510
Views
5
CrossRef citations to date
0
Altmetric
Research Article

An integrated FMEA and MCDA based risk management approach to support life extension of subsea facilities in high-pressure–high-temperature (HPHT) conditions

&
Pages 189-204 | Received 16 Nov 2018, Accepted 15 Aug 2020, Published online: 13 Oct 2020

References

  • Animah I, Shafiee M. 2018. Condition assessment, remaining useful life prediction and life extension decision making for offshore oil and gas assets. J Loss Prev Process Ind. 53:17–28. doi: https://doi.org/10.1016/j.jlp.2017.04.030
  • Animah I, Shafiee M. 2019. Maintenance strategy selection for critical shipboard machinery systems using a hybrid AHP-PROMETHEE and cost benefit analysis: a case study. Journal of Marine Engineering & Technology. doi:https://doi.org/10.1080/20464177.2019.1572705.
  • Animah I, Shafiee M. 2020. Application of risk analysis in the liquefied natural gas (LNG) sector: An overview. J Loss Prev Process Ind. 63, 103980. doi: https://doi.org/10.1016/j.jlp.2019.103980
  • Animah I, Shafiee M, Simms N, Erkoyuncu JA, Maiti J. 2018. Selection of the most suitable life extension strategy for ageing offshore assets using a life-cycle cost-benefit analysis approach. J Qual Maint Eng. 24(3):311–330. doi: https://doi.org/10.1108/JQME-09-2016-0041
  • API 17TR8. 2018. High-pressure high-temperature design guidelines. 2nd ed. Washington, D.C: American Petroleum Institute (API). 110 pages. Available at: https://global.ihs.com.
  • API TR 1PER15K-1. 2013. Protocol for verification and validation of high-pressure high-temperature equipment. American Petroleum Institute (API). 98 pages.
  • Azouz AM. 2010. Innovative subsea cooling reduces numerous failure risks in subsea pipelines. In: International Petroleum Exhibition and Conference, Abu Dhabi, UAE, pp. 1–5.
  • Badri MA. 2001. A combined AHP-GP model for quality control systems. Int J Prod Econ. 72(1):27–40. doi: https://doi.org/10.1016/S0925-5273(00)00077-3
  • Bai Q, Qi X, Brunner MS. 2009. Global buckle control with dual sleepers in HP/HT pipelines. In: Offshore Technology Conference, 4–7 May, Houston, Texas, pp. 1–12.
  • Barrilleaux M, Deegan J, Waligura J, Walker G. 2001. Dynamically positioned completion operations risk analysis. In: Offshore Technology Conference, 30 April–3 May, Houston, Texas, pp. 1–10.
  • Behzadian M, Kazemzadeh RB, Albadvi A, Aghdasi M. 2010. PROMETHEE: A comprehensive literature review on methodologies and applications. Eur J Oper Res. 200(1):198–215. doi: https://doi.org/10.1016/j.ejor.2009.01.021
  • Brans J-P, Vincke P. 1985. Note–A preference ranking organisation method: (The PROMETHEE method for multiple criteria decision-making). Manage Sci. 31(6):647–656. doi: https://doi.org/10.1287/mnsc.31.6.647
  • Bucelli M, Paltrinieri N, Landucci G. 2018. Integrated risk assessment for oil and gas installations in sensitive areas. Ocean Eng. 150:377–390. doi: https://doi.org/10.1016/j.oceaneng.2017.12.035
  • Cai B, Liu Y, Liu Z, Tian X, Zhang Y, Ji R. 2013. Application of Bayesian networks in quantitative risk assessment of subsea blowout preventer operations. Risk Anal. 33(7):1293–1311. doi: https://doi.org/10.1111/j.1539-6924.2012.01918.x
  • Fenton C, Jayson D, Gillies M, Parkin A. 2002. Integrated geohazards evaluation and risk assessment for subsea facilities. In: Offshore Technology Conference, 6–9 May, Houston, Texas. pp. 1–7.
  • Graham GM, Collins IR, Johnson TL. 2005. Technical and economic analysis of the scale risks and uncertainties for subsea deepwater field developments. In: SPE International Symposium on Oilfield Scale, 11–12 May, Aberdeen, United Kingdom, pp. 1–16.
  • Hasle JR, Urban K, Ole H. 2009. Decision on oil and gas exploration in an Arctic area: case study from the Norwegian Barents Sea. Saf Sci. 47(6):832–842. doi: https://doi.org/10.1016/j.ssci.2008.10.019
  • Health and Safety Executive (HSE). 2005. High pressure, high temperature developments in the United Kingdom Continental Shelf. Research Report 409, Prepared by Highoose Limited, Available at: http://www.hse.gov.uk/research/rrpdf/rr409.pdf.
  • Helmer CM, Churcher AC, Mclvor GR, Shields RG. 1994. Arctic offshore development: managing the risk. In: Offshore Technology Conference, 2–5 May, Houston, Texas. pp. 1–12.
