102
Views
4
CrossRef citations to date
0
Altmetric
Articles

Integrated model for an imperfect production-inventory system with a generalised shipment policy, errors in quality inspection and ordering cost reduction

&
Pages 260-274 | Received 26 Sep 2015, Accepted 11 Apr 2016, Published online: 05 May 2016

References

  • Affisco, J.F., Paknejad, M.J., & Nasri, F. (2002). Quality improvement and setup cost reduction in the joint economic lot size model. European Journal of Operational Research, 142, 497–508.
  • Banerjee, A. (1986). A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17, 292–311.
  • Bennett, G.K., Case, K.E., & Schmidt, J.W. (1974). Economic effects of inspection error on attribute sampling plans. Naval Research Logistics, 21, 431–443.
  • Ben-Daya, M., & Hariga, M. (2000). Economic lot scheduling problem with imperfect production processes. Journal of the Operational Research Society, 51, 875–881.
  • Ben-Daya, M., & Hariga, M. (2004). Integrated single vendor single buyer model with stochastic demand and variable lead-time. International Journal of Production Economics, 92, 75–80.
  • Ben-Daya, M., & Rahim, A. (2003). Optimal lot-sizing, quality improvement and inspection errors for multi-stage production systems. International Journal of Production Research, 41, 65–79.
  • Ben-Daya, M., & Zamin, S.A. (2002). Joint economic lot sizing problem with stochastic demand. Technical Report. Dhahran: Systems Engineering Department, King Fahd University of Petroleum and Minerals.
  • Cárdenas-Barrón, L.E. (2009). Economic production quantity with rework process at a single-stage manufacturing system with planned backorders. Computers & Industrial Engineering, 57, 1105–1113.
  • Chan, W.M., Ibrahim, R.N., & Lochert, P.B. (2003). A new EPQ model: Integrating lower pricing, rework and reject situations. Production Planning & Control, 14, 588–595.
  • Chang, H.C., & Ho, C.H. (2010). Exact closed-form solutions for “optimal inventory model for items with imperfect quality and shortage backordering”. Omega, 38, 233–237.
  • Chang, H.C., Ouyang, L.Y., Wu, K.S., & Ho, C.H. (2006). Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research, 170, 481–495.
  • Duffuaa, S.O., & Khan, M. (2002). An optimal repeat inspection plan with several classifications. Journal of the Operational Research Society, 53, 1016–1026.
  • Dey, O., & Giri, B.C. (2014). Optimal vendor investment for reducing defect rate in a vendor-buyer integrated system with imperfect production process. International Journal of Production Economics, 155, 222–228.
  • Giri, B.C., & Sharma, S. (2014). Lot sizing and unequal-sized shipment policy for an integrated production-inventory system. International Journal of Systems Science, 45, 888–901.
  • Giri, B.C., & Sharma, S. (2015). An integrated inventory model for a deteriorating item with allowable shortages and credit linked wholesale price. Optimization Letters, 9, 1149–1175.
  • Glock, C.H. (2012a). A comparison of alternative delivery structures in a dual sourcing environment. International Journal of Production Research, 50, 3095–3114.
  • Glock, C.H. (2012b). The joint economic lot size problem: A review. International Journal of Production Economics, 135, 671–686.
  • Goyal, S.K. (1976). An integrated inventory model for a single-supplier single-customer problem. International Journal of Production Research, 15, 107–111.
  • Goyal, S.K. (1988). A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19, 236–241.
  • Goyal, S.K. (1995). A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82, 209–210.
  • Goyal, S.K., & Cárdenas-Barrón, L.E. (2002). Note on: Economic production quantity model for items with imperfect quality – A practical approach. International Journal of Production Economics, 77, 85–87.
  • Goyal, S.K., Huang, C.K., & Chen, K.C. (2003). A simple integrated production policy of an imperfect item for vendor and buyer. Production Planning & Control, 14, 596–602.
  • Goyal, S.K., & Nebebe, F. (2000). Determination of economic production-shipment policy for a single-vendor single-buyer system. European Journal of Operational Research, 121, 175–178.
  • Goyal, S.K., & Szendrovits, A.Z. (1986). A constant lot size model with equal and unequal size batch shipments between production stages. Engineering Costs and Production Economics, 10, 203–210.
  • Ha, D., & Kim, S.L. (1997). Implementation of JIT purchasing: An integrated approach. Production Planning & Control, 8, 152–157.
  • Hall, R.W. (1983). Zero inventory. Homewood, IL: Dow Jones-Irwin.
  • Hill, R.M. (1997). The single-vendor single-buyer integrated production-inventory model with a generalised policy. European Journal of Operational Research, 97, 493–499.
  • Hill, R.M. (1999). The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory model. International Journal of Production Research, 37, 2463–2475.
  • Hoque, M.A. (2013). A manufacturer–buyer integrated inventory model with stochastic lead times for delivering equal-and/orunequal-sized batches of a lot. Computers & Operations Research, 40, 2740–2751.
  • Hoque, M.A., & Goyal, S.K. (2006). A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal and unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102, 217–225.
  • Huang, C.K. (2002). An integrated vendor-buyer cooperative inventory model for items with imperfect quality. Production Planning & Control, 13, 355–361.
  • Huang, C.K. (2004). An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics, 91, 91–98.
  • Hsu, J.T., & Hsu, L.F. (2012). An integrated single-vendor single-buyer production-inventory model for items with imperfect quality and inspection errors. International Journal of Industrial Engineering Computations, 3, 703–720.
