1,705
Views
12
CrossRef citations to date
0
Altmetric
Articles

A stochastic periodic review inventory model for vendor–buyer system with setup cost reduction and service–level constraint

ORCID Icon &
Pages 371-389 | Received 21 Aug 2017, Accepted 03 Nov 2017, Published online: 15 Nov 2017

References

  • Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17(3), 292–311.10.1111/deci.1986.17.issue-3
  • Beck, F. G., Glock, C. H., & Kim, T. (2017). Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments. International Journal of Production Economics, 193, 633–646.10.1016/j.ijpe.2017.07.015
  • Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead time. International Journal of Production Economics, 92(1), 75–80.10.1016/j.ijpe.2003.09.012
  • Braglia, M., Castellano, D., & Frosolini, M. (2016). A novel approach to safety stock management in a coordinated supply chain with controllable lead time using present value. Applied Stochastic Models in Business and Industry, 32(1), 99–112.10.1002/asmb.v32.1
  • Buzacott, J. A., & Ozkarahan, I. A. (1983). One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate. Naval Research Logistics Quarterly, 30(4), 675–696.10.1002/(ISSN)1931-9193
  • Castellano, D., Gallo, M., Santillo, L. C., & Song, D. (2017). A periodic review policy with quality improvement, setup cost reduction, backorder price discount and controllable lead time. Production & Manufacturing Research, 5(1), 328–350.10.1080/21693277.2017.1382397
  • Dey, O., & Giri, B. C. (2014). Optimal vendor investment for reducing defect rate in a vendor-buyer integrated system with imperfect production process. International Journal of Production Economics, 155(1), 222–228.10.1016/j.ijpe.2014.02.004
  • Fauza, G. F., Amer, Y., Lee, S. H., & Prasetyo, H. (2016). An integrated single-vendor multi-buyer production-inventory policy for food products incorporating quality degradation. International Journal of Production Economics, 182, 409–417.10.1016/j.ijpe.2016.09.009
  • Giri, B. C., & Roy, B. (2013). A vendor-buyer integrated production-inventory model with quantity discount and unequal sized shipments. International Journal of Operational Research, 16(1), 1–13.10.1504/IJOR.2013.050537
  • Glock, C. H. (2009). A comment: ‘Integrated single vendor-single buyer model with stochastic demand and variable lead time’. International Journal of Production Economics, 122, 790–792.10.1016/j.ijpe.2009.06.032
  • Glock, C. H. (2012a). Coordination of a production network with a single buyer and multiple vendors. International Journal of Production Economics, 135, 771–780.10.1016/j.ijpe.2011.10.010
  • Glock, C. H. (2012b). Lead time reduction strategies in a single-vendor-single buyer integrated inventory model with lot size-dependent lead times and stochastic demand. International Journal of Production Economics, 136(1), 37–44.10.1016/j.ijpe.2011.09.007
  • Goyal, S. K. (1976). An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15(1), 107–111.
  • Hsu, J. T., & Hsu, L. F. (2012). A note on ‘Optimal inventory model for items with imperfect quality and shortage backordering’. International Journal of Industrial Engineering Computations, 3(5), 939–948.10.5267/j.ijiec
  • Huang, C. K. (2004). An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration. International Journal of Production Economics, 91(1), 91–98.10.1016/S0925-5273(03)00220-2
  • Jauhari, W. A. (2016). Integrated vendor-buyer model with defective items, inspection error and stochastic demand. International Journal of Mathematics in Operational Research, 8(3), 342–359.10.1504/IJMOR.2016.075520
  • Jauhari, W. A., Sejati, N., & Rosyidi, C. N. (2016a). A collaborative supply chain inventory model with defective items, adjusted production rate and variable lead time. International Journal of Procurement Management, 9, 733–750.10.1504/IJPM.2016.079983
  • Jauhari, W. A., Fitriyani, A., & Aisyati, A. (2016b). An integrated inventory model for single-vendor single-buyer system with freight rate discount and stochastic demand. International Journal of Operational Research, 25(3), 327–350.10.1504/IJOR.2016.074757
  • Jauhari, W. A., Mayangsari, S., Kurdhi, N. A., & Wong, K. Y. (2017). A fuzzy periodic review integrated inventory model involving stochastic demand, imperfect production process and inspection errors. Cogent Engineering, 4, 1308653.
  • Jha, J. K., & Shanker, K. (2009). A single-vendor single-buyer production-inventory model with controllable lead time and service level constraint for decaying items. International Journal of Production Research, 47, 6875–6898.10.1080/00207540802398053
  • Jha, J. K., & Shanker, K. (2013). Single-vendor multi-buyer integrated production-inventory model with controllable lead time and service level constraints. Applied Mathematical Modelling, 37, 1753–1767.10.1016/j.apm.2012.04.042
