Issues in reverse supply chains, part I: end‐of‐life product recovery and inventory management – an overview

&
Pages 154-172 | Received 23 Apr 2008, Accepted 26 Aug 2008, Published online: 04 Nov 2008

References

  • Al‐Anzi , F. S. , Allahverdi , A. and Kovalyov , M. Y. 2007 . Batching deteriorating items with applications in computer communication and reverse logistics. . European Journal of Operational Research , 182 (3) : 1002 – 1011 .
  • Amini , M. M. , Retzlaff‐Roberts , D. and Bienstock , C. C. 2005 . Designing a reverse logistics operation for short cycle time repair services. . International Journal of Production Economics , 96 (3) : 367 – 380 .
  • Ammons , J. C. , Realff , M. J. and Newton , D. 1999 . Carpet recycling: determining the reverse production system design. . The Journal of Polymer‐Plastics Technology and Engineering , 38 (3) : 547 – 567 .
  • Andrés , C. , Lozano , S. and Adenso‐Díaz , B. 2007 . Disassembly sequence planning in a disassembly cell context. . Robotics and Computer‐Integrated Manufacturing , 23 (6) : 690 – 695 .
  • Aras , N. , Boyaci , T. and Verter , V. 2004 . The effect of categorizing returned products in remanufacturing. . IIE Transactions , 36 : 319 – 331 .
  • Ashayeri , J. , Heuts , R. and Jansen , A. 1996 . Inventory management of repairable service parts for personal computers. . International Journal of Operations & Production Management , 16 : 74 – 97 .
  • Ayres , R. U. , Ferrer , G. and Leynseele , T. V. 1997 . Eco‐efficiency, asset recovery and remanufacturing. . European Management Journal , 15 : 557 – 574 .
  • Ayres , R. U. 1997 . Metals recycling: economic and environmental implications. . Resources, Conservation and Recycling , 21 : 145 – 173 .
  • Barba‐Gutiérrez , Y. , Adenso‐Díaz , B. and Gupta , S. M. 2008 . Lot sizing in reverse MRP for scheduling disassembly. . International Journal of Production Economics , 111 (2) : 741 – 751 .
  • Barros , A. I. , Dekker , R. and Scholten , V. 1998 . A two‐level network for recycling sand: a case study. . European Journal of Operational Research , 110 (2) : 199 – 214 .
  • Beamon , B. M. 1999 . Designing the green supply chain. . Logistics Information Management , 12 (4) : 332 – 342 .
  • Bellmann , K. and Khare , A. 1999 . European response to issues in recycling car plastics. . Technovation , 19 : 721 – 734 .
  • Bellmann , K. and Khare , A. 2000 . Economic issues in recycling end‐of‐life vehicles. . Technovation , 20 : 677 – 690 .
  • Biehl , M. , Prater , E. and Realff , M. J. 2007 . Assessing performance and uncertainty in developing carpet reverse logistics systems. . Computers & Operations Research , 34 (2) : 443 – 463 .
  • Bloemhof‐Ruwaard , J. M. , Salomon , M. and Van Wassenhove , L. N. 1996 . The capacitated distribution and waste disposal problem. . European Journal of Operational Research , 88 : 490 – 503 .
  • Bloemhof‐Ruwaard , J. M. 1995 . Interactions between operational research and environmental management. . European Journal of Operational Research , 85 (2) : 229 – 243 .
  • Bogataj , M. and Bogataj , L. 2004 . On the compact presentation of the lead times perturbations in distribution networks. . International Journal of Production Economics , 88 (2) : 145 – 155 .
  • Bohm , P. 1997 . The Economics of Environmental Protection , 131 – 173 . Cheltenham : Edward Elgar Publishing .
  • Boon , J. E. , Isaacs , J. A. and Gupta , S. M. 2002 . Economic sensitivity for end of life planning and processing of personal computers. . Journal of Electronics Manufacturing , 11 (1) : 81 – 93 .
  • Brander , P. and Forsberg , R. 2005 . Cyclic lot scheduling with sequence‐dependent set‐ups: a heuristic for disassembly processes. . International Journal of Production Research , 43 (2) : 295 – 310 .
  • Buchanan , D. J. and Abad , P. L. 1998 . Optimal policy for a periodic review returnable inventory system. . IIE Transactions , 30 : 1049 – 1055 .
  • Carlson , R. L. 1985 . The impact of materials recycling programs on energy recovery economics. . Journal of Resource Management and Technology , 15 (1) : 28 – 36 .
  • Carter , C. R. and Ellram , L. M. 1998 . Reverse logistics: a review of the literature and framework for future investigation. . Journal of Business Logistics , 19 (1) : 85 – 102 .
  • Caruso , C. , Colorni , A. and Paruccini , M. 1993 . The regional urban solid waste management system: a modeling approach. . European Journal of Operational Research , 70 : 16 – 30 .
  • Chang , N. B. and Wang , S. F. 1994 . A locational model for the site selection of solid waste management facilities with traffic congestion constraint. . Civil Engineering Systems , 11 : 287 – 306 .
  • Chang , N. B. and Wang , S. F. 1996 . Comparative risk analysis of solid waste management alternatives in a metropolitan region. . Environmental Management , 20 (1) : 65 – 80 .
  • Chang , N. B. , Shoemaker , C. A. and Schuler , R. E. 1996a . Solid waste management system analysis with air pollution and leach ate impact limitations. . Waste Management Research , 14 : 463 – 481 .
