. 2011. “Tabu Search with Path Relinking for an Integrated Production-Distribution Problem.” Computers & Operations Research 38: 1199–1209. doi:10.1016/j.cor.2010.10.026.
  • Bilgen, B., and Y. Celebi. 2013. “Integrated Production Scheduling and Distribution Planning in Dairy Supply Chain by Hybrid Modelling.” Annals of Operations Research 211: 55–82. doi:10.1007/s10479-013-1415-3.
  • Bitam, S., S. Zeadally, and A. Mellouk. 2017. “Fog Computing Job Scheduling Optimization Based on Bees Swarm.” Enterprise Information Systems 1–25. doi:10.1080/17517575.2017.1304579.
  • Cakici, E., S. Mason, and M. Kurz. 2012. “Multi-Objective Analysis of an Integrated Supply Chain Scheduling Problem.” International Journal of Production Research 50: 2624–2638. doi:10.1080/00207543.2011.578162.
  • Chang, Y.-C., and C.-Y. Lee. 2004. “Machine Scheduling with Job Delivery Coordination.” European Journal of Operational Research 158: 470–487. doi:10.1016/S0377-2217(03)00364-3.
  • Chen, Z. 2010. “Integrated Production and Outbound Distribution Scheduling: Review and Extensions.” Operations Research 58: 130–148. doi:10.1287/opre.1080.0688.
  • Chen, Z., and G. Pundoor. 2006. “Order Assignment and Scheduling in a Supply Chain.” Operations Research 54: 555–572. doi:10.1287/opre.1060.0280.
  • Chen, Z., and G. Pundoor. 2009. “Integrated Order Scheduling and Packing.” Production and Operations Management 18: 672–692. doi:10.1111/poms.2009.18.issue-6.
  • Chen, Z., and G. Vairaktarakis. 2005. “Integrated Scheduling of Production and Distribution Operations.” Management Science 51: 614–628. doi:10.1287/mnsc.1040.0325.
  • Chiang, W., R. Russell, X. Xu, and D. Zepeda. 2009. “A Simulation/Metaheuristic Approach to Newspaper Production and Distribution Supply Chain Problems.” International Journal of Production Economics 121: 752–767. doi:10.1016/j.ijpe.2009.03.001.
  • Davis, L. 1991. Handbook of Genetic Algorithms. New York: Van Nostrand Reinhold.
  • Dawande, M., H. Geismar, N. Hall, and C. Sriskandarajah. 2006. “Supply Chain Scheduling: Distribution Systems.” Production and Operations Management 15: 243–261. doi:10.1111/j.1937-5956.2006.tb00243.x.
  • Garcia, J. M., S. Lozano, and D. Canca. 2004. “Coordinated Scheduling of Production and Delivery from Multiple Plants.” Robotics and Computer-Integrated Manufacturing 20: 191–198. doi:10.1016/j.rcim.2003.10.004.
  • Geismar, H., G. Laporte, L. Lei, and C. Sriskandarajah. 2008. “The Integrated Production and Transportation Scheduling Problem for a Product with a Short Lifespan.” INFORMS Journal on Computing 20: 21–33. doi:10.1287/ijoc.1060.0208.
  • Glover, F. 1989. “Tabu Search - Part 1.” ORSA Journal on Computing 1: 190–206. doi:10.1287/ijoc.1.3.190.
  • Goldberg, D. E. 1989. Genetic Algorithms in Search, Optimization and Machine Learning. Boston, MA: USA Addison-Wesley.
  • Guo, Z. X., H. Liu, D. Zhang, and J. Yang. 2017. “Green Supplier Evaluation and Selection in Apparel Manufacturing Using a Fuzzy Multi-Criteria Decision-Making Approach.” Sustainability 9: 650. doi:10.3390/su9040650.
  • Guo, Z. X., E. W. T. Ngai, C. Yang, and X. D. Liang. 2015. “An RFID-based Intelligent Decision Support System Architecture for Production Monitoring and Scheduling in a Distributed Manufacturing Environment.” International Journal of Production Economics 159: 16–28. doi:10.1016/j.ijpe.2014.09.004.
  • Guo, Z. X., W. K. Wong, and S. Y. S. Leung. 2013. “A Hybrid Intelligent Model for Order Allocation Planning in Make-To-Order Manufacturing.” Applied Soft Computing 13: 1376–1390. doi:10.1016/j.asoc.2012.07.019.
  • Li, C. L., and J. W. Ou. 2007. “Coordinated Scheduling of Customer Orders with Decentralized Machine Locations.” IIE Transactions 39: 899–909. doi:10.1080/07408170600972990.
