240
Views
11
CrossRef citations to date
0
Altmetric
ARTICLES

Selecting and scheduling interrelated road projects with uncertain demand

ORCID Icon &
Pages 1712-1733 | Received 15 Aug 2018, Accepted 29 Jun 2019, Published online: 08 Jul 2019

References

  • Crowder, H. P., E. L. Johnson, and M. W. Padberg. 1983. “Solving Large-Scale Zero-One Linear Programming Problems.” Operations Research 31: 803–834. doi: 10.1287/opre.31.5.803
  • Cruz, L., E. Fernandez, C. Gomez, G. Rivera, and F. Perez. 2014. “Many-objective Portfolio Optimization of Interdependent Projects with ‘a Priori’ Incorporation of Decision-Maker Preferences.” Applied Mathematics & Information Sciences 8 (4): 1517–1531. doi: 10.12785/amis/080405
  • De Neufville, R., and S. Scholtes. 2011. Flexibility in Engineering Design. Cambridge, MA: MIT Press.
  • Frank, M., and P. Wolfe. 1956. “An Algorithm for Quadratic Programming.” Naval Research Logistics Quarterly 3 (1): 95–110. doi: 10.1002/nav.3800030109
  • HCM (Highway Capacity Manual). 2010. Washington, DC: Transportation Research Board.
  • HERS (Highway Economic Requirements System- State) Version. 2005. Technical Report, U.S. Department of Transportation, Federal Highway Administration.
  • HSM (Highway Safety Manual). 2010. Washington, DC: AASHTO.
  • Huang, D., Z. Liu, X. Fu, and P. T. Blythe. 2018. “Multimodal Transit Network Design in a Hub-and-Spoke Network Framework.” Transportmetrica A: Transport Science 14 (8): 706–735. doi: 10.1080/23249935.2018.1428234
  • Jiang, Y., and W. Y. Szeto. 2015. “Time-dependent Transportation Network Design that Considers Health Cost.” Transportmetrica A: Transport Science 11 (1): 74–101. doi: 10.1080/23249935.2014.927938
  • Jong, J. C., and P. Schonfeld. 2001. “Genetic Algorithm for Selecting and Scheduling Interdependent Projects.” Journal of Waterway, Port, Coastal, and Ocean Engineering 127 (1): 45–52. doi: 10.1061/(ASCE)0733-950X(2001)127:1(45)
  • Jong, J. C., and P. Schonfeld. 2003. “An Evolutionary Model for Simultaneously Optimizing Three-Dimensional Highway Alignments.” Transportation Research Part B: Methodological 37 (2): 107–128. doi: 10.1016/S0191-2615(01)00047-9
  • Koziel, S., and X. S. Yang. 2011. “Computational Optimization, Methods and Algorithms.” Springer 356: 33–59.
  • Kumar, A., and S. Mishra. 2018. “A Simplified Framework for Sequencing of Transportation Projects Considering User Costs and Benefits.” Transportmetrica A: Transport Science 14 (4): 346–371. doi: 10.1080/23249935.2017.1387827
  • LeBlanc, L. J., E. K. Morlok, and W. P. Pierskalla. 1975. “An Efficient Approach to Solving the Road Network Equilibrium Traffic Assignment Problem.” Transportation Research 9 (5): 309–318. doi: 10.1016/0041-1647(75)90030-1
  • Li, X., S. C. Fang, X. Guo, Z. Deng, and J. Qi. 2016. “An Extended Model for Project Portfolio Selection with Project Divisibility and Interdependency.” Journal of Systems Science and Systems Engineering 25 (1): 119–138. doi: 10.1007/s11518-015-5281-1
  • Lorie, J. H., and L. J. Savage. 1955. “Three Problems in Rationing Capital.” Journal of Business 28 (4): 229–239. doi: 10.1086/294081
  • Martello, S., and P. Toth. 1990. Knapsack Problems: Algorithms and Computer Implementations, 189–220. Chichester: John Wiley and Sons.
  • Nemhauser, G. L., and Z. Ullman. 1969. “Discrete Dynamic Programming and Capital Allocation.” Management Science 15 (9): 494–505. doi: 10.1287/mnsc.15.9.494
  • Rebiasz, B., B. Gaweł, and I. Skalna. 2014. “Capital Budgeting of Interdependent Projects with Fuzziness and Randomness.” Information Systems Architecture and Technology: 125–135.
  • Savage, S. L., and H. M. Markowitz. 2009. The Flaw of Averages: Why We Underestimate Risk in the Face of Uncertainty. John Wiley & Sons.
  • Shayanfar, E., A. S. Abianeh, P. Schonfeld, and L. Zhang. 2016. “Prioritizing Interrelated Road Projects Using Meta-Heuristics.” Journal of Infrastructure Systems 22 (2): 04016004. doi: 10.1061/(ASCE)IS.1943-555X.0000293
  • Shayanfar, E., and P. Schonfeld. 2015. “Characteristics of the Sioux Falls Test Network.” TSC Report 2015-04. University of Maryland, College Park.
  • Shayanfar, E., and P. Schonfeld. 2017. “Selecting and Scheduling Interrelated Projects: Application in Urban Road Network Investment.” International Journal of Logistics Systems and Management 29 (4): 436–454. doi: 10.1504/IJLSM.2018.090472
  • Sun, Y., and P. Schonfeld. 2015. “Stochastic Capacity Expansion Models for Airport Facilities.” Transportation Research Part B 80: 1–18. doi: 10.1016/j.trb.2015.06.009
  • Szeto, W. Y., and H. K. Lo. 2005. “Strategies for Road Network Design Over Time: Robustness under Uncertainty.” Transportmetrica 1 (1): 47–63. doi: 10.1080/18128600508685642
  • Wang, S. L., and P. Schonfeld. 2005. “Scheduling Interdependent Waterway Projects Through Simulation and Genetic Optimization.” Journal of Waterway, Port, Coastal, and Ocean Engineering 131 (3): 89–97. doi: 10.1061/(ASCE)0733-950X(2005)131:3(89)
  • Wang, S. L., and P. Schonfeld. 2008. “Scheduling of Waterway Projects with Complex Interrelations.” Transportation Research Record: Journal of the Transportation Research Board 2062: 59–65. doi: 10.3141/2062-08
  • Yang, N., S. Wang, and P. Schonfeld. 2015. “Simulation-Based Scheduling of Waterway Projects Using a Parallel Genetic Algorithm.” Transportation Systems and Engineering: Concepts, Methodologies, Tools, and Applications: 334–347. doi: 10.4018/978-1-4666-8473-7.ch016
  • Zhang, L., M. Ji, and N. Ferrari. 2013. “Comprehensive Highway Corridor Planning with Sustainability Indicators.” Final Report for Project MD-13-SP109B4Q, Maryland State Highway Administration.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.