  • Chang , N. B. , Yang , Y. C. and Wang , S. F. 1996b . Solid waste management system analysis with noise control and traffic congestion limitations. . Journal of Environmental Engineering , 122 (2) : 122 – 131 .
  • Chang , N. B. , Lu , H. Y. and Wei , Y. L. 1997 . GIS technology for vehicle routing and scheduling in the solid waste collection systems. . Journal of Environmental Engineering , 123 (9) : 901 – 910 .
  • Cho , D. I. and Parlar , M. 1991 . A survey of maintenance models for multi‐unit systems. . European Journal of Operational Research , 51 (1) : 1 – 23 .
  • Cohen , M. A. , Pierskalla , W. P. and Nahmias , S. 1980 . A dynamic inventory system with recycling. . Naval Research Logistics Quarterly , 27 : 289 – 296 .
  • Cohen , M. A. , Zheng , Y. and Agrawal , V. 1997 . Service parts logistics: a benchmark analysis. . IIE Transactions , 29 : 627 – 639 .
  • Cohen , M. A. , Zheng , Y. and Wang , Y. 1999 . Identifying opportunities for improving Teradyne's service‐parts logistics system. . Interfaces , 29 (4) : 1 – 18 .
  • Çorbacıoğlu , U. and Van der Laan , E. A. 2007 . Setting the holding cost rates in a two‐product system with remanufacturing. . International Journal of Production Economics , 109 (1–2) : 185 – 194 .
  • Craig Smith , N. , Thomas , R. J. and Quelch , J. A. 1996 . A strategic approach to managing product recalls. . Harvard Business Review , : 102 – 112 .
  • Dawe , R. L. 1995 . Reengineer your returns. . Transportation and Distribution , 78
  • Debo , L. , Totkay , B. and Van Wassenhove , L. N. 2005 . Market segmentation and product technology selection for remanufacturable products. . Management Science , 51 (8) : 1193 – 1205 .
  • De Fazio , T. L. , Delchambre , A. and de Lit , P. 1997 . Disassembly for recycling of office electronic equipment. . European Journal of Mechanical and Environmental Engineering , 42 : 25 – 31 .
  • De Ron , A. and Penev , K. 1995 . Disassembly and recycling of electronic consumer products: an overview. . Technovation , 15 : 363 – 374 .
  • Degher , A. 2002 . HP's worldwide take back and recycling programs: Lessons on improving program implementation. . IEEE international symposium on electronics and the environment. , : 224 – 227 . IEEE Press, San Francisco, USA
  • Diaz , A. and Fu , M. C. 1997 . Models for multi‐echelon repairable item inventory systems with limited repair capacity. . European Journal of Operational Research , 97 (3) : 480 – 492 .
  • Dobos , I. 2003 . Optimal production–inventory strategies for a HMMS‐type reverse logistics system. . International Journal of Production Economics , : 351 – 360 .
  • Dobos , I. and Richter , K. 2004 . An extended production/recycling model with stationary demand and return rates. . International Journal of Production Economics , 90 (3) : 311 – 323 .
  • Dobos , I. and Richter , K. 2006 . A production/recycling model with quality consideration. . International Journal of Production Economics , 104 (2) : 571 – 579 .
  • Failli , F. and Dini , G. 2001 . Optimization of disassembly sequences for recycling of end‐of‐life products by using a colony of antlike agents. . Proceedings of the 14th international conference on industrial and engineering applications of artificial intelligence and expert systems IEA/AIE , : 632 – 639 . Budapest, Hungary
  • Ferrer , G. 1997a . The economics of tire remanufacturing. . Resources, Conservation and Recycling , 19 : 221 – 255 .
  • Ferrer , G. 1997b . The economics of personal computer remanufacturing. . Resources, Conservation and Recycling , 21 : 79 – 108 .
  • Ferrer , G. 2001 . On the widget remanufacturing operation. . European Journal of Operational Research , 135 : 373 – 393 .
  • Ferrer , G. 2003 . Yield information and supplier responsiveness in remanufacturing operations. . European Journal of Operational Research , 149 : 540 – 556 .
  • Ferrer , G. and Ayres , R. U. 2000 . The impact of remanufacturing in the economy. . Ecological Economics , 32 : 413 – 429 .
  • Ferrer , G. and Guide , V. D. R. 2002 . “ Remanufacturing cases and state of the art. ” . In A handbook of industrial ecology , Edited by: Ayres , R. U and Ayres , L. W . 510 – 520 . Cheltenham : Edward Elgar Publishing .
  • Ferrer , G. and Ketzenberg , M. E. 2004 . Value of information in remanufacturing complex products. . IIE Transactions , 36 : 265 – 277 .
  • Ferrer , G. and Swaminathan , J. M. 2006 . Managing new and remanufactured products. . Management Science , 52 (1) : 15 – 26 .
  • Fleischmann , M. 1997 . Quantitative models for reverse logistics: a review. . European Journal of Operational Research , 103 (1) : 1 – 17 .
  • Fleischmann , M. , Kuik , R. and Dekker , R. 2002 . Controlling inventories with stochastic item returns: a basic model. . European Journal of Operational Research , 138 (1) : 63 – 75 .
  • Fullerton , D. and Wu , W. 1998 . Policies for green design. . Journal of Environmental Economics and Management , 36 : 131 – 148 .
  • Georgiadis , P. and Vlachos , D. 2004 . The effect of environmental parameters on product recovery. . European Journal of Operational Research , 157 (2) : 449 – 464 .