  • Li, K. P., V. K. Ganesan, and A. I. Sivakumar. 2006. “Scheduling of Single Stage Assembly with Air Transportation in a Consumer Electronic Supply Chain.” Computers & Industrial Engineering 51: 264–278. doi:10.1016/j.cie.2006.02.007.
  • Li, K. P., A. I. Sivakumar, and V. K. Ganesan. 2008. “Analysis and Algorithms for Coordinated Scheduling of Parallel Machine Manufacturing and 3PL Transportation.” International Journal of Production Economics 115: 482–491. doi:10.1016/j.ijpe.2008.07.007.
  • Moscato, P. 1989. “On Evolution, Search, Optimization, Genetic Algorithms and Martial Arts: Towards Memetic Algorithms.” Caltech Concurrent Computation Program (Report 826).
  • Ong, Y., M. Lim, and X. Chen. 2010. “Memetic computation-Past, Present & Future.” IEEE Computational Intelligence Magazine 5: 24–31. doi:10.1109/MCI.2010.936309.
  • Selim, H., C. Araz, and I. Ozkarahan. 2008. “Collaborative Production Distribution Planning in Supply Chain: Fuzzy Goal Programming Approach.” Transportation Research Part E: Logistics and Transportation Review (TRE) 44: 396–419. doi:10.1016/j.tre.2006.11.001.
  • Selvarajah, E., and R. Zhang. 2014. “Supply Chain Scheduling to Minimize Holding Costs with Outsourcing.” Annals of Operations Research 217: 479–490. doi:10.1007/s10479-013-1522-1.
  • She, J., Y. X. Tong, L. Chen, and C. C. Cao. 2016. “Conflict-Aware Event-Participant Arrangement and Its Variant for Online Setting.” IEEE Transactions on Knowledge and Data Engineering (TKDE) 28 (9): 2281–2295. doi:10.1109/TKDE.2016.2565468.
  • Stecke, K. E., and X. Zhao. 2007. “Production and Transportation Integration for a Make-To-Order Manufacturing Company with a Commit-To-Delivery Business Mode.” Manufacturing & Service Operations Management 9: 206–224. doi:10.1287/msom.1060.0138.
  • Tang, L. X., and H. Gong. 2009. “The Coordination of Transportation and Batching Scheduling.” Applied Mathematical Modelling 33: 3854–3862. doi:10.1016/j.apm.2009.01.002.
  • Ting, C., and X. Liao. 2013. “The Selective Pickup and Delivery Problem: Formulation and a Memetic Algorithm.” International Journal of Production Economics 141: 199–211. doi:10.1016/j.ijpe.2012.06.009.
  • Tong, Y., L. Wang, Z. Zhou, B. Ding, L. Chen, J. Ye, and K. Xu. 2017. “Flexible Online Task Assignment in Real-Time Spatial Data.” Proceedings of the VLDB Endowment 10: 1334–1345. doi:10.14778/3137628.
  • Ullrich, C. A. 2013. “Integrated Machine Scheduling and Vehicle Routing with Time Windows.” European Journal of Operational Research 227: 152–165. doi:10.1016/j.ejor.2012.11.049.
  • Wang, H., Y. Fu, M. Huang, G. Huang, and J. Wang. 2017a. “A Hybrid Evolutionary Algorithm with Adaptive Multi-Population Strategy for Multi-Objective Optimization Problems.” Soft Computing 21: 5975–5987. doi:10.1007/s00500-016-2414-5.
  • Wang, H., Y. Fu, M. Huang, G. Q. Huang, and J. Wang. 2017b. “A NSGA-II Based Memetic Algorithm for Multiobjective Parallel Flowshop Scheduling Problem.” Computers & Industrial Engineering 113: 185–194. doi:10.1016/j.cie.2017.09.009.
  • Wang, H., Y. Fu, M. Huang, and J. Wang. 2016. “Multiobjective Optimisation Design for Enterprise System Operation in the Case of Scheduling Problem with Deteriorating Jobs.” Enterprise Information Systems 10: 268–285. doi:10.1080/17517575.2015.1078913.
  • Wang, H., D. Wang, and S. Yang. 2009. “A Memetic Algorithm with Adaptive Hill Climbing Strategy for Dynamic Optimization Problems.” Soft Computing-A Fusion of Foundations, Methodologies and Applications 13: 763–780.
  • Wang, X. L., and T. C. E. Cheng. 2009. “Logistics Scheduling to Minimize Inventory and Transport Costs.” International Journal of Production Economics 121: 266–273. doi:10.1016/j.ijpe.2009.05.007.
  • Zhou, L., L. Zhang, C. Zhao, Y. Laili, and L. Xu. 2017. “Diverse Task Scheduling for Individualized Requirements in Cloud Manufacturing.” Enterprise Information Systems 1–19. doi:10.1080/17517575.2017.1364428.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.