  • Henriksson A, Wilhelmsen A, Karlsen T. 2004. Pipelines in harsh environment. In: Offshore Technology Conference, 3–6 May, Houston, Texas. pp. 1–11.
  • Hoiset S, Fossan I, Kaasa O. 2008. Managing explosion risk in arctic areas. In: SPE International Conference on Health, Safety, and Environment in Oil and Gas Exploration and Production, 15–17 April, Nice, France. pp. 1–14.
  • Kabir G, Sadiq R, Tesfamariam S. 2014. A review of multi-criteria decision-making methods for infrastructure management. Struct Infrastruct Eng. 10(9):1176–1210. doi: https://doi.org/10.1080/15732479.2013.795978
  • Kabir G, Sumi RS. 2014. Power substation location selection using fuzzy analytic hierarchy process and PROMETHEE: a case study from Bangladesh. Energy. 72:717–730. doi: https://doi.org/10.1016/j.energy.2014.05.098
  • Kaculi J. 2015. Next generation HPHT subsea wellhead systems design challenges and opportunities. In: Offshore Technology Conference, 4–7 May, Houston, Texas, USA. pp. 1–13.
  • Kornishin K, Efimov YO. 2011. Risks management in Russian offshore geotechnical prospecting (Russian). In: SPE Arctic and Extreme Environments Conference and Exhibition, 18–20 October, Moscow, Russia. pp. 1–5.
  • Lage A, Jacinto C, Martins F, Vanni G, Santos O, Moreiras J. 2006. Blowout contingency and risk-reduction measures for high-rate subsea gas wells in Mexilhao. In: IADC/SPE Drilling Conference, 21–23 February, Miami, Florida, USA. pp. 1–13.
  • Li, C. and Liu, Z.W. (2014). The practice of Shenzhen-Hong Kong subsea gas pipeline risk analysis. In: The Eleventh ISOPE Pacific/Asia Offshore Mechanics Symposium, 12–14 October, Shanghai, China, pp. 90–95.
  • Marhavilas PK, Koulouriotis D, Gemeni V. 2011. Risk analysis and assessment methodologies in the work sites: on a review, classification and comparative study of the scientific literature of the period 2000-2009. J Loss Prev Process Ind. 24:477–523. doi: https://doi.org/10.1016/j.jlp.2011.03.004
  • Markeset T, Moreno-Trejo J, Kumar R. 2009. Maintenance of subsea petroleum production systems: a case study. J Qual Maint Eng. 19(2):128–143. doi: https://doi.org/10.1108/13552511311315940
  • Masi S, Molaschi C, Zausa F, Michelez J. 2011. Managing circulation losses in a harsh drilling environment: conventional solution vs. CHCD through a risk assessment. SPE Drilling & Completion. 26(2):1–10. doi: https://doi.org/10.2118/128225-PA
  • Morgan V, Phillips RD, Randell C, Freeman R. 2008. Mitigation of ice risk to subsea infrastructure. In: Offshore Technology Conference, 5–8 May, Houston, Texas, USA. pp. 1–9.
  • Nikouei MA, Oroujzadeh M, Mehdipour-Ataei S. 2017. The PROMETHEE multiple criteria decision making analysis for selecting the best membrane prepared from sulfonated poly(ether ketone)s and poly(ether sulfone)s for proton exchange membrane fuel cell. Energy. 119:77–85. doi: https://doi.org/10.1016/j.energy.2016.12.052
  • NORSOK. 2010. Standard Z-013, Risk and Emergency Preparedness Analysis, Edition 3, Lysaker, Norway. Available at: https://standards.globalspec.com/std/9966208/z-013.
  • Payne M. 2016. High-pressure/high-temperature challenges. Journal of Petroleum Technology. 64:1.
  • Pires TS, Morais CPM, Freitas RDA, Monteiro ALTO. 2016. Discussion on the life extension of offshore production facilities. In: Rio Oil & Gas Expo and Conference, 24–27 October, Rio de Janeiro, Brazil. pp. 1–10.
  • Rowe G, Wright G. 2001. Expert opinions in forecasting: the role of the Delphi technique. In: Armstrong J.S., editor. Principles of forecasting. New York: Springer; p. 125–144.
  • Saaty TL. 1980. The analytical hierarchy process. New York: McGraw Hill.
  • Saaty TL. 1990. How to make a decision: The analytic hierarchy process. Eur J Oper Res. 48:9–26. doi: https://doi.org/10.1016/0377-2217(90)90057-I
  • Saaty TL. 1996. Decision making with dependence and feedback. Pittsburgh: RWS publications.
  • Sarwar A, Khan F, Abimbola M, James L. 2018. Resilience analysis of a remote offshore oil and gas facility for a potential hydrocarbon release. Risk Anal. 38(8):1601–1617. doi: https://doi.org/10.1111/risa.12974
