274
Views
2
CrossRef citations to date
0
Altmetric
Research Article

Applying the zero-inflated Poisson regression in the inventory management of irregular demand items

, ORCID Icon, &
Pages 458-478 | Received 22 Mar 2021, Accepted 06 Feb 2022, Published online: 10 Mar 2022

References

  • Cunha PS, Raupp FM, Oliveira F. A two-stage stochastic programming model for periodic replenishment control system under demand uncertainty. Comput Ind Eng. 2017;107:313–326.
  • Prak D, Teunter R. A general method for addressing forecasting uncertainty in inventory models. Int J Forecasting. 2019;35(1):224–238.
  • Huang YC, Chiu SC, Huang ZY. A study on optimal ordering strategy for multi-product under contract constraint and stochastic demand an example on S-Kitchen Life Company. J Ind Prod Eng. 2017;34(1):9–18.
  • Kourentzes N, Trapero JR, Barrow DK. Optimising forecasting models for inventory planning. Int J Prod Econ. 2020;225:107597.
  • Hu X, Zhang X, Zhang D A novel approach of intermittent demand prediction in industrial domain. In Journal of Physics: Conference Series (Vol. 1756, No. 1, p. 012009). 2021; IOP Publishing.
  • Cunico ML, Vecchietti A. A possibilistic model for production planning with uncertain demand. Eur J Ind Eng. 2020;14(6):743–762.
  • Pourjavad E, Shahin A. A hybrid model for analyzing the risks of green supply chain in a fuzzy environment. J Ind Prod Eng. 2020;37(8):422–433.
  • Yung KL, Gts H, Tang YM, et al. Inventory classification system in space mission component replenishment using multi-attribute fuzzy ABC classification. Ind Manage Data Syst. 2021;121:637–656.
  • Herbon A. Replenishing an inventory system permitting lost sales under poisson demand and short lead times: explicit performance and an efficient algorithm. Comput Ind Eng. 2019;137:105998.
  • Babiloni E, Cardos M, Albarracin JM, et al. Demand categorisation, forecasting, and inventory control for intermittent demand items. S A J Ind Eng. 2010;21(2):115–130.
  • Azzi A, Battini D, Faccio M, et al. Inventory holding costs measurement: a multi-case study. Int J Logistics Manage. 2014;25:109–132.
  • Zennaro I, Finco S, Battini D, et al. Big size highly customised product manufacturing systems: a literature review and future research agenda. Int J P Res. 2019;57(15–16):5362–5385.
  • Van der Auweraer S, Boute RN, Syntetos AA. Forecasting spare part demand with installed base information: a review. Int J Forecasting. 2019;35(1):181–196.
  • Shi Z. Optimal remanufacturing and acquisition decisions in warranty service considering part obsolescence. Comput Ind Eng. 2019;135:766–779.
  • Bülbül P, Bayındır ZP, İS B. Exact and heuristic approaches for joint maintenance and spare parts planning. Comput Ind Eng. 2019;129:239–250.
  • Chen MC, Hsu CM, Chen SW. Optimizing joint maintenance and stock provisioning policy for a multi-echelon spare part logistics network. J Chin Inst Ind Eng. 2006;23(4):289–302.
  • Bacchetti A, Saccani N. Spare parts classification and demand forecasting for stock control: investigating the gap between research and practice. Omega (Westport). 2012;40(6):722–737.
  • Hu Q, Liu L. Weighted score test based EWMA control charts for zero-inflated poisson models. Comput Ind Eng. 2021;152:106966.
  • Lambert D. Zero-inflated poisson regression, with an application to defects in manufacturing. Technometric. 1992;34(1):1–14.
  • Costantino F, Di Gravio G, Patriarca R, et al. Spare parts management for irregular demand items. Omega (Westport). 2018;81:57–66.
  • Syntetos AA, Boylan JE. The accuracy of intermittent demand estimates. Int J Forecasting. 2005;21(2):303–314.