  • Gerrard , J. and Kandlikar , M. 2007 . Is European end‐of‐life vehicle legislation living up to expectations? Assessing the impact of the ELV directive on ‘green’ innovation and vehicle recovery. . Journal of Cleaner Production , 15 (1) : 17 – 27 .
  • Giannikos , I. 1998 . A multi‐objective programming model for locating treatment sites and routing hazardous wastes. . European Journal of Operational Research , 104 : 333 – 342 .
  • González , B. and Adenso‐Díaz , B. 2006 . A scatter search approach to the optimum disassembly sequence problem. . Computers and Operations Research , 33 (6) : 1776 – 1793 .
  • González‐Torre , P. L. , Adenso‐Díaz , B. and Artiba , H. 2004 . Environmental and reverse logistics policies in European bottling and packaging firms. . International Journal of Production Economics , 88 (1) : 95 – 104 .
  • González‐Torre , P. L. and Adenso‐Díaz , B. 2006 . Reverse logistics practices in the glass sector in Spain and Belgium. . International Business Review , 15 (5) : 527 – 546 .
  • Guide , V. D. R. Jr . 2000 . Production planning and control for remanufacturing: industry practice and research needs. . Journal of Operations Management , 18 : 467 – 483 .
  • Guide , V. D. R. Jr and Jayaraman , V. 2000 . Product acquisition management: current industry practice and a proposed framework. . International Journal of Production Research , 38 : 3779 – 3800 .
  • Guide , V. D. R. Jr , Jayaraman , V. and Srivastava , R. 1999 . Production planning and control for remanufacturing: a state‐of‐the‐art survey. . Robotics and Computer Integrated Manufacturing , 15 : 221 – 230 .
  • Guide , V. D. R. Jr , Kraus , M. E. and Srivastava , R. 1997 . Scheduling policies for remanufacturing. . International Journal of Production Economics , 48 : 187 – 204 .
  • Guide , V. D. R. Jr and Van Wassenhove , L. N. 2001 . Managing product returns for remanufacturing. . Production and Operations Management , 10 (2) : 142 – 155 .
  • Guide , V. D. R. Jr , Souza , G. C. and Van der Laan , E. 2005 . Performance of static priority rules for shared facilities in a remanufacturing shop with disassembly and reassembly. . European Journal of Operational Research , 164 : 341 – 353 .
  • Guide , V. D. R. Jr , Teunter , R. H. and Van Wassenhove , L. N. 2003 . Matching demand and supply to maximize profits from remanufacturing. . Manufacturing & Service Operations Management , 5 (4) : 303 – 316 .
  • Gupta , S. M. and McLean , C. R. 1996 . Disassembly of products. . Computers and Industrial Engineering , 31 (1/2) : 225 – 228 .
  • Gupta , S. M. and Taleb , K. N. 1994 . Scheduling disassembly. . International Journal of Production Research , 32 (8) : 1857 – 1866 .
  • Gupta , S. M. and Taleb , K. N. 1996 . “ An algorithm to disassemble multiple product structures with multiple occurrence of parts. ” . In Proceedings of the international seminar on reuse 153 – 162 . Springer, Eindhoven, the Netherlands
  • Gupta , S. M. and Isaacs , J. A. 1997 . Value analysis of disposal strategies for automobiles. . Computers and Industrial Engineering , 33 (1–2) : 325 – 328 .
  • Gungor , A. 2006 . Evaluation of connection types in design for disassembly (DFD) using analytic network process. . Computers and Industrial Engineering , 50 : 35 – 54 .
  • Gungor , A. and Gupta , S. M. 1997 . An evaluation methodology for disassembly processes. . Computers and Industrial Engineering , 33 (1) : 329 – 332 .
  • Gungor , A. and Gupta , S. M. 1999 . Issues in environmentally conscious manufacturing and product recovery: a survey. . Computers and Industrial Engineering , 36 (4) : 811 – 853 .
  • Gungor , A. and Gupta , S. M. 2001 . Disassembly sequence plan generation using a branch‐and‐bound algorithm. . International Journal of Production Research , 39 (3) : 481 – 509 .
  • Gungor , A. and Gupta , S. M. 2002 . Disassembly line in product recovery. . International Journal of Production Research , 40 : 2569 – 2589 .
  • Haastrup , P. 1998 . A decision support system for urban waste management. . European Journal of Operational Research , 109 : 330 – 341 .
  • Hawickhorst , W. 1997 . Management of radioactive wastes from the operation of nuclear power plants. . Nuclear Engineering and Design , 176 : 171 – 176 .
  • Heyman , D. P. 1977 . Optimal disposal policies for a single‐item inventory system with returns. . Naval Research Logistics Quarterly , 24 : 385 – 405 .
  • Hicks , C. 2004 . A functional model of supply chains and waste. . International Journal of Production Economics , 89 : 165 – 174 .
  • Hirsch , B. E. , Kuhlmann , T. and Schumacher , J. 1998 . Logistics simulation of recycling networks. . Computers in Industry , 36 : 31 – 38 .
  • Hoshino , T. , Yura , K. and Hitomi , K. 1995 . Optimization analysis for recycle‐oriented manufacturing systems. . International Journal of Production Research , 33 : 2069 – 2078 .
  • Hoyle , G. 1995 . Recycling opportunities in the UK for aluminium‐bodied motor cars. . Resources, Conservation and Recycling , 15 : 181 – 191 .
