216
Views
8
CrossRef citations to date
0
Altmetric
Articles

Fundamental simulation studies of CONWIP in front-end wafer fabrication

, , , &
Pages 232-246 | Received 23 Mar 2014, Accepted 24 Mar 2015, Published online: 03 Jun 2015

References

  • Bahaji, N. and M. E. Kuhl, “A simulation study of new multi-objective composite dispatching rules, CONWIP, and push lot release in semiconductor fabrication,” International Journal of Production Research, 46(14), 3801–3824 (2008).10.1080/00207540600711879
  • Banerjee, A., “Global Trends in Supply Chain Planning in Semiconductor Industry,” The Global Semiconductor Industry Needs a Very High Level of Planning and Collaboration Between Multiple Stakeholders to Ensure a Smooth Supply Chain, 5(3), 1–11 (2007).
  • Banks, J., Discrete Event System Simulation, 4/e. Pearson Education India, New Delhi, (2005).
  • Brooks, R. J. and A. M. Tobias, “Choosing the best model: Level of detail, complexity, and model performance,” Mathematical and Computer Modelling, 24(4), 1–14 (1996).10.1016/0895-7177(96)00103-3
  • Chee, S. L., M. Y. Chong and J. F. Chin, “Milk-run kanban system for raw printed circuit board withdrawal to surface-mounted equipment,” Journal of Industrial Engineering and Management, 5(2), 382–405 (2012).
  • Chiang, T. C. and L. C. Fu, “Rule-based scheduling in wafer fabrication with due date-based objectives,” Computers & Operations Research, 39(11), 2820–2835 (2012).
  • Chik, M. A., K. Ibrahim, M. H. Saidin, F. M. Yusof, G. Devandran and U. Hashim, “Development of capacity indices for semiconductor fabrication,” 10th IEEE International Conference Semiconductor Electronics (ICSE), Kuala Lumpur, 649–653 (2012).
  • Chong, K. E. and K. S. Lim, “CONWIP based control of a semiconductor end of line assembly,” Proceedings of the Malaysian Technical Universities Conference on Engineering and Technology (MUCET), Pahang, 281–286 (2012).
  • Chramcov, B., P. Beran, L. Daníček and R. Jašek, “A simulation approach to achieving more efficient production systems,” International Journal of Mathematics and Computers in Simulation [online], 5(4), 299–309 (2011).
  • Dabbas, R. M. and J. W. Fowler, “A new scheduling approach using combined dispatching criteria in wafer fabs,” IEEE Transactions on Semiconductor Manufacturing, 16(3), 501–510 (2003).10.1109/TSM.2003.815201
  • Davis, J. P., K. M., Eisenhardt and C. B. Bingham, “Developing theory through simulation methods,” Academy of Management Review, 32(2), 480–499 (2007).10.5465/AMR.2007.24351453
  • Duranik, T., J. Ruzbarsky and M. Stopper, “Improving of delivery reliability and throughput using production planning with conwip aspects,” Proceedings of the 23rd International DAAAM Symposium, 3(1), 0907–0910 (2012).
  • Duri, C., Y. Frein and H. S. Lee, “Performance evaluation and design of a CONWIP system with inspections,” International Journal of Production Economics, 64(1–3), 219–229 (2000).10.1016/S0925-5273(99)00060-2
  • Enns, S. T. and P. Rogers, “Clarifying CONWIP versus push system behavior using simulation,” Simulation Conference, 2008. WSC 2008. Winter, IEEE, 1867–1872 (2008, December).
  • Fowler, J. W., G. L. Hogg and D. T. Phillips, “Control of multiproduct bulk server diffusion/oxidation processes. Part 2: multiple servers’,” IIE Transactions, 32(2), 167–176 (2000).
  • Geraghty, J. and C. Heavey, “A review and comparison of hybrid and pull-type production control strategies,” OR Spectrum, 27(2–3), 435–457 (2005).10.1007/s00291-005-0204-z
  • Gupta, J. N., R. Ruiz, J. W. Fowler and S. J. Mason, “Operational planning and control of semiconductor wafer production,” Production Planning and Control, 17(7), 639–647 (2006).10.1080/09537280600900733
  • Helber, S., K. Schimmelpfeng and R. Stolletz, “Setting inventory levels of CONWIP flow lines via linear programming,” ( No. 436). Diskussionspapiere der Wirtschaftswissenschaftlichen Fakultät//Wirtschaftswissenschaftliche Fakultät, Leibniz Universität Hannover (2009).
  • Hu, H., Z. Jiang and H. Zhang, “A dynamic WIP control strategy for bottlenecks in a wafer fabrication system,” International Journal of Production Research, 48(17), 5221–5233 (2010).10.1080/00207540903117881
  • Huang, Y., H. Wan, G. Kuriger and F. F. Chen, “Simulation studies of hybrid pull systems of Kanban and CONWIP in an assembly line,” in Advances in Sustainable and Competitive Manufacturing Systems, Springer International Publishing, Switzerland, 1553–1563 (2013).
  • Ip, W. H., M. Huang, K. L. Yung, D. Wang and X. Wang, “CONWIP based control of a lamp assembly production line,” Journal of Intelligent Manufacturing, 18(2), 261–271 (2007).10.1007/s10845-007-0021-0
