122
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Construction of minimum cost reliability acceptance sampling plans for multistage process

&

References

  • Epstein B, Sobel M. Life testing. J Am Stat Assoc. 1953;48(263):486–502.
  • Epstein B. Truncated life tests in the exponential case. Ann Math Stat. 1954;25(3):555–564.
  • Jun CH, Balamurali S, Lee SH. Variable sampling plans for Weibull distribution lifetimes under sudden death testing. IEEE Trans Reliab. 2006;55(1):53–58.
  • Bartholomew DJ. The sampling distribution of an estimate arising in life testing. Technometrics. 1963;5:361–374.
  • Aslam M, Jun CH. A group acceptance sampling plans for truncated life tests based on the inverse Rayleigh and log-logistic distributions. Pak J Stat. 2009;25:1–13.
  • Azam M, Aslam M, Balamurali S, et al. Two stage group acceptance sampling plan for half normal percentiles. J King Saud Univ Sci. 2015;27(3):239–243.
  • Tsai TR, Wu SJ. Acceptance sampling based on truncated life test for generalized Rayleigh distribution. J Appl Stat. 2006;33(6):595–600.
  • Kantam RR, Rosaiah K, Srinivas Rao G. Acceptance sampling plans based on life tests: log- logistic model. J Appl Stat. 2001;28(1):121–128.
  • Balamurali S, Usha M. Optimal design of variable chain sampling plan by minimizing the average sample number. Int J Manuf Eng. 2013;3:1–10.
  • Srinivasa Rao G. A group acceptance sampling plans for lifetimes following a generalized exponential distribution. Econ Qual Cont. 2009;24:75–85.
  • Aslam M. Double acceptance sampling based on truncated life-tests in Rayleigh distribution. Eur J Sci Res. 2007;17:605–611.
  • Aslam M, Jun CH. A group acceptance sampling plan for truncated life test having Weibull Distribution. J Appl Stat. 2009;36(9):1021–1027.
  • Wu CW, Aslam M, Jun CH. Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk. Eur J Oper Res. 2012;217(3):560–566.
  • Vellaisamy P, Sankar S. A unified approach for modeling and designing attribute sampling plans for monitoring dependent production processes. Methodol Comput Appl Probab. 2005;7(3):307–323.
  • Kumar M, P C R. Design of optimal reliability acceptance sampling plans for exponential distribution. Econ Qual Cont. 2016;31(1):23–36.
  • Saha M, Tripathi H, Dey S. Single and double acceptance sampling plans for truncated life tests based on transmuted Rayleigh distribution. J Ind Prod Eng. 2021;38(5):356–368.
  • Ramyamol PC, Kumar M. Optimal design of variable acceptance sampling plans for mixture distribution. J Appl Stat. 2019;46(15):2700–2721.
  • Vishkae BM, Niaki STA, Farhangi M, et al. A single-retailer multi-supplier multi-product inventory model with destructive testing acceptance sampling and inflation. J Ind Prod Eng. 2019;36(6):351–361.
  • Asokan MV, Balamurali S. Multi attribute single sampling plans. Econ Qual Cont. 2000;15:103–108.
  • Duffuaa SO, Al-Turki UM, Kolus AA. Process-targeting model for a product with two dependent quality characteristics using acceptance sampling plans. Int J P Res. 2009;47:4041–4046.
  • Moskowitz H, Plante R, Tang K. Multi stage multi attribute acceptance sampling in serial production systems. IIE Trans. 1986 June;18(2):130–137.
  • Lee HL, Tagaras G. Economic acceptance sampling plans in complex multi-stage production systems. Int J P Res. 1992;30(11):2615–2632.
  • Gaglioppa F, Lisa AM, Benjaafar S. Multi-task and multi stage production planning and scheduling for process industries. Oper Res. 2008;56:1010–1025.
  • Aslam M. Testing average wind speed using sampling plan for Weibull distribution under indeterminacy. Sci Rep. 2021;11(1):7532.
  • Aslam M, Srinivasa Rao G, Khan N. Single-stage and two-stage total failure-based group-sampling plans for the Weibull distribution under neutrosophic statistics. Complex Intell Syst. 2021;7(2):891–900.
  • Aslam M. Product acceptance determinations using new nonparametric sign sampling plan. J Stat Manage Syst. 2020;23(8):1561–1570.
  • Wang F, Tamirat Y, Lo SC, et al. Dependent mixed and mixed repetitive sampling plans for linear profiles. Qual Reliab Eng Int. 2017;33(8):1669–1683.
  • Siju KC, Kumar M. Estimation of stress-strength reliability of a parallel system with active, warm and cold standby components. J Ind Prod Eng. 2017;34(8):590–610.
  • Aslam M, Azam M, Jun C-H. Acceptance sampling plans for multi-stage process based on time-truncated test for Weibull distribution. Int J Adv Manuf Technol. 2015;79(9–12):1779–1785.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.