References
- Airbus. (2012, March). Airbus S.A.S. Manual Technology Readiness Level Methodology for Maturity-Driven Management of R&T Programme. Report no. M7018.
- Conte, S. D., Dunsmore, H. E., & Shen, V. Y. (1986). Software Engineering Metrics and Models. San Francisco, CA: Benjamin-Cummings Publishing Co., Inc.
- Curran, R., Raghunathan, S., & Price, M. (2004). Review of Aerospace Engineering Cost Modelling: The Genetic Causal Approach. Progress in Aerospace Sciences, 40(8),487–534.
- DePasquale, D., & Charania, A. C. (2008, September 9–11). I-RaCM: A Fully Integrated Risk and Life Cycle Cost Model. In AIAA Space 2008 Conference & Exposition, San Diego, CA.
- Fischman, L., & Hunt, B. (2006, May 9–11). Determining the Cost of Bringing Technologies to Maturity. In Multi-Dimensional Assessment of Technology Maturity.
- Griffiths, W. E., Carter Hill, R., & Judge, G. G. (1993). Learning and Practicing Econometrics. New York, NY: Wiley.
- Kesseler, E. (2006, September). Advancing the State-of-the-Art in the Civil Aircraft Design: A Knowledge-Based Multidisciplinary Engineering Approach. In Proceedings of the European Conference on Computational Fluid Dynamics (ECCOMAS CDF), Egmond aan Zee, The Netherlands.
- Malone, P., Smoker, R., Apgar, H., & Wolfarth, L. (2011, March). The Application of TRL Metrics to Existing Cost Prediction Models. In Aerospace Conference, 2011 IEEE (pp. 1–12), Big Sky, MT.
- NASA. (2010). Definition of Technology Readiness Levels. Retrieved from http://esto.nasa.gov/files/trl_definitions.pdf
- Price Systems. (2010). Continuing Thoughts on TRL. Retrieved from http://blog.pricesystems.com/blog/joe-on-estimating-trends/continuing-thoughts-on-trl
- Rolls Royce Plc. (2009, June). Capability Readiness Levels. A Guide for Partners and Suppliers. Rolls Royce Plc., England.
- Shermon, D. (2009). Systems Cost Engineering: Program Affordability Management and Cost Control. Aldershot, UK: Gower Publishing, Ltd.
- Tan, K. H., Lim, C. P., Platts, K., & Koay, H. S. (2006). An Intelligent Decision Support System for Manufacturing Technology Investments. International Journal of Production Economics, 104(1),179–190.
- Valerdi, R. (2005). The constructive systems engineering cost model (COSYSMO) (Ph.D. dissertation). University of Southern California, Los Angeles, CA.