  • Khojasteh-Ghamari, Y., “A performance comparison between Kanban and CONWIP controlled assembly systems,” Journal of Intelligent Manufacturing, 20(6), 751–760 (2009).10.1007/s10845-008-0174-5
  • Kim, Y.-D., D.-H., Lee, J.-U., Kim and H.-K., Roh, “A simulation study on lot release control, mask scheduling, and batch scheduling in semiconductor wafer fabrication facilities,” Journal of Manufacturing Systems, 17(2), 107–117 (1998).
  • Lee, I., “Evaluating artificial intelligence heuristics for a flexible Kanban system: Simultaneous Kanban controlling and scheduling,” International Journal of Production Research, 45(13), 2859–2873 (2007).10.1080/00207540600806505
  • Lee, Y. H. and B. Lee, “Push-pull production planning of the re-entrant process,” The International Journal of Advanced Manufacturing Technology, 22(11–12), 922–931 (2003).10.1007/s00170-003-1653-7
  • Li, J. W., “Simulation study of coordinating layout change and quality improvement for adapting job shop manufacturing to CONWIP control,” International Journal of Production Research, 48(3), 879–900 (2010).10.1080/00207540802478814
  • Li, J. W., “Comparing Kanban with CONWIP in a make-to-order environment supported by JIT practices,” Journal of the Chinese Institute of Industrial Engineers, 28(1), 72–88 (2011).10.1080/10170669.2010.536633
  • Lin, J. T., F. K. Wang and Y. M. Chang, “A hybrid push/pull-dispatching rule for a photobay in a 300mm wafer fab,” Robotics and Computer-Integrated Manufacturing, 22(1), 47–55 (2006).10.1016/j.rcim.2005.02.003
  • Mönch, L., J. W. Fowler and S. J. Mason, Production Planning and Control for Semiconductor Wafer Fabrication Facilities: Modeling, Analysis, and Systems, Springer New York, NY, (2012).
  • Pickardt, C., J. Branke, T. Hildebrandt, J. Heger and B. Scholz-Reiter, “Generating dispatching rules for semiconductor manufacturing to minimize weighted tardiness,” Simulation Conference (WSC), Proceedings of the 2010 Winter, Baltimore, MD, 2504–2515, IEEE (2010, December).
  • Pinedo, M., Scheduling: Theory, Algorithms, and Systems, Springer, Berlin, (2012).
  • Prakash, J. and J. F. Chin, “A comparison of push and pull production controls under machine breakdown,” International Journal of Business Science and Applied Management, 6(3), 58–70 (2011).
  • Qiao, F. and Q. Wu, “Layered Drum-Buffer-Rope-Based scheduling of reentrant manufacturing systems,” IEEE Transactions on Semiconductor Manufacturing, 26(2), 178–187 (2013).10.1109/TSM.2013.2248763
  • Robinson, J., J. Fowler and E. Neacy, “Capacity loss factors in semiconductor manufacturing.” Working paper (2003).
  • Rose, O., “CONWIP-like lot release for a wafer fabrication facility with dynamic load changes,” Proceedings of the SMOMS, 1, 41–46 (2001).
  • Ryan, S. M., B. Baynat and F. F. Choobineh, “Determining inventory levels in a CONWIP controlled job shop,” IIE Transactions, 32(2), 105–114 (2000).
  • Sandell, R. and K. Srinivasan, “Evaluation of lot release policies for semiconductor manufacturing systems,” Proceedings of the 28th conference on Winter simulation, 1014–1022, IEEE Computer Society, Coronado Island, CA (1996, November).
  • Sarin, S. C., A. Varadarajan and L. Wang, “A survey of dispatching rules for operational control in wafer fabrication,” Production Planning and Control, 22(1), 4–24 (2011).10.1080/09537287.2010.490014
  • Selvaraj, N., “Simulation modeling and analysis of single line multi stage manufacturing system,” Journal of Scientific and Industrial Research, 67(4), 277–281 (2000).
  • Sha, D. Y., S. Y. Hsu and X. D. Lai, “Design of due-date oriented look-ahead batching rule in wafer fabrication,” The International Journal of Advanced Manufacturing Technology, 35(5–6), 596–609 (2007).10.1007/s00170-006-0723-z
  • Spearman, M. L., D. L. Woodruff and W. J. Hopp, “CONWIP: A pull alternative to Kanban,” International Journal of Production Research, 28(5), 879–894 (1990).10.1080/00207549008942761
  • Tabucanon, M. T., D. N. Batanov and S. Basu, “Using simulation to evaluate the batching approach to part type selection in flexible manufacturing systems,” Integrated Manufacturing Systems, 9(1), 5–14 (1998).10.1108/09576069810196797
  • Takahashi, K. and D. Myreshka, “Comparing CONWIP, synchronized CONWIP, and Kanban in complex supply chains,” International Journal of Production Economics, 93–94, 25–40 (2005).10.1016/j.ijpe.2004.06.003
  • Takahashi, K. and N. Nakamura, “Decentralized reactive Kanban system,” European Journal of Operational Research, 139(2), 262–276 (2002).10.1016/S0377-2217(01)00358-7

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.