  • Hu , T. L. , Sheu , J. B. and Huang , K. H. 2002 . A reverse logistics cost minimization model for the treatment of hazardous wastes. . Transportation Research Part E: Logistics and Transportation Review , 38 (6) : 457 – 473 .
  • Inderfurth , K. 1997 . Simple optimal replenishment and disposal policies for a product recovery system with lead times. . OR Spectrum , 19 : 111 – 122 .
  • Inderfurth , K. , de Kok , A. G. and Flapper , S. D. P. 2001 . Product recovery in stochastic remanufacturing systems with multiple reuse options. . European Journal of Operational Research , 133 : 130 – 152 .
  • Inderfurth , K. and Langella , I. M. 2006 . Heuristics for solving disassemble‐to‐order problems with stochastic yields. . OR Spectrum , 28 (1) : 73 – 99 .
  • Inderfurth , K. and Van der Laan , E. 2001 . Lead time effects and policy improvement for stochastic inventory control with remanufacturing. . International Journal of Production Economics , 71 : 381 – 390 .
  • Isaacs , J. A. and Gupta , S. M. 1997 . Economic consequences of increasing polymer content on the US automobile recycling infrastructure. . Journal of Industrial Ecology , 1 : 19 – 34 .
  • Jayaraman , V. 2006 . Production planning for closed‐loop supply chains with product recovery and reuse: an analytical approach. . International Journal of Production Research , 44 (5) : 981 – 998 .
  • Jennings , A. A. and Scholar , R. L. 1984 . Hazardous waste disposal network analysis. . Journal of Environmental Engineering (ASCE) , 110 (2) : 325 – 342 .
  • Johnson , P. F. 1998 . Managing value in reverse logistics systems. . Transportation Research Part E: Logistics and Transportation Review , 34 (3) : 217 – 227 .
  • Johnson , M. R. and Wang , M. H. 1995 . Planning product disassembly for material recovery opportunities. . International Journal of Production Research , 33 (11) : 3119 – 3142 .
  • Johnson , M. R. and Wang , M. H. 1998 . Economic evaluation of disassembly operations for recycling, remanufacturing and reuse. . International Journal of Production Research , 36 (12) : 3227 – 3252 .
  • Kannan , G. , Haq , A. N. and Devika , M. 2008a . Analysis of closed loop supply chain using genetic algorithm and particle swarm optimization. . International Journal of Production Research , in press, DOI:10.1080/00207540701543585
  • Kannan , G. , Haq , A. N. and Sasikumar , P. 2008b . An application of the analytical hierarchy process and fuzzy analytical hierarchy process in the selection of collecting centre location for the reverse logistics Multicriteria decision‐making supply chain model. . International Journal of Management and Decision Making , 9 (4) : 350 – 365 .
  • Kara , S. , Rugrungruang , F. and Kaebernick , H. 2007 . Simulation modelling of reverse logistics networks. . International Journal of Production Economics , 106 (1) : 61 – 69 .
  • Kelle , P. and Silver , E. A. 1989 . Forecasting the returns of reusable containers. . Journal of Operations Management , 8 (1) : 17 – 35 .
  • Khoei , A. R. , Masters , I. and Gethin , D. T. 2002 . Design optimization of aluminium recycling processes using Taguchi technique. . Journal of Material Processing Technology , 127 : 96 – 106 .
  • Kiesmüller , G. P. and Minner , S. 2003 . Simple expression for finding recovery system inventory control parameter values. . Journal of the Operational Research Society , 53 : 83 – 88 .
  • Kiesmüller , G. P. and Scherer , C. W. 2003 . Computational issues in a stochastic finite horizon one product recovery inventory model. . European Journal of Operational Research , 146 (3) : 553 – 579 .
  • Kiesmüller , G. P. and Van der Laan , E. A. 2001 . An inventory model with dependent product demands and returns. . International Journal of Production Economics , 72 : 73 – 87 .
  • Kim , H. J. , Lee , D. H. and Xirouchakis , P. 2006b . Two‐phase heuristic for disassembly scheduling with multiple product types and parts commonality. . International Journal of Production Research , 44 (1) : 195 – 212 .
  • Kim , K. 2006a . Supply planning model for remanufacturing system in reverse logistics environment. . Computers & Industrial Engineering , 51 (2) : 279 – 287 .
  • Kleber , R. , Minner , S. and Kiesmüller , G. 2002 . A continuous time inventory model for a product recovery system with multiple options. . International Journal of Production Economics , 79 (2) : 121 – 141 .
  • Kleineidam , U. 2000 . Optimizing product recycling chains by control theory. . International Journal of Production Economics , 66 : 185 – 195 .
  • Koh , S. G. 2002 . An optimal ordering and recovery policy for reusable items. . Computers & Industrial Engineering , 43 : 59 – 73 .
  • Koo , J. K. , Shin , H. S. and Yoo , H. C. 1991 . Multi objective siting planning for a regional hazardous waste treatment center. . Waste Management and Research , 9 : 218 – 250 .
  • Korugan , A. and Gupta , S. M. 1998 . A multi‐echelon inventory system with returns. . Computers and Industrial Engineering , 35 : 145 – 148 .
  • Krikke , H. 2008 . Low‐frequency collection of materials disassembled from end‐of‐life vehicles: on the value of on‐line monitoring in optimizing route planning. . International Journal of Production Economics , 111 (2) : 209 – 228 .
  • Krikke , H. R. , Van Harten , A. and Schuur , P. C. 1998 . On a medium term product recovery and disposal strategy for durable assembly products. . International Journal of Production Research , 36 (1) : 111 – 139 .