  • Sani B, Kingsman BG. Selecting the best periodic inventory control and demand forecasting methods for low demand items. J Oper Res Soc. 1997;48(7):700–713.
  • Onyeocha CE, Khoury J, Geraghty J. Evaluation of multi-product lean manufacturing systems with setup and erratic demand. Comput Ind Eng. 2015;87:465–480.
  • Balaji K, Kumar VS. Effects of slow moving inventory in industries: insights of other researchers. Int J Trade Econ Finance. 2013;4(4):243.
  • Sanguri K, Mukherjee K. Forecasting of intermittent demands under the risk of inventory obsolescence. J Forecasting. 2021;40:1054–1069.
  • Pando V, Juan Garcı´a L, Luis A S-J, et al. Maximizing profits in an inventory model with both demand rate and holding cost per unit time dependent on the stock level. Comput Ind Eng. 2011;62:599–608.
  • Ahiska SS, Gocer F, King RE. Heuristic inventory policies for a hybrid manufacturing/remanufacturing system with product substitution. Comput Ind Eng. 2017;114:206–222.
  • Willemain, T. R., Smart, C. N., Shockor, J. H., & DeSautels, P. A. (1994). Forecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method. International Journal of forecasting, 10(4), 529-538.,
  • Teunter R, Sani B. On the bias of croston’s forecasting method. Eur J Oper Res. 2009;194(1):177–183.
  • Johnston FR, Boylan JE. Forecasting for items with intermittent demand. J Oper Res Soc. 1996;47(1):113–121.
  • Syntetos AA, Boylan JE. On the bias of intermittent demand estimates. Int J Prod Econ. 2001;71(1–3):457–466.
  • Petropoulos F, Kourentzes N, Nikolopoulos K. Another look at estimators for intermittent demand. Int J Prod Econ. 2016;181:154–161.
  • Lindsey M, Pavur R. Assessing a modification to croston’s method to incorporate a seasonal component. In: Advances in business and management forecasting. Emerald Group Publishing Limited; 2013.
  • Dhakshayani E, Narayanan S. Demand forecasting model for slow moving items. Int J Logist Syst Manage. 2014;19(2):245–260.
  • Zhu S, Dekker R, Van Jaarsveld W, et al. An improved method for forecasting spare parts demand using extreme value theory. Eur J Oper Res. 2017;261(1):169–181.
  • Pennings CL, Van Dalen J, van der Laan EA. Exploiting elapsed time for managing intermittent demand for spare parts. Eur J Oper Res. 2017;258(3):958–969.
  • Murray PW, Agard B, Barajas MA. ASACT-Data preparation for forecasting: a method to substitute transaction data for unavailable product consumption data. Int J Prod Econ. 2018;203:264–275.
  • Li C, Lim A. A greedy aggregation–decomposition method for intermittent demand forecasting in fashion retailing. Eur J Oper Res. 2018;269(3):860–869.
  • Snyder RD, Ord JK, Beaumont A. Forecasting the intermittent demand for slow-moving inventories: a modelling approach. Int J Forecasting. 2012;28(2):485–496.
  • Syntetos AA, Nikolopoulos K, Boylan JE. Judging the judges through accuracy-implication metrics: the case of inventory forecasting. Int J Forecasting. 2010;26(1):134–143.
  • Petropoulos F, Nikolopoulos K, Spithourakis GP, et al. Empirical heuristics for improving intermittent demand forecasting. Ind Manage Data Syst. 2013;113:683–696.
  • Hahn GJ, Leucht A. Managing inventory systems of slow-moving items. Int J Prod Econ. 2015;170:543–550.
  • Battini D, Persona A, Sgarbossa F Spare parts management: a comparison between (s, S) policy with delayed ordering and policy based on binomial distribution and total cost. 19th ISSAT Conference on reliability and quality in design, Hawaii, U.S.A, August5‐7, 2013.
  • Natarajan R, Goyal SK. Safety stocks in JIT environments. Int J Oper Prod Manage. 1994;14:64–71.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.