Sequencing jobs in an engineer-to-order engineering environment

&
Pages 201-217 | Received 03 Dec 2014, Accepted 25 Mar 2015, Published online: 22 Apr 2015

References

  • Baker, K. R. (1984). Sequencing rules and due-date assignments in a job shop. Management Science, 30, 1093–1104.10.1287/mnsc.30.9.1093
  • Baker, K. R., & Bertrand, J. V. M. (1981). A comparison of due date selection rules. AIIE Transactions, 13, 123–131.
  • Baker, K. R., & Trietsch, D. (2009). Principles of sequencing and scheduling. New York, NY: Wiley.10.1002/9780470451793
  • Brucker, P., Drexl, A., Moehring, R., Neumann, K., & Pesch, E. (1999). Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112, 3–41.10.1016/S0377-2217(98)00204-5
  • Carroll, D. C. (1965). Heuristic sequencing of single and multiple component jobs (Unpublished Ph.D. dissertation). Sloan School of Management, MIT, Cambridge, MA.
  • Coates, G., Ritchey, I., Duffy, H. B., Hills, W., & Whitfield, R. I. (2000). Integrated engineering environments for large complex products. Concurrent Engineering: Research and Applications, 8, 171–182.10.1177/1063293X0000800302
  • Conway, R. W. (1965a). Priority dispatching and work-in-process inventory in a job shop. Journal of Industrial Engineering, 16, 123–130.
  • Conway, R. W. (1965b). Priority dispatching and job lateness in a job shop. Journal of Industrial Engineering, 16, 228–237.
  • Conway, R. W., & Maxwell, W. L. (1962). Network dispatching by shortest operation discipline. Operations Research, 10, 51–73.
  • Conway, R. W., Maxwell, W. L., & Miller, L. W. (1967). Theory of Scheduling. Reading, MA: Addison-Wesley.
  • Cutler, T. R. (2005). Are you ETO? The increasing importance of custom (engineer-to-order) manufacturers. In MFG, pp. 1–3.
  • Cutler, T. R. (2009). Special orders, engineer to order challenges for the industrial engineer. Industrial Engineer, 41, 36–38.
  • Elvers, D. A. (1973). Job shop dispatching using various due date setting criteria. Production and Inventory Management, 14, 62–69.
  • Elvers, D. A., & Taube, L. (1983). Time completion for various dispatching rules in a job shop. Omega, 11, 81–89.
  • Gere, W. S. (1966). Heuristics in job shop scheduling. Management Science, 13, 167–190.
  • Gosling, J., & Naim, M. M. (2009). Engineer to order supply chain management: A literature review and research agenda. International Journal of Production Economics, 122, 741–754.10.1016/j.ijpe.2009.07.002
  • Grabenstetter, D. H., & Usher, J. M. (2013). Determining job complexity in an engineer to order environment for due date estimation using a proposed framework. International Journal of Production Research, 51, 5728–5740.10.1080/00207543.2013.787169
  • Grabenstetter, D. H., & Usher, J. M. (2014). Developing due dates in an engineer-to-order engineering environment. International Journal of Production Research, 52, 6349–6361.
  • Harrell, C., Ghosh, B. K., & Bowden, R. O. (2004). Simulation using ProModel (2nd ed.). New York, NY: McGraw-Hill.
  • Hicks, C., & Braiden, P. M. (2000). Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach. International Journal of Production Research, 38, 4783–4810.10.1080/00207540010001019
  • Hicks, C., & Pongcharoen, P. (2006). Dispatching rules for production scheduling in the capital goods industry. International Journal of Production Economics, 104, 154–163.10.1016/j.ijpe.2005.07.005
  • Hicks, C., & Pongcharoen, P. (2009). Applying different control approaches for resources with high and low utilisation: A case study of the production of complex products with stochastic processing times. International Journal of Technology Management, 48, 202–218.10.1504/IJTM.2009.024916