  • Hsu, J.T., & Hsu, L.F. (2013). An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns. International Journal of Production Economics, 143, 162–170.
  • Keller, G., & Noori, H. (1988). Justifying new technology acquisition through its impact on the cost of running an inventory policy. IIE Transactions, 20, 284–291.
  • Khan, M., Jaber, M.Y., & Bonney, M. (2011a). An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 133, 113–118.
  • Khan, M., Jaber, M.Y., Guiffrida, A.L., & Zolfaghari, S. (2011b). A review of the extensions of a modified EOQ model for imperfect quality items. International Journal of Production Economics, 132, 1–12.
  • Khan, M., Jaber, M.Y., & Ahmad, A.R. (2014). An integrated supply chain model with errors in quality inspection and learning in production. Omega, 42, 16–24.
  • Kim, K.L., Hayya, J.C., & Hong, J.D. (1992). Setup reduction in economic production quantity model. Decision Sciences, 23, 500–508.
  • Konstantaras, I., Goyal, S.K., & Papachristos, S. (2007). Economic ordering policy for an item with imperfect quality subject to the in-house inspection. International Journal of Systems Science, 38, 473–482.
  • Lee, H.L., & Rosenblatt, M.J. (1987). Simultaneous determination of production cycle and inspection schedules in a production system. Management Science, 33, 1125–1137.
  • Li, Y., & Chen, Z. (2015). Optimal integrated production-inventory system for imperfect quality items considering unequal shipment policy. International Journal of Industrial and Systems Engineering, 19, 206–238.
  • Lin, Y.J. (2009). An integrated vendor-buyer inventory model with backorder price discount and effective investment to reduce ordering cost. Computers & Industrial Engineering, 56, 1597–1606.
  • Lu, L. (1995). A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research, 81, 312–323.
  • Maddah, B., & Jaber, M.Y. (2008). Economic order quantity for items with imperfect quality: Revisited. International Journal of Production Economics, 112, 808–815.
  • Nasri, F., Affisco, J.F., & Paknejad, M.J. (1990). Setup cost reduction in an inventory model with finite-range stochastic lead times. International Journal of Production Research, 28, 199–212.
  • Ouyang, L.Y., Wu, K.S., & Ho, C.H. (2006). Analysis of optimal vendor-buyer integrated inventory policy involving defective items. International Journal of Advanced Manufacturing Technology, 29, 1232–1245.
  • Paknejad, M.J., Nasri, F., & Affisco, J.F. (1995). Defective units in a continuous review (s, Q) system. International Journal of Production Research, 33, 2767–2777.
  • Papachristos, S., & Konstantaras, I. (2006). Economic ordering quantity models for items with imperfect quality. International Journal of Production Economics, 100, 148–154.
  • Porteus, E.L. (1985). Investing in reduced setups in the EOQ model. Management Science, 31, 998–1010.
  • Porteus, E.L. (1986). Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34, 137–144.
  • Priyan, S., & Uthayakumar, R. (2015). Mathematical modeling and computational algorithm to solve multi-echelon multi-constraint inventory problem with errors in quality inspection. Journal of Mathematical Modelling and Algorithms, 14, 67–89.
  • Raouf, A., Jain, J.K., & Sathe, P.T. (1983). A cost-minimization model for multi characteristic component inspection. IIE Transactions, 15, 187–194.
  • Rosenblatt, M.J., & Lee, H.L. (1986). Economic production cycles with imperfect production processes. IIE Transactions, 18, 48–55.
  • Salameh, M.K., & Jaber, M.Y. (2000). Economic production quantity model for items with imperfect quality. International Journal of Production Economics, 64, 59–64.
  • Sarkar, B., & Saren, S. (2016). Product inspection policy for an imperfect production system with inspection errors and warranty cost. European Journal of Operational Research, 248, 263–271.
  • Schwaller, R.L. (1988). EOQ under inspection costs. Production & Inventory Management, 29, 22–24.
  • Shi, J., Katehakis, M.N., Melamed, B., & Xia, Y. (2014). Optimal continuous replenishment for inventory systems with compound poisson demands and lost-sales. Operations Research, 6, 1048–1063.
  • Siajadi, H., Ibrahim, R.N., Lochert, P.B., & Chan, W.M. (2005). Joint replenishment policy in inventory-production systems. Production Planning & Control, 16, 255–262.
  • Skouri, K., Konstantaras, I., Lagodimos, A.G., & Papachristos, S. (2014). An EOQ model with backorders and rejection of defective supply batches. International Journal of Production Economics, 155, 148–154.
  • Soni, H.N., & Patel, K. (2014). Optimal policies for vendor-buyer inventory system involving defective items with variable lead time and service level constraint. International Journal of Mathematics in Operational Research, 6, 316–343.
  • Viswanathan, S. (1998). Optimal strategy for the integrated vendor-buyer inventory model. European Journal of Operational Research, 105, 38–42.
  • Wee, H., Yu, J., & Chen, M. (2007). Optimal inventory model for items with imperfect quality and shortage backordering. Omega, 35, 7–11.
  • Zhang, X., & Gerchak, Y. (1990). Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transactions, 22, 41–47.
  • Zhou, B., Zhao, Y., & Katehakis, M.N. (2007). Effective control policies for stochastic inventory systems with minimum order quantity and linear costs. International Journal of Production Economics, 106, 523–531.
  • Zhou, Y.W., & Wang, S.D. (2007). Optimal production and shipment models for a single-vendor single-buyer integrated system. European Journal of Operational Research, 180, 309–328.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.