96
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Minimising instability on manufacturing systems after random disruption

, &

References

  • Aytug, H., M. A. Lawley, K. McKay, S. Mohan, and R. Uzsoy. 2005. “Executing production schedules in the face of uncertainties: A review and some future directions.” European Journal of Operational Research 161 (1): 86–110. http://dx.doi.org/10.1016/j.ejor.2003.08.027
  • Azizoglu, M., and O. Alagöz. 2005. “Parallel-machine rescheduling with machine disruptions.” IIE Transactions 37 (12): 1113–1118. http://dx.doi.org/10.1080/07408170500288133
  • Allahverdi, A., C. T. Ng, T. C. E. Cheng, and M. Y. Kovalyov. 2008. “A survey of scheduling problems with setup times or costs.” European Journal of Operational Research 187 (3): 985–1032. http://dx.doi.org/10.1016/j.ejor.2006.06.060
  • Bean, J. C., J. R. Birge, J. Mittenthal, and C. E. Noon. 1991. “Matchup scheduling with multiple resources, release dates and disruptions.” Operations Research 39 (3): 470–483. http://dx.doi.org/10.1287/opre.39.3.470
  • Curry, J. and B. Peters. 2005. “Rescheduling parallel machines with stepwise increasing tardiness and machine assignment stability objectives.” International Journal of Production Research 43 (15): 3231–3246
  • Dutta, A., P. Leitao, and F. Restivo. 2007. “A holonic approach to dynamic manufacturing scheduling.” Robotic and Computer Manufacturing 24: 625–634.
  • Dutta, A. 1990. “Reacting to scheduling exceptions in FMS environments.” IIE Transactions 22 (4): 300–314. http://dx.doi.org/10.1080/07408179008964185
  • Halsall, D. N., A. P. Muhlemann, and D. H. Price. 1994. “A Review of Production Planning and Scheduling in Smaller Manufacturing Companies in the UK.” Production Planning and Control 5 (5): 485–93. http://dx.doi.org/10.1080/09537289408919520
  • Halsall, H., G. E. Vieira, J. W. Herrmann, and E. Lin. 2003. “Rescheduling manufacturing systems: A framework of strategies, policies, and methods.” Journal of Scheduling, 6 (1): 39–62
  • Herrmann, J. W., and B. Peters. 2006. “Information flow and decision-making in production scheduling,” 2006 Industrial Engineering Research Conference, 15–19 May, Houston, Texas.
  • Jain, A.K. and H. A. Elmaraghy. 2007. Production scheduling/rescheduling in flexible manufacturing. International Journal of Production Research 35, 281–309
  • Jain, A. K. and H. A. Elmaraghy. 2003. “Rescheduling manufacturing systems: A framework of strategies, policies, and methods.” Journal of Scheduling 6 (1): 39–62
  • Lin, C. Y., and G. Chang. 2001. “Two machine scheduling under disruptions with transportation considerations.” Journal of Scheduling 8 (1): 31–34.
  • Li, Z., and M. Ierapetritou. 2008. “Process scheduling under uncertainty: Review and challenges.” Computers & Chemical Engineering 32 (4–5): 715–727. http://dx.doi.org/10.1016/j.compchemeng.2007.03.001
  • Lee, C. Y., J. Y. T. Leung, and G. Yu. 2006. “Two machine scheduling under disruptions with transportation considerations.” Journal of Scheduling 9 (1): 35–48. http://dx.doi.org/10.1007/s10951-006-5592-7
  • Mehta, S. V., and R. Uzsoy. 1999. “Predictive scheduling of a single machine subject to breakdowns.” International Journal of Computer Integrated Manufacturing 12 (1): 15–38. http://dx.doi.org/10.1080/095119299130443
  • Muhlemann, A. P., A. G. Lockett, and C. K. Farn. 1982. “Job shop scheduling heuristics and frequency of scheduling.” International Journal of Production Research 20 (3): 227–241
  • Ozlen, M and M. Azizoglu. 2008. Rescheduling unrelated parallel machines with total flow time and total disruption cost. Journal of Operational Research Society 62: 152–164. http://www.jstor.org/stable/40961758 doi: 10.1057/jors.2009.157
  • Pinedo, M. 2008. Scheduling: Theory, algorithms and systems. Upper Saddle River, NJ: Prentice Hall.
  • Pinedo, M., J. C. Bean, J. R. Birge, J. Mittenthal, and C. E. Noon. 2006. “Matchup scheduling with multiple resources, release dates and disruptions.” Operations Research 39 (3): 470–483.
  • Vieira, G. E., J. W. Herrmann, and E. Lin. 2003. “Rescheduling manufacturing systems: A framework of strategies, policies, and methods.” Journal of Scheduling 6 (1): 39–62. http://dx.doi.org/10.1023/A:1022235519958
  • Vieira, G. E., J. W. Herrmann, and E. Lin. 2000. “Predicting the performance of rescheduling strategies for parallel machine systems.” Journal of Manufacturing Systems 19 (4): 256–66. http://dx.doi.org/10.1016/S0278-6125(01)80005-4
  • Vieira, G. E., A. K. Jain, and H. A. Elmaraghy, 2007. Production scheduling/rescheduling in flexible manufacturing. International Journal of Production Research 35: 281–309.
  • Zandieh, M., and M. Gholami. 2012. “An immune algorithm for scheduling a hybrid flow shop with sequence-dependent setup times and machines with random breakdowns.” International Journal of Production Research 47 (24): 6999–7027

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.