  • Jia, T., Liu, Y., Wang, N., & Lin, F. (2016). Optimal production-delivery policy for a vendor-buyers integrated system considering postponed simultaneous delivery. Computers and Industrial Engineering, 99, 1–15.10.1016/j.cie.2016.07.002
  • Khan, M., & Jaber, M. Y. (2011). Optimal inventory cycle in a two-stage supply chain incorporating imperfect items from suppliers. International Journal of Operational Research, 20, 91–108.
  • Khan, M., Jaber, M. Y., & Ahmad, A. R. (2014). An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42(1), 16–24.10.1016/j.omega.2013.02.002
  • Khouja, M., & Mehrez, A. (1994). Economic production lot size model with variable production rate and imperfect quality. Journal of the Operational Research Society, 45, 1405–1417.10.1057/jors.1994.217
  • Kim, M. S., & Sarkar, B. (2017). Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. Journal of Cleaner Production, 144, 572–590.10.1016/j.jclepro.2016.11.052
  • Kurdhi, N. A., Lestari, S. M. P., & Susanti, Y. (2015). A fuzzy collaborative supply chain inventory model with controllable setup cost and service level constraint for imperfect items. International Journal of Applied Management Science, 7(2), 93–122.10.1504/IJAMS.2015.069265
  • Li, Y., Xu, X., & Ye, F. (2011). Supply chain coordination model with controllable lead time and service level constraint for decaying items. International Journal of Production Research, 61, 858–864.
  • Li, J., Su, Q., & Ma, L. (2017). Production and transportation outsourcing decisions in the supply chain under single and multiple carbon policies. Journal of Cleaner Production, 141, 1109–1122.10.1016/j.jclepro.2016.09.157
  • Lin, Y.J. (2010) “A stochastic periodic review integrated inventory model involving defective items, backorder price discount, and variable lead time.” 4OR, 8, 281–297.10.1007/s10288-010-0124-x
  • Lin, Y. J., & Lin, H. J. (2016). Optimal ordering and recovery policy in a periodic review integrated inventory model. International Journal of Systems Sciences, 3, 200–210.
  • Muniappan, P., Uthayakumar, R., & Ganesh, S. (2016). A production inventory model for vendor–buyer coordination with quantity discount, backordering and rework for fixed life time products. Journal of Industrial and Production Engineering, 33(6), 355–362.10.1080/21681015.2015.1070374
  • Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2006). Analysis of optimal vendor–buyer integrated inventory policy involving defective items. The International Journal of Advanced Manufacturing Technology, 29, 1232–1245.10.1007/s00170-005-0008-y
  • Pal, S., & Mahapatra, G. S. (2017). A manufacturing-oriented supply chain model for imperfect quality with inspection errors, stochastic demand under rework and shortages. Computers and Industrial Engineering, 106, 299–314.10.1016/j.cie.2017.02.003
  • Priyan, S., & Uthayakumar, R. (2017). An integrated production–distribution inventory system involving probabilistic defective and errors in quality inspection under variable setup cost. International Transactions in Operational Research, 24(6), 1487–1524.10.1111/itor.2017.24.issue-6
  • Sana, S. S. (2011). A production-inventory model of imperfect quality products in a three-layer supply chain. Decision Support Systems, 50(2), 539–547.10.1016/j.dss.2010.11.012
  • Schweitzer, P. J., & Seidmann, A. (1991). Optimizing processing rates for flexible manufacturing systems. Management Science, 37(4), 454–466.10.1287/mnsc.37.4.454
  • Silver, E. A., Pyke, D. F., & Peterson, R. (1998). Decisions systems for inventory management and production planning. Singapore: John Wiley & Sons.
  • Tahami, H., Mirzazadeh, A., Arshadi-Khamseh, A., and Gholakami-Qadikolaei, A. (2016). A periodic review integrated inventory model for buyer”s unidentified protection interval demand distribution. Cogent Engineering, 3, 1206689.
  • Taleizadeh, A. A., Niaki, S. T. A., & Wee, H. M. (2013). Joint single vendor-single buyer supply chain problem with stochastic demand and fuzzy lead-time. Knowledge-Based Systems, 48, 1–9.10.1016/j.knosys.2013.03.011
  • Wahab, M. I. M., Mamun, S. M. H., & Ongkunaruk, P. (2011). EOQ models for a coordinated two-level international supply chain considering imperfect items and environmental impact. International Journal of Production Economics, 134, 151–158.10.1016/j.ijpe.2011.06.008
  • Wangsa, I. D. (2017). Greenhouse gas penalty and incentive policies for a joint economic lot size model with industrial and transport emissions. International Journal of Industrial Engineering Computations, 8, 453–480.10.5267/j.ijiec.2017.3.003
  • Wangsa, I. D., & Wee, H. M. (In press) “An integrated vendor-buyer inventory model with transportation cost and stochastic demand.” International Journal of Systems Science: Operations & Logistics, 3.10.1080/00207721.2017.1390701
  • Zhang, Q., Luo, J., & Duan, Y. (2016). Buyer-vendor coordination for fixed lifetime product with quantity discount under finite production rate. International Journal of Systems Science, 47(4), 821–834.10.1080/00207721.2014.906684