  • Krikke , H. R. , Van Harten , A. and Schuur , P. C. 1999a . Business case Roteb: recovery strategies for monitors. . Computers & Industrial Engineering , 36 (4) : 739 – 757 .
  • Krikke , H. R. , Van Harten , A. and Schuur , P. C. 1999b . Business case Océ: reverse logistics network re‐design for copiers. . OR Spectrum , 21 : 381 – 409 .
  • Kroon , L. and Vrijens , G. 1995 . Returnable containers: an example of reverse logistics. . International Journal of Physical Distribution and Logistics Management , 25 : 56 – 68 .
  • Kulshreshtha , P. and Sarangi , S. 2001 . No return, no refund: an analysis of deposit–refund systems. . Journal of Economic Behavior & Organization , 46 : 379 – 394 .
  • Kumar , S. 2004 . Estimation method of national methane emission from solid waste landfills. . Atmospheric Environment , 38 : 3481 – 3487 .
  • Kuo , T. C. , Zhang , H. C. and Huang , S. H. 2000 . Disassembly analysis for electromechanical products: a graph‐based heuristic approach. . International Journal of Production Research , 38 (5) : 993 – 1007 .
  • Lambert , A. J. D. 1997 . Optimal disassembly of complex products. . International Journal of Production Research , 35 (9) : 2509 – 2523 .
  • Lambert , A. J. D. 1999 . Linear programming in disassembly/clustering generation. . Computers & Industrial Engineering , 36 : 723 – 738 .
  • Lambert , A. J. D. 2002 . Determining optimum disassembly sequences in electronic equipment. . Computers and Industrial Engineering , 43 : 553 – 575 .
  • Lambert , A. J. D. 2003 . Disassembly sequencing: a survey. . International Journal of Production Research , 41 (16) : 3721 – 3759 .
  • Lambert , A. J. D. 2006 . Exact methods in optimum disassembly sequence search for problems subject to sequence dependent costs. . Omega , 34 (6) : 538 – 549 .
  • Langella , I. M. 2007 . Heuristics for demand‐driven disassembly planning. . Computers & Operations Research , 34 (2) : 552 – 577 .
  • Lebreton , B. and Tuma , A. 2007 . A quantitative approach to assessing the profitability of car and truck tire remanufacturing. . International Journal of Production Economics , 104 (2) : 639 – 652 .
  • Legarth , J. B. 1996 . Sustainable metal resource management‐the need for industrial development: efficiency improvement demands on metal resource management to enable a (sustainable) supply until 2050. . Journal of Cleaner Production , 4 : 97 – 104 .
  • Linton , J. D. and Johnson , D. A. 2000 . A decision support system for planning remanufacturing at Nortel Networks. . Interfaces , 30 : 17 – 31 .
  • Listes , O. and Dekker , R. 2005 . A stochastic approach to a case study for product recovery network design. . European Journal of Operational Research , 160 (1) : 268 – 287 .
  • Logožar , K. , Radonjič , G. and Bastič , M. 2006 . Incorporation of reverse logistics model into in‐plant recycling process: a case of aluminium industry. . Resources, Conservation and Recycling , 49 (1) : 49 – 67 .
  • Louwers , D. 1999 . A facility location allocation model for reusing carpet material. . Computers and Industrial Engineering , 36 (4) : 855 – 869 .
  • Mabini , M. C. and Gelders , L. F. 1991 . Repairable item inventory system: a literature review. . Belgian Journal of Operations Research, Statistics and Computer Science , 30 (4) : 57 – 69 .
  • Majumder , P. and Groenevelt , H. 2001 . Competition in remanufacturing. . Production and Operations Management , 10 (2) : 125 – 141 .
  • Mabini , M. C. , Pintelon , L. M. and Gelders , L. F. 1992 . EOQ type formulation for controlling repairable inventories. . International Journal of Production Economics , 28 : 21 – 33 .
  • Mahadevan , B. , Pyke , D. F. and Fleischmann , M. 2003 . Periodic review, push inventory policies for remanufacturing. . European Journal of Operational Research , 151 (3) : 536 – 551 .
  • Melachrinoudis , E. , Min , H. and Wu , X. 1995 . A multi objective model for the dynamic location of landfills. . Location Science , 3 (3) : 143 – 166 .
  • Melissen , F. W. and de Ron , A. J. 1999 . Defining recovery practices – definitions and terminology. . International Journal on Environmentally Conscious Design and Manufacturing , 8 : 1 – 18 .
  • Minner , S. 2001 . Strategic safety stocks in reverse logistics supply chains. . International Journal of Production Economics , 71 (1–3) : 417 – 428 .
  • Minner , S. 2003 . Multiple‐supplier inventory models in supply chain management: a review. . International Journal of Production Economics , : 81 – 82 . 265 – 279 .
  • Minner , S. and Kleber , R. 2001 . Optimal control of production and remanufacturing in a simple recovery model with linear cost functions. . OR Spectrum , 23 : 3 – 24 .
  • Mitra , S. 2007 . Revenue management for remanufactured products. . Omega , 35 (5) : 553 – 562 .
  • Moffat , J. 1992 . Resources for the repair of non‐modular aero‐engines. . Omega , 20 (1) : 99 – 103 .
  • Mok , H. S. , Kim , H. J. and Moon , K. S. 1997 . Disassemblability of mechanical parts in automobile for recycling. . Computers & Industrial Engineering , 33 (3–4) : 621 – 624 .
