Development of Operator Action Time for SBLOCA during Plant Shutdown Operation in Power-uprated Kori 3 and 4

, , &
Pages 1199-1209 | Received 09 Oct 2006, Accepted 18 May 2007, Published online: 05 Jan 2012

References

  • NRC . 1993 . Shutdown and Low-power Operations at Commercial Nuclear Power Plants in the United States , NUREG-1449
  • ANS . 1994 . Time Response Design Criteria for Safety-related Operator Actions , ANSI/ANS-58. 8
  • Klimek , J. A. , Osterrieder , R. A. and Gresham , J. A. 2000 . Evaluation of LOCA during Mode 3 and Mode 4 Operation for Westinghouse NSSS , Westinghouse Co., WCAP-12476 Rev. 1
  • Yoon , D. J. Kim , Y. S. 2005 . Optimization for setpoints of SG water level control systems in power-uprated YGN 1&2 and Kori 3&4 . J. Nucl. Sci. Technol. , 42 ( 12 ) : 1067 – 1076 .
  • Ministry of Commerce Industry and Energy (MOCIE) . 2005 . Safety Analysis Report-1&2, Seoul, Korea
  • NRC . 2001 . RELAP5/MOD3.3 Code Manual , NUREC/CR-5535/Rev 1
  • ANS . 1979 . Decay Heat Power in Light Water Reactors , ANSI/ANS 5.1–1979 USA
  • Korea Nuclear Fuel Co . 2004 . LOCA/Non-LOCA Safety Injection Flow , KED/FD-040044M, Daejeon, Korea (KNFC
  • Westinghouse Electric Co . 1984 . Kori-3,4 Precautions, Limitations & Setpoints, Rev. 1

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.