References
- Almeida-Dias, J., Figueira, J. R., & Roy, B. (2010). Electre Tri-C: A multiple criteria sorting method based on characteristic reference actions. European Journal of Operational Research, 204, 565–580.10.1016/j.ejor.2009.10.018
- Breysse, D. (2009). Maîtrise des risques de projet, Vol. 2: Maîtrise et gestion des risques dans l’aménagement et la construction [Project risk management, Vol. 2: control and management of risks in planning and construction]. Paris: Hermès-Lavoisier.
- Chapman, C. B. (2001). The controlling influences on effective risk identification and assessment for construction design management. International Journal of Project Management, 19, 147–160.10.1016/S0263-7863(99)00070-8
- Ebrahimnejad, S., Mousavi, S. M., & Seyrafianpour, H. (2010). Risk identification and assessment for build–operate–transfer projects: A fuzzy multi attribute decision making model. Expert Systems with Applications, 37, 575–586.10.1016/j.eswa.2009.05.037
- El Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management, 26, 431–438.10.1016/j.ijproman.2007.07.004
- Hamzaoui, F., Allal, M. A., & Megnounif, A. (2011). Management des risques projet dans l’entreprise de travaux publics: cas de la ligne de chemin de fer Mécheria-Béchar [Risk project management in public work companies: Example of the Mecheria-Bechar railway line]. 29ièmes rencontres de l’AUGC, May 29–31, 2011.
- Likert, R. (1932). A technique for the measurement of attitudes. Archives in Psychology, 140, 1–55.
- Mehdizadeh, R. (2012). Dynamic and multi-perspective risk management of construction projects using tailor-made risk breakdown structures (PhD thesis). Bordeaux University.
- Mehdizadeh, R., Breysse, D., & Chaplain, M. (2011). Modeling methodology of the risk breakdown structure for project risk management in construction. Proceedings 11th International Conference on Applications of Statistics and Probability in Civil Engineering, Zurich, 6, 811–818.10.1201/b11332
- Mehdizadeh, R., Breysse, D., Taillandier, F., & Niandou, H. (2013). Dynamic and multi perspective risk management in construction with special view to temporary structures. Journal of Civil Engineering and Environmental Systems, 30, 115–129.
- Mehdizadeh, R., Taillandier, F., Breysse, D., & Niandou, H. (2012). Methodology and tools for risk evaluation in construction projects using Risk Breakdown Structure. European Journal of Environmental and Civil Engineering, 16, 78–98.
- Roy, B., & Bouyssou, D. (1993). Aide multicritère à la décision: Méthodes et cas [Multicriteria decision support: Method ans application cases]. Paris: Economica.
- Saaty, T. L. (1990). How to make a decision: The analytic hierarchy process. European Journal of Operational Research, 48, 9–26.10.1016/0377-2217(90)90057-I
- Yu, W. (1992). Aide multicritère à la décision dans le cadre de la problématique du tri: concepts, méthodes et applications [Multicriteria decision support in sorting problems: Concept, methods and applications] (PhD thesis). Univ. Paris Dauphine, France.