  • Mont , O. , Dalhammar , C. and Jacobsson , N. 2006 . A new business model for baby prams based on leasing and product remanufacturing. . Journal of Cleaner Production , 14 (17) : 1509 – 1518 .
  • Moore , K. E. , Gungor , A. K. and Gupta , S. M. 1998 . A Petri net approach to disassembly process planning. . Computers & Industrial Engineering , 35 : 165 – 168 .
  • Moore , K. E. , Gungor , A. and Gupta , S. M. 2001 . Petri net approach to disassembly process planning for products with complex and/or precedence relationships. . European Journal of Operational Research , 135 : 428 – 449 .
  • Mostard , J. and Teunter , R. 2006 . The newsboy problem with resalable returns: A single period model and case study. . European Journal of Operational Research , 169 (1) : 81 – 96 .
  • Moyer , L. and Gupta , S. M. 1997 . Environmental concerns and recycling/disassembly efforts in the electronics industry. . Journal of Electronics Manufacturing , 7 (1) : 1 – 22 .
  • Muckstadt , J. A. and Isaac , M. H. 1981 . An analysis of single item inventory systems with returns. . Naval Research Logistics Quarterly , 28 : 237 – 254 .
  • Mukhopadhyay , S. K. and Setoputro , R. 2005 . Optimal return policy and modular design for build‐to‐order products. . Journal of Operations Management , 23 (5) : 496 – 506 .
  • Murthy , D. N. P. and Djamaludin , I. 2002 . New product warranty: a literature review. . International Journal of Production Economics , 79 : 231 – 260 .
  • Nagel , C. and Meyer , P. 1999 . Caught between ecology and economy: end‐of‐life aspects of environmentally conscious manufacturing. . Computers & Industrial Engineering , 36 (4) : 781 – 792 .
  • Nagurney , A. and Toyasaki , F. 2005 . Reverse supply chain management and electronic waste recycling: a multitiered network equilibrium framework for e‐cycling. . Transportation Research Part E: Logistics and Transportation Review , 41 (1) : 1 – 28 .
  • Nahmias , N. and Rivera , H. 1979 . A deterministic model for repairable item inventory system with a finite repair rate. . International Journal of Production Research , 17 : 215 – 221 .
  • Pagell , M. , Wu , Z. and Murthy , N. N. 2007 . The supply chain implications of recycling. . Business Horizons , 50 : 133 – 143 .
  • Palmer , K. , Sigman , H. and Walls , M. 1997 . The cost of reducing municipal solid waste. . Journal of Environmental Economics and Management , 33 : 128 – 150 .
  • Palmer , K. and Walls , M. 1997 . Optimal policies for solid waste disposal: taxes, subsidies and standards. . Journal of Public Economics , 65 : 193 – 205 .
  • Pan , L. and Zeid , I. 2001 . A knowledge base for indexing and retrieving disassembly plans. . Journal of Intelligent Manufacturing , 12 (1) : 77 – 94 .
  • Panisset , B. D. 1988 . MRP II for repair/refurbish industries. . Production and Inventory Management Journal , 29 (4) : 12 – 15 .
  • Pati , R. K. , Vrat , P. and Kumar , P. 2006 . Economic analysis of paper recycling vis‐à‐vis wood as raw material. . International Journal of Production Economics , 103 : 489 – 508 .
  • Pati , R. K. , Vrat , P. and Kumar , P. 2008 . A goal programming model for paper recycling system. . Omega , 36 (3) : 405 – 417 .
  • Peirce , J. J. and Davidson , G. M. 1982 . Linear programming in hazardous waste management. . Journal of Environmental Engineering , 108 (5) : 1014 – 1026 .
  • Penev , K. D. and de Ron , A. J. 1996 . Determination of a disassembly strategy. . International Journal of Production Research , 34 (2) : 495 – 506 .
  • Pochampally , K. K. and Gupta , S. M. 2003 . “ A Multi‐Phase mathematical Programming Approach to Strategic Planning of an Efficient Reverse Supply Chain Network. ” . 72 – 78 . Proceedings of the IEEE International Symposium on the Electronics and the Environment, IEEE Press, Boston, MA
  • Pohlen , T. L. and Farris , M. T. 1992 . Reverse logistics in plastics recycling. . International Journal of Physical Distribution and Logistics Management , 22 (7) : 35 – 47 .
  • Pugh , M. P. 1993 . The use of mathematical models in evaluating resource recovery options. . Resources, Conservation & Recycling , 8 : 91 – 101 .
  • Raymond , M. 2001 . “ Recycling policies and evaluations. ” . In The McGraw‐Hill recycling handbook , Edited by: Lund , H . New York, NY : McGraw‐Hill . 2nd ed., Chapter 2
  • Realff , M. J. , Ammons , J. C. and Newton , D. J. 2004 . Robust reverse production system design for carpet recycling. . IIE Transactions , 36 (8) : 767 – 776 .
  • ReVelle , C. , Cohen , J. and Shobrys , D. 1991 . Simultaneous siting and routing in the disposal of hazardous wastes. . Transportation Science , 25 (2) : 138 – 145 .
  • Richter , K. 1996a . The EOQ repair and waste disposal model with variable setup numbers. . European Journal of Operational Research , 96 : 313 – 324 .
  • Richter , K. 1996b . The extended EOQ repair and waste disposal model. . International Journal of Production Economics , 45 (1–3) : 443 – 448 .
