References
- Adinoyi, M. J., and S. A. M. Said. 2013. “Effect of Dust Accumulation on the Power Outputs of Solar Photovoltaic Modules.” Renewable Energy 60: 633–636. doi:https://doi.org/10.1016/j.renene.2013.06.014.
- Akinyele, D. O., R. K. Rayudu, and N. K. C. Nair. 2015. “Global Progress in Photovoltaic Technologies and the Scenario of Development of Solar Panel Plant and Module Performance Estimation − Application in Nigeria.” Renewable and Sustainable Energy Reviews 48: 112–139. doi:https://doi.org/10.1016/j.rser.2015.03.021.
- Al-Otaibi, A., A. Al-Qattan, F. Fairouz, and A. Al-Mulla. 2015. “Performance Evaluation of Photovoltaic Systems on Kuwaiti Schools’ Rooftop.” Energy Conversion and Management 95: 110–119. doi:https://doi.org/10.1016/j.enconman.2015.02.039.
- Caceres, M., A. Busso, L. Vera, and A. Firman. 2017. “PRIMER SISTEMA FOTOVOLTAICO CONECTADO A LA RED DE BAJA TENSIÓN DEL NORTE ARGENTINO: CARACTERIZACIÓN Y ANALISIS.” DYNAES 6 (1): [13 p.]-[13 p.]. doi:https://doi.org/10.6036/ES8151.
- Catelani, M., L. Ciani, L. Cristaldi, M. Faifer, M. Lazzaroni, and M. Rossi. n.d. Characterization of Photovoltaic Panels: The Effects of Dust, 6. 2nd IEEE ENERGYCON Conference & Exhibition, 2012 at Florence, Italy / Advances in Energy Conversion Symp.
- Centrale Solaire de Sourdun [WWW Document]. n.d. URL. ( accessed 8 2 21). https://www.construction21.org/france/infrastructure/h/centrale-solaire-de-sourdun.html
- Chokmaviroj, S., R. Wattanapong, and Y. Suchart. 2006. “Performance of a 500kWP Grid Connected Photovoltaic System at Mae Hong Son Province, Thailand.” Renewable Energy 31 (1): 19–28. doi:https://doi.org/10.1016/j.renene.2005.03.004.
- Daher, D. H., L. Gaillard, M. Amara, B. Lips, and C. Ménézo 2014. Suivi expérimental des performances d’une centrale solaire photovoltaïque à Djibouti. In: 3ième Colloque International Francophone d’Energétique et Mécanique Les Énergies Renouvelables et La Mécanique Appliquée à l’industrie, p. ART-17. Moroni, The Comoros Islands.
- Daher, D. H., L. Gaillard, M. Amara, and C. Ménézo. 2018. “Impact of Tropical Desert Maritime Climate on the Performance of a PV Grid-connected Power Plant.” Renewable Energy 125: 729–737. doi:https://doi.org/10.1016/j.renene.2018.03.013.
- De Lima, L. C., L. de Araújo Ferreira, and F. H. B. de Lima Morais. 2017. “Performance Analysis of a Grid Connected Photovoltaic System in Northeastern Brazil.” Energy for Sustainable Development 37: 79–85. doi:https://doi.org/10.1016/j.esd.2017.01.004.
- Dierauf, T., A. Growitz, S. Kurtz, J. L. B. Cruz, E. Riley, and C. Hansen. 2013. “Weather-Corrected Performance Ratio.” Technical report published by the NREL (NREL/TP–5200–57991): 1078057. doi:https://doi.org/10.2172/1078057.
- El Hacen Jed, M., R. Ihaddadene, N. Ihaddadene, S. Elhadji, C. Elb, and M. EL Bah. 2020. “Performance Analysis of 954,809 kWp PV Array of Sheikh Zayed Solar Power Plant (Nouakchott, Mauritania).” Renewable Energy Focus 32: 45–54. doi:https://doi.org/10.1016/j.ref.2019.11.002.
- Ghiani, E., F. Pilo, and S. Cossu. 2013. “Evaluation of Photovoltaic Installations Performances in Sardinia.” Energy Conversion and Management 76: 1134–1142. doi:https://doi.org/10.1016/j.enconman.2013.09.012.