  • Shadravan A, Amani M. 2012. HPHT 101 - what petroleum engineers and geoscientists should know about high pressure high temperature wells environment. Energy Science and Technology. 4(2):36–60.
  • Shafiee M. 2015. A fuzzy analytic network process model to mitigate the risks associated with offshore wind farms. Expert Syst Appl. 42:2143–2152. doi: https://doi.org/10.1016/j.eswa.2014.10.019
  • Shafiee M, Animah I. 2017. Life extension decision making of safety critical systems: an overview. J Loss Prev Process Ind. 47:174–188. doi: https://doi.org/10.1016/j.jlp.2017.03.008
  • Shafiee M, Animah I, Alkali B, Baglee D. 2019a. Decision support methods and applications in the upstream oil and gas sector. Journal of Petroleum Science and Engineering. 173:1173–1186. doi: https://doi.org/10.1016/j.petrol.2018.10.050
  • Shafiee M, Animah I, Simms N. 2016. Development of a techno-economic framework for life extension decision making of safety critical installations. J Loss Prev Process Ind. 44:299–310. doi: https://doi.org/10.1016/j.jlp.2016.09.013
  • Shafiee M, Dinmohammadi F. 2014. An FMEA-based risk assessment approach for wind turbine systems: A comparative study of onshore and offshore. Energies. 7(2):619–642. doi: https://doi.org/10.3390/en7020619
  • Shafiee M, Enjema E, Kolios A. 2019b. An integrated FTA-FMEA model for risk analysis of engineering systems: a case study of subsea blowout preventers. Applied Sciences. 9(6):1192. doi: https://doi.org/10.3390/app9061192
  • Shafiee M, Labib A, Maiti J, Starr A. 2019c. Maintenance strategy selection for multi-component systems using a combined analytic network process and cost-risk criticality model. Proceedings of the Institution of Mechanical Engineers, Part O: Journal of Risk and Reliability. 233(2):89–104.
  • Silva VBS, Morais DC, Almeida AT. 2010. A multicriteria group decision model to support watershed committees in Brazil. Water Resour Manage. 24:4075–4091. doi: https://doi.org/10.1007/s11269-010-9648-2
  • Smithson T. 2016. HPHT wells. Schlumberger, Available at: http://oilproduction.net/files/HP-HT-Schlumberger.pdf Accessed on 17 July 2019.
  • Toldo B, Shuttleworth A, Zabelina P. 2016. Sub-surface safety valve (SSSV) erosion assessment in HPHT gas field - a case study. In: Offshore Technology Conference Asia, 22–25 March, Kuala Lumpur, Malaysia. pp. 1–11.
  • Tom J, Draper S, White D, O’Neill M. 2016. Risk-based assessment of scour around subsea infrastructure. In: Offshore Technology Conference, 2–5 May, Houston, Texas, USA. pp. 1–20.
  • Turcksin L, Bernardini A, Macharis C. 2011. A combined AHP-PROMETHEE approach for selecting the most appropriate policy scenario to stimulate a clean vehicle fleet. Procedia - Social and Behavioral Sciences. 20:954–965. doi: https://doi.org/10.1016/j.sbspro.2011.08.104
  • Villa V, Paltrinieri N, Khan F, Cozzani V. 2016. Towards dynamic risk analysis: a review of the risk assessment approach and its limitations in the chemical process industry. Saf Sci. 89:77–93. doi: https://doi.org/10.1016/j.ssci.2016.06.002
  • Vinodh S, Girubha RJ. 2011. PROMETHEE based sustainable concept selection. Appl Math Model. 36(11):5301–5308. doi: https://doi.org/10.1016/j.apm.2011.12.030
  • Ward EG, Gilbert RB, Jaber J, Wolford AJ. 2001. Deepwater production system risks. In: The Eleventh International Offshore and Polar Engineering Conference, 17–22 June, Stavanger, Norway. pp. 654–659.
  • Weber BJ, Mudan KS. 1992. Arctic pipeline risk assessments. In: The Second International Offshore and Polar Engineering Conference, 14–19 June, San Francisco, California, USA, pp. 15–20.
  • Wray BL, Bedford DR, Leotaud L, Hunter WJ. 2009. The application of high-density elastic cements to solve HP/HT challenges in South Texas: The success story. In: SPE Annual Technical Conference and Exhibition, 4–7 October, New Orleans, Louisiana. pp. 1–17.
  • Yusoff NH, Yusof MR. 2009. Managing HSE risk in harsh environment. In: Asia Pacific Health, Safety, Security and Environment Conference, 4–6 August, Jakarta, Indonesia. pp. 1–6.
  • Zio E. 1996. On the use of the analytic hierarchy process in the aggregation of expert judgments. Reliability Engineering and System Safety. 53:127–138. doi: https://doi.org/10.1016/0951-8320(96)00060-9

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.