  • Hicks, C., McGovern, T., & Earl, C. F. (2000). Supply chain management: A strategic issue in engineer-to-order manufacturing. International Journal of Production Economics, 65, 179–190.10.1016/S0925-5273(99)00026-2
  • Hicks, C., McGovern, T., & Earl, C. F. (2001). A typology of UK engineer-to-order companies. International Journal of Logistics: Research and Applications, 4, 43–56.10.1080/13675560110038068
  • Hicks, C., Song, D. P., & Earl, C. F. (2007). Dynamic scheduling for complex engineer to order products. International Journal of Production Research, 45, 3477–3503.10.1080/00207540600767772
  • Kanet, J. J., & Hayya, J. C. (1982). Priority dispatching with operation due dates in a job shop. Journal of Operations Management, 2, 167–175.
  • Kutner, M. H., Nachtsheim, C. J., & Neter, J. (2004). Applied linear regression models (4th ed.). New York, NY: McGraw-Hill Irwin.
  • Little, D., Rollins, R., Peck, M., & Porter, J. K. (2000). Integrated planning and scheduling in the engineer to order sector. International Journal of Computer Integrated Manufacturing, 13, 545–554.
  • Miyazaki, S. (1981). Combined scheduling system for reducing job tardiness in a job shop. International Journal of Production Research, 19, 201–211.
  • Muhlemann, A. P., Lockett, A. G., & Farn, C. K. (1982). Job shop scheduling heuristics and frequency of scheduling. International Journal of Production Research, 20, 227–241.
  • O’Neil, P. (1991). Performance of lot dispatching and scheduling algorithms through discrete event simulation. IEEE/SEMI International Semiconductor Manufacturing Science Symposium (pp. 21–24). San Francisco, CA.
  • Pandit, A., & Zhu, Y. (2009). An ontology-based approach to support decision-making for the design of ETO (engineer to order) products. Automation in Construction, 16, 759–770.
  • Pongcharoen, P., Hicks, C., Braiden, P. M., & Stewardson, D. J. (2002). Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products. International Journal of Production Economics, 78, 311–322.10.1016/S0925-5273(02)00104-4
  • Pongcharoen, P., Hicks, C., & Braiden, P. M. (2004). The development of genetic algorithms for the finite capacity scheduling of complex products, with multiple levels of product structure. European Journal of Operational Research, 152, 215–225.10.1016/S0377-2217(02)00645-8
  • Qi, X., & Tu, F. S. (1998). Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method. European Journal of Operational Research, 105, 502–508.10.1016/S0377-2217(97)00075-1
  • Salman, N., & Dogru, A. (2004). Design effort estimation using complexity metrics. Journal of Integrated Design and Process Science, 8, 83–88.
  • Song, D. P., Hicks, C., & Earl, C. F. (2001). Stage due date planning for multistage assembly systems. International Journal of Production Research, 39, 1943–1954.10.1080/00207540110035543
  • Song, D. P., Hicks, C., & Earl, C. F. (2002). Product due date assignments for complex assemblies. International Journal of Production Research, 76, 4877–4895.
  • Song, D. P., Hicks, C., & Earl, C. F. (2006). An ordinal optimization based evolution strategy to schedule complex make to order products. International Journal of Production Research, 44, 4877–4895.10.1080/00207540600620922
  • Stevenson, M., Hendry, L. C., & Kingsman, B. G. (2005). A review of production planning and control: The applicability of key concepts to the make-to-order industry. International Journal of Production Research, 43, 869–898.10.1080/0020754042000298520
  • Stoop, P. P. M., & Wiers, V. C. S. (1996). The complexity of scheduling in practice. International Journal of Operations and Production Management, 16, 37–53.10.1108/01443579610130682
  • Weeks, J. K. (1979). A simulation study of predictable due dates. Management Science, 25, 363–373.
  • Worthen, B. (2002). Nestlé’s ERP Odyssey. CIO, 15, 1–9.