- Guo, B., W. Javed, B. W. Figgis, and T. Mirza 2015. Effect of Dust and Weather Conditions on Photovoltaic Performance in Doha, Qatar. In: 2015 First Workshop on Smart Grid and Renewable Energy (SGRE). Presented at the 2015 First Workshop on Smart Grid and Renewable Energy (SGRE), Doha, Qatar: IEEE, pp. 1–6. https://doi.org/https://doi.org/10.1109/SGRE.2015.7208718.
- How to calculate PV performance ratio and performance index | Hukseflux [WWW Document]. n.d. URL. ( accessed 30 7 21). https://www.hukseflux.com/applications/solar-energy-pv-system-performance-monitoring/how-to-calculate-pv-performance-ratio
- Ibrahim, H., and N. Anani. 2017. “Variations of PV Module Parameters with Irradiance and Temperature.” Energy Procedia 134: 276–285. doi:https://doi.org/10.1016/j.egypro.2017.09.617.
- IEC61724-1:2017. Photovoltaic System Performance—Part 1: Monitoring. International Electrotechnical Commission, 2017. iTeh Standards [WWW Document], n.d. URL. ( accessed 20 10 20). https://standards.iteh.ai/catalog/standards/sist/f8b04729-0bcc-498e-9541-57bc6463944f/sist-en-61724-2001.
- Jahn, U. n.d. Performance of 170 Grid Connected Pv Plants in Northern Germany–analysis of Yields and Optimization Potentials, 7. Great Britain: Solar Energy Elsevier Science Ltd.
- Kazem, H. A., T. Khatib, K. Sopian, and W. Elmenreich. 2014. “Performance and Feasibility Assessment of a 1.4kW Roof Top Grid-connected Photovoltaic Power System under Desertic Weather Conditions.” Energy and Buildings 82: 123–129. doi:https://doi.org/10.1016/j.enbuild.2014.06.048.
- Khalid, A. M., I. Mitra, W. Warmuth, and V. Schacht. 2016. “Performance Ratio – Crucial Parameter for Grid Connected PV Plants.” Renewable and Sustainable Energy Reviews 65: 1139–1158. doi:https://doi.org/10.1016/j.rser.2016.07.066.
- Köppen climate classification. 2020. Wikipedia.
- Kunaifi, K., A. Reinders, D. Kaharudin, A. Harmanto, and K. Mudiarto. 2019. “A Comparative Performance Analysis of A 1 MW CIS PV System and A 5 kW Crystalline-Si PV System under the Tropical Climate of Indonesia.” IJTech 10 (6): 1082. doi:https://doi.org/10.14716/ijtech.v10i6.3612.
- Kymakis, E., S. Kalykakis, and T. M. Papazoglou. 2009. “Performance Analysis of a Grid Connected Photovoltaic Park on the Island of Crete.” Energy Conversion and Management 50 (3): 433–438. doi:https://doi.org/10.1016/j.enconman.2008.12.009.
- Leloux, J., L. Narvarte Fernández, and D. Trebosc. 2011. Performance Analysis of 10,000 Residential PV Systems in France and Belgium. 26th European Photovoltaic Solar Energy Conference and Exhibition at Hamburg.
- Leloux, J., L. Narvarte, and D. Trebosc. 2012. “Review of the Performance of Residential PV Systems in Belgium.” Renewable and Sustainable Energy Reviews 16 (1): 178–184. doi:https://doi.org/10.1016/j.rser.2011.07.145.
- Malvoni, M., N. M. Kumar, S. S. Chopra, and N. Hatziargyriou. 2020. “Performance and Degradation Assessment of Large-scale Grid-connected Solar Photovoltaic Power Plant in Tropical Semi-arid Environment of India.” Solar Energy 203: 101–113. doi:https://doi.org/10.1016/j.solener.2020.04.011.
- Martín-Martínez, S., M. Cañas-Carretón, A. Honrubia-Escribano, and E. Gómez-Lázaro. 2019. “Performance Evaluation of Large Solar Photovoltaic Power Plants in Spain.” Energy Conversion and Management 183: 515–528. doi:https://doi.org/10.1016/j.enconman.2018.12.116.
- Micheli, D., S. Alessandrini, R. Radu, and I. Casula. 2014. “Analysis of the Outdoor Performance and Efficiency of Two Grid Connected Photovoltaic Systems in Northern Italy.” Energy Conversion and Management 80: 436–445. doi:https://doi.org/10.1016/j.enconman.2014.01.053.