  • Richter , K. 1997 . Pure and mixed strategies for the EOQ repair and waste disposal problem. . OR Spectrum , 19 : 123 – 129 .
  • Richter , K. and Dobos , I. 1999 . Analysis of the EOQ repair and waste disposal problem with integer setup numbers. . International Journal of Production Economics , 59 : 463 – 467 .
  • Richter , K. and Sombrutzki , M. 2000 . Remanufacturing planning for the reverse Wagner–Whitin models. . European Journal of Operational Research , 121 : 304 – 315 .
  • Richter , K. and Weber , J. 2001 . The reverse Wagner–Whitin model with variable manufacturing and remanufacturing cost. . International Journal of Production Economics , 71 : 447 – 456 .
  • Ritchie , L. 2000 . The benefits of reverse logistics: the case of the Manchester Royal Infirmary Pharmacy. . Supply Chain Management: An International Journal , 5 : 226 – 233 .
  • Robotis , A. , Bhattacharya , S. and Van Wassenhove , L. N. 2005 . The effect of remanufacturing on procurement decisions for resellers in secondary markets. . European Journal of Operational Research , 163 (3) : 688 – 705 .
  • Savaskan , R. C. and Van Wassenhove , L. N. 2006 . Reverse channel design: the case of competing retailers. . Management Science , 52 (1) : 1 – 14 .
  • Schrady , D. A. 1967 . A deterministic inventory model for repairable items. . Naval Research Logistic Quarterly , 14 : 391 – 398 .
  • Seitz , M. A. 2007 . A critical assessment of motives for product recovery: the case of engine remanufacturing. . Journal of Cleaner Production , 15 (11) : 1147 – 1157 .
  • Sharma , M. , Ammons , J. C. and Hartman , J. C. 2007 . Asset management with reverse product flows and environmental considerations. . Computers and Operations Research , 34 (2) : 464 – 486 .
  • Sheu , J. B. 2007 . A coordinated reverse logistics system for regional management of multi‐source hazardous wastes. . Computers and Operations Research , 34 (5) : 1442 – 1462 .
  • Sheu , J. B. 2008 . Green supply chain management, reverse logistics and nuclear power generation. . Transportation Research Part E: Logistics and Transportation Review , 44 (1) : 19 – 46 .
  • Sheu , J. B. , Chou , Y. H. and Hu , C. C. 2005 . An integrated logistics operational model for green‐supply chain management. . Transportation Research Part E: Logistics and Transportation Review , 41 (4) : 287 – 313 .
  • Shih , L. 2001 . Reverse logistics system planning for recycling electrical appliances and computers in Taiwan. . Resources, Conservation and Recycling , 32 (1) : 55 – 72 .
  • Simpson , V. P. 1978 . Optimal solution structure for a repairable inventory problem. . Operations Research , 26 (2) : 270 – 281 .
  • Singer , M. , Donoso , P. and Traverso , P. 2003 . Quality strategies in supply chain alliances of disposable items. . Omega , 31 : 499 – 509 .
  • Souza , G. C. and Ketzenberg , M. E. 2002 . Two‐stage make‐to‐order remanufacturing with service‐level constraints. . International Journal of Production Research , 40 (2) : 477 – 493 .
  • Spengler , T. 1997 . Environmental integrated production and recycling management. . European Journal of Operational Research , 97 : 308 – 326 .
  • Srivastava , S. K. 2007 . Green supply‐chain management: a state‐of‐the‐art literature review. . International Journal of Management Reviews , 9 (1) : 53 – 80 .
  • Sundin , E. and Bras , B. 2005 . Making functional sales environmentally and economically beneficial through product remanufacturing. . Journal of Cleaner Production , 13 : 913 – 925 .
  • Sunthonpagasit , N. and Duffey , M. R. 2004 . Scrap tires to crumb rubber: feasibility analysis for processing facilities. . Resources, Conservation and Recycling , 40 : 281 – 299 .
  • Taleb , K. N. and Gupta , S. M. 1997 . Disassembly of multiple product structures. . Computers and Industrial Engineering , 32 : 949 – 961 .
  • Taleb , K. N. , Gupta , S. M. and Brennan , L. 1997 . Disassembly of complex product structures with parts and materials commonality. . Production, Planning and Control , 8 (3) : 225 – 269 .
  • Tang , Y. , Zhou , M. C. and Caudill , R. 2001 . An integrated approach to disassembly planning and demanufacturing operation. . IEEE Transactions on Robotics and Automation , 17 (6) : 773 – 784 .
  • Tang , O. , Grubbström , R. W. and Zanoni , S. 2007 . Planned lead time determination in a make‐to‐order remanufacturing system. . International Journal of Production Economics , 108 : 426 – 435 .
  • Teunter , R. H. , Bayindir , Z. P. and Heuvel , W. V. D. 2006 . Dynamic lot sizing with product returns and remanufacturing. . International Journal of Production Research , 44 (20) : 4377 – 4400 .
  • Teunter , R. H. and Van der Laan , E. 2002 . On the non‐optimality of the average cost approach for inventory models with remanufacturing. . International Journal of Production Economics , 79 (1) : 67 – 73 .
  • Teunter , R. H. , Van der Laan , E. and Inderfurth , K. 2000 . How to set the holding cost rates in average cost inventory models with reverse logistics? . Omega , 28 (4) : 409 – 415 .
  • Teunter , R. H. and Vlachos , D. 2002 . On the necessity of a disposal option for returned items that can be remanufactured. . International Journal of Production Economics , 75 : 257 – 266 .
