References
- Annadurai, K., and R. Uthayakumar. 2010. “Reducing Lost-sales Rate in (T, R, L) Inventory Model with Controllable Lead Time.” Applied Mathematical Modelling 34: 3465–3477. doi:https://doi.org/10.1016/j.apm.2010.02.035.
- Ben-Daya, M. A., and A. Raouf. 1994. “Inventory Models Involving Lead Time as a Decision Variable.” Journal of the Operational Research Society 45 (5): 579–582. doi:https://doi.org/10.1057/jors.1994.85.
- Chen, C. K., H. C. Chang, and L. Y. Ouyang. 2001. “A Continuous Review Inventory Model with Ordering Cost Dependent on Lead Time.” International Journal of Information and Management Sciences 12: 1–13.
- Fossati, J. P., A. Galarza, A. Martín-Villate, and L. Fontan. 2015. “A Method for Optimal Sizing Energy Storage Systems for Microgrids.” Renewable Energy 77: 539–549. doi:https://doi.org/10.1016/j.renene.2014.12.039.
- Gallego, G., and I. Moon. 1993. “The Distribution Free Newsboy Problem: Review and Extensions.” Journal of the Operational Research Society 44 (8): 825–834. doi:https://doi.org/10.1057/jors.1993.141.
- Goyal, S. K. 1988. “A Joint Economic-lot-size Model for Purchaser and Vendor: A Comment.” Decision Sciences 19 (1): 236–241. doi:https://doi.org/10.1111/j.1540-5915.1988.tb00264.x.
- Goyal, S. K. 1995. “A One-vendor Multi-buyer Integrated Inventory Model: A Comment.” European Journal of Operational Research 82 (1): 209–210. doi:https://doi.org/10.1016/0377-2217(93)E0357-4.
- Goyal, S. K., and F. Nebebe. 2000. “Determination of Economic Production-shipment Policy for a Single-vendor-single-buyer System.” European Journal of Operational Research 121 (1): 175–178. doi:https://doi.org/10.1016/S0377-2217(99)00013-2.
- Hill, R. M. 1997. “The Single-vendor Single-buyer Integrated Production-inventory Model with a Generalized Policy.” European Journal of Operational Research 97 (3): 493–499. doi:https://doi.org/10.1016/S0377-2217(96)00267-6.
- Hoque, M. A., and S. K. Goyal. 2006. “A Heuristic Solution Procedure for an Integrated Inventory System under Controllable Lead-time with Equal or Unequal Sized Batch Shipments between A Vendor and A Buyer.” International Journal of Production Economics 102 (2): 217–225. doi:https://doi.org/10.1016/j.ijpe.2005.02.012.
- Liao, C. J., and C. H. Shyu. 1991. “An Analytical Determination of Lead Time with Normal Demand.” International Journal of Operations & Production Management 11 (9): 72–78. doi:https://doi.org/10.1108/EUM0000000001287.
- Luo, X., J. Wang, M. Dooner, and J. Clarke. 2015. “Overview of Current Development in Electrical Energy Storage Technologies and the Application Potential in Power System Operation.” Applied Energy 137: 511–536. doi:https://doi.org/10.1016/j.apenergy.2014.09.081.
- Ouedraogo, N. S. 2017. “Modeling Sustainable Long-term Electricity Supply-demand in Africa.” Applied Energy 190: 1047–1067. doi:https://doi.org/10.1016/j.apenergy.2016.12.162.
- Ouyang, L. Y., N. C. Yeh, and K. S. Wu. 1996. “Mixture Inventory Model with Backorders and Lost Sales for Variable Lead Time.” Journal of the Operational Research Society 47 (6): 829–832. doi:https://doi.org/10.1057/jors.1996.102.
- Pan, J. C. H., and J. S. Yang. 2002. “A Study of an Integrated Inventory with Controllable Lead Time.” International Journal of Production Research 40 (5): 1263–1273. doi:https://doi.org/10.1080/00207540110105680.
- Pandey, A., M. Masin, and V. Prabhu. 2007. “Adaptive Logistic Controller for Integrated Design of Distributed Supply Chains.” Journal of Manufacturing Systems 26 (2): 108–115. doi:https://doi.org/10.1016/j.jmsy.2007.11.001.
- Sarkar, B., R. Guchhait, M. Sarkar, S. Pareek, and N. Kim. 2019. “Impact of Safety Factors and Setup Time Reduction in a Two-echelon Supply Chain Management.” Robotics and Computer-Integrated Manufacturing 55: 250–258. doi:https://doi.org/10.1016/j.rcim.2018.05.001.
- Schneider, M., K. Biel, S. Pfaller, H. Schaede, H., . S. Rinderknecht, and C. H. Glock. 2016. “Using Inventory Models for Sizing Energy Storage Systems: An Interdisciplinary Approach.” Journal of Energy Storage 8: 339–348. doi:https://doi.org/10.1016/j.est.2016.02.009.
- Schneidera, M., K. Bielb, S. Pfallera, S., . H. Schaedea, S. Rinderknechta, and C. H. Glock. 2015. “Optimal Sizing of Electrical Energy Storage Systems Using Inventory Models.” Energy Procedia 73: 48–58. doi:https://doi.org/10.1016/j.egypro.2015.07.559.
- Taylor, J. A., J. L. Mathieu, D. S. Callaway, and K. Poolla. 2017. “Price and Capacity Competition in Balancing Markets with Energy Storage.” Energy Systems 8 (1): 169–197. doi:https://doi.org/10.1007/s12667-016-0193-9.
- Teng, J. T., L. E. Cárdenas-Barrón, and L. R. Lou. 2011. “The Economic Lot Size of the Integrated Vendor-buyer Inventory System Derived without Derivatives: A Simple Derivation.” Applied Mathematics and Computation 217 (12): 5972–5977. doi:https://doi.org/10.1016/j.amc.2010.12.018.
- Tsou, C. S., H. H. Fang, H. C. Lo, and C. H. Huang. 2009. “A Study of Cooperative Advertising in A Manufacturer-retailer Supply Chain.” International Journal of Information and Management Sciences 20 (1): 15–26.
- Uthayakumar, R., and M. Rameswari. 2012. “An Integrated Inventory Model for a Single Vendor and Single Buyer with Order-processing Cost Reduction and Process Mean.” International Journal of Production Research 50 (11): 2910–2924. doi:https://doi.org/10.1080/00207543.2011.575893.
- Wangsa, I., T. Yang, and H. Wee. 2018. “The Effect of Price-Dependent Demand on the Sustainable Electrical Energy Supply Chain.” Energies 11 (7): 16–45. doi:https://doi.org/10.3390/en11071645.
- Wangsa, I. D., and H. M. Wee. 2018. “The Economical Modeling of a Distribution System for Electricity Supply Chain.” Energy Systems 1–21.
- Wu, A., A. Philpott, and G. Zakeri. 2017. “Investment and Generation Optimization in Electricity Systems with Intermittent Supply.” Energy Systems 8 (1): 127–147. doi:https://doi.org/10.1007/s12667-016-0210-z.