- Mondol, J. D., Y. Yohanis, M. Smyth, and B. Norton. 2006. “Long Term Performance Analysis of a Grid Connected Photovoltaic System in Northern Ireland.” Energy Conversion and Management 47 (18–19): 2925–2947. doi:https://doi.org/10.1016/j.enconman.2006.03.026.
- Mpholo, M., T. Nchaba, and M. Monese. 2015. “Yield and Performance Analysis of the First Grid-connected Solar Farm at Moshoeshoe I International Airport, Lesotho.” Renewable Energy 81: 845–852. doi:https://doi.org/10.1016/j.renene.2015.04.001.
- Necaibia, A., A. Bouraiou, A. Ziane, N. Sahouane, S. Hassani, M. Mostefaoui, R. Dabou, and S. Mouhadjer. 2018. “Analytical Assessment of the Outdoor Performance and Efficiency of Grid-tied Photovoltaic System under Hot Dry Climate in the South of Algeria.” Energy Conversion and Management 171: 778–786. doi:https://doi.org/10.1016/j.enconman.2018.06.020.
- Palmero-Marrero, A., J. C. Matos, and A. C. Oliveira. 2015. “Comparison of Software Prediction and Measured Performance of a Grid-connected Photovoltaic Power Plant.” Journal of Renewable and Sustainable Energy 7 (6): 063102. doi:https://doi.org/10.1063/1.4935376.
- Panorama du parc photovoltaïque français : Où en est la filière solaire ?. 2019. Lendopolis - Blog officiel de Lendopolis. URL. ( accessed 20 10 20). https://blog.lendopolis.com/energies-renouvelables/panorama-parc-photovoltaique/.
- Paredes-Parra, J., A. Mateo-Aroca, G. Silvente-Niñirola, M. Bueso, and Á. Molina-García. 2018. “PV Module Monitoring System Based on Low-Cost Solutions: Wireless Raspberry Application and Assessment.” Energies 11 (11): 3051. doi:https://doi.org/10.3390/en11113051.
- Piao, Z.-G., B.-I. Jung, Y.-O. Choi, and G.-B. Cho 2009. Performance Assessment of 3kW Grid-connected PV Systems in Korea. In: INTELEC 2009-31st International Telecommunications Energy Conference. Presented at the INTELEC 2009–2009 International Telecommunications Energy Conference, Incheon, South Korea: IEEE, pp. 1–5. https://doi.org/https://doi.org/10.1109/INTLEC.2009.5351953
- Pietruszko, S. M., and M. Gradzki. 2003. “Performance of a Grid Connected Small PV System in Poland.” Applied Energy 74 (1–2): 177–184. doi:https://doi.org/10.1016/S0306-2619(02)00144-7.
- Power 2 [WWW Document]. n.d. URL. ( accessed 20 6 19). https://www.iea.org/renewables2018/power/.
- Quansah, D. A., and M. S. Adaramola. 2019. “Assessment of Early Degradation and Performance Loss in Five Co-located Solar Photovoltaic Module Technologies Installed in Ghana Using Performance Ratio Time-series Regression.” Renewable Energy 131: 900–910. doi:https://doi.org/10.1016/j.renene.2018.07.117.
- Renewables 2018 1 [WWW Document]. n.d. URL. ( accessed 20 6 19). https://www.iea.org/renewables2018/.
- Sayyah, A., M. N. Horenstein, and M. K. Mazumder. 2014. “Energy Yield Loss Caused by Dust Deposition on Photovoltaic Panels.” Solar Energy 107: 576–604. doi:https://doi.org/10.1016/j.solener.2014.05.030.
- Solar 3 [WWW Document]. n.d. URL. ( accessed 20 6 19). https://www.iea.org/topics/renewables/solar/.
- Srivastava, R., A. N. Tiwari, and V. K. Giri. 2020. “An Overview on Performance of PV Plants Commissioned at Different Places in the World.” Energy for Sustainable Development 54: 51–59. doi:https://doi.org/10.1016/j.esd.2019.10.004.
- Wittkopf, S., S. Valliappan, L. Liu, K. S. Ang, and S. C. J. Cheng. 2012. “Analytical Performance Monitoring of a 142.5kWp Grid-connected Rooftop BIPV System in Singapore.” Renewable Energy 47: 9–20. doi:https://doi.org/10.1016/j.renene.2012.03.034.