  • Thierry , M. , Salomon , M. , Van Nunen , J. and Van Wassenhove , L. 1995 . Strategic issues in product recovery management. . California Management Review , 37 (2) : 114 – 135 .
  • Toktay , L. B. , Wein , L. M. and Zenios , S. A. 2000 . Inventory management of remanufacturable products. . Management Science , 46 (11) : 1412 – 1426 .
  • Torre , P. L. G. , Adenso‐Diaz , B. and Artiba , H. 2004 . Environmental and reverse logistics policies in European bottling and packaging firms. . International Journal of Production Economics , 88 : 95 – 104 .
  • Torres , F. 2004 . Automatic PC disassembly for component recovery. . International Journal of Advanced Manufacturing Technology , 23 (1–2) : 39 – 46 .
  • Tsoulfas , G. T. , Pappis , C. T. and Minner , S. 2002 . An environmental analysis of the reverse supply chain of SLI batteries. . Resources, Conservation and Recycling , 36 (2) : 135 – 154 .
  • Van der Laan , E. , Dekker , R. and Salomon , M. 1996a . Product remanufacturing and disposal: a numerical comparison of alternative control strategies. . International Journal of Production Economics , 45 : 489 – 498 .
  • Van der Laan , E. 1996b . An (s,Q) inventory model with remanufacturing and disposal. . International Journal of Production Economics , 46–47 : 339 – 350 .
  • Van der Laan , E. and Salomon , M. 1997 . Production planning and inventory control with remanufacturing and disposal. . European Journal of Operational Research , 102 : 264 – 278 .
  • Van der Laan , E. , Salomon , M. and Dekker , R. 1999a . An investigation of lead‐time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies. . European Journal of Operational Research , 115 : 195 – 214 .
  • Van der Laan , E. 1999b . Inventory control in hybrid systems with remanufacturing. . Management Science , 45 (5) : 733 – 743 .
  • Van Hoek , R. I. 1999 . From reversed logistics to green supply chains. . Supply Chain Management , 4 (3) : 129 – 135 .
  • Veerakamolmal , P. and Gupta , S. M. 1998 . Optimal analysis of lot‐size balancing for multi products selective disassembly. . International Journal of Flexible Automation and Integrated Manufacturing , 8 (3–4) : 245 – 269 .
  • Veerakamolmal , P. and Gupta , S. M. 1999 . Analysis of design efficiency for the disassembly of modular electronic products. . Journal of Electronics Manufacturing , 9 (1) : 79 – 95 .
  • Veerakamolmal , P. and Gupta , S. M. 2002 . A case‐based reasoning approach for automating disassembly process planning. . Journal of Intelligent Manufacturing , 13 (1) : 47 – 60 .
  • Viswanathan , S. and Allada , V. 1999 . A framework for the flexible grouping of products for disassembly. . Journal of Electronics Manufacturing , 9 (1) : 53 – 66 .
  • Vlachos , D. and Dekker , R. 2003 . Return handling options and order quantities for single period products. . European Journal of Operational Research , 151 (1) : 38 – 52 .
  • Vlachos , D. , Georgiadis , P. and Iakovou , E. 2007 . A system dynamics model for dynamic capacity planning of remanufacturing in closed‐loop supply chains. . Computers & Operations Research , 34 : 367 – 394 .
  • Vlachos , D. and Tagaras , G. 2001 . An inventory system with two supply modes and capacity constraints. . International Journal of Production Economics , 72 (1) : 41 – 58 .
  • Wang , Z. , Yao , D. Q. and Huang , P. 2007 . A new location‐inventory policy with reverse logistics applied to B2C e‐markets of China. . International Journal of Production Economics , 107 (2) : 350 – 363 .
  • Webster , S. and Mitra , S. 2007 . Competitive strategy in remanufacturing and the impact of take‐back laws. . Journal of Operations Management , 25 : 1123 – 1140 .
  • Wendy , K. and Chris , R. 2001 . Eco‐efficiency gains from remanufacturing, a case study of photocopier remanufacturing at Fuji Xerox Australia. . Journal of Cleaner Production , 9 : 75 – 81 .
  • Williams , J. A. S. 2006 . A review of electronics demanufacturing processes. . Resources, Conservation and Recycling , 47 : 195 – 208 .
  • Wojanowski , R. , Verter , V. and Boyaci , T. 2007 . Retail–collection network design under deposit–refund. . Computers & Operations Research , 34 (2) : 324 – 345 .
  • Wright , E. 2005 . Improving recyclability by design: a case study of fibre optic cable. . Resources, Conservation and Recycling , 44 (1) : 37 – 50 .
  • Zeid , I. , Gupta , S. M. and Bardasz , T. 1997 . A case‐based reasoning approach to planning for disassembly. . Journal of Intelligent Manufacturing , 8 : 97 – 106 .
  • Zhu , Q. and Sarkis , J. 2004 . Relationships between operational practices and performance among early adopters of green supply chain management practices in Chinese manufacturing enterprises. . Journal of Operations Management , 22 : 265 – 289 .
  • Zikopoulos , C. and Tagaras , G. 2007 . Impact of uncertainty in the quality of returns on the profitability of a single‐period refurbishing operation. . European Journal of Operational Research , 182 (1) : 205 – 225 .
  • Zografos , K. G. and Samara , S. S. A. 1990 . Combined location‐routing model for hazardous waste transportation and disposal. . Transportation Research Record , 1245 : 52 – 59 .

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.