335
Views
10
CrossRef citations to date
0
Altmetric
Articles

Integration of mathematical models for ore mining industry

ORCID Icon & ORCID Icon
Pages 55-68 | Received 16 Apr 2016, Accepted 12 Jun 2017, Published online: 05 Jul 2017

References

  • Bley, A. , Boland, N. , Fricke, C. , & Froyland, G. (2010). A strengthened formulation and cutting planes for the open pit mine production scheduling problem. Computers & Operations Research , 37 , 1641–1647.
  • Boland, N. , Dumitrescu, I. , Froyland, G. , & Gleixner, A. M. (2009). LP-based disaggregation approaches to solving the open pit mining production scheduling problem with block processing selectivity. Computers & Operations Research , 36 , 1064–1089.
  • Caccetta, L. , & Giannini, L. M. (1988). An application of discrete mathematics in the design of an open pit mine. Discrete Applied Mathematics , 21 , 1–19.
  • Caccetta, L. , & Hill, S. P. (2003). An application of branch and cut to open pit mine scheduling. Journal of Global Optimization , 27 , 349–365.
  • Chicoisne, R. , Espinoza, D. , Goycoolea, M. , Moreno, E. , & Rubio, E. (2012). A new algorithm for the open-pit mine production scheduling problem. Operations Research , 60 (3), 517–528.
  • Cullenbine, C. , Wood, R. K. , & Newman, A. (2011). A sliding time window heuristic for open pit mine block sequencing. Optimization Letters , 5 (3), 365–377.
  • Energy Efficiency Opportunities: Analyses of diesel use for mine haul and transport operations . (2013). Department of resources, energy and tourism, Australian government, public report.
  • Espinoza, D. , Goycoolea, M. , Moreno, E. , & Newman, A. (2013). MineLib: a library of open pit mining problems. Annals of Operations Research , 206 (1), 93–114.
  • Ferland, J. A. , Amaya, J. , & Djuimo, M. S. (2007). Application of a particle swarm algorithm to the capacitated open pit mining problem. In S. C. Mukhopadhyay & G. S. Gupta (Eds.), Autonomous Robots and Agents. Studies in Computational Intelligence (Vol. 76, pp. 127–133). Berlin, Heidelberg: Springer.
  • Hochbaum, D. S. , & Chen, A. (2000). Performance analysis and best implementations of old and new algorithms for the open-pit mining problem. Operations Research , 48 (6), 894–914.
  • IBM . (2012). IBM ILOG CPLEX optimization studio 12.4: optimization model development toolkit for mathematical and constraint programming. Retrieved from https://www-01.ibm.com/software/websphere/products/optimization/cplex-studio-community-edition/.
  • Kozan, E. , & Liu, S. Q. (2011). Operations research for mining: a classification and literature review. ASOR Bulletin , 30 (1), 2–23.
  • Kozan, E. , & Liu, S. Q. (2012). A demand-responsive decision support system for coal transportation. Decision Support Systems , 54 (1), 665–680.
  • Kozan, E. , & Liu, S. Q. (2016a). A new open-pit multi-stage mine production timetabling model for drilling, blasting and excavating operations. Mining Technology , 125 (1), 47–53.
  • Kozan, E. , & Liu, S. Q. (2016b). An operational-level multi-stage mine production timetabling model for optimally synchronising drilling, blasting and excavating operations. International Journal of Mining, Reclamation and Environment , 1–18. doi:10.1080/17480930.2016.1160818
  • Kozan, E. , Liu, S. Q. , & Wolff, R. (2013). A short-term production scheduling methodology for open-pit mines. In International Symposium on the 36th Applications of Computers and Operations Research in the Mineral Industry (the 36th APCOM) , Brazil (pp. 465–473). Porto Alegre, Brazil: Fundacao Luiz Englert.
  • Kumral, M. , & Dowd, P. A. (2005). A simulated annealing approach to mine production scheduling. Journal of the Operational Research Society , 56 , 922–930.
  • Lamghari, A. , Dimitrakopoulos, R. , & Ferland, J. A. (2015). A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines. Journal of Global Optimization , 63 (3), 555–582.
  • Lerchs, H. , & Grossmann, I. F. (1965). Optimum design of open-pit mines. Transactions on CIM , LXVIII , 17–24.
  • Liu, S. Q. , & Kozan, E. (2009). Scheduling a flow shop with combined buffer conditions. International Journal of Production Economics , 117 (2), 371–380.
  • Liu, S. Q. , & Kozan, E. (2011). Scheduling trains with priorities: a no-wait blocking parallel-machine job-shop scheduling model. Transportation Science , 45 (2), 175–198.
  • Liu, S. Q. , & Kozan, E. (2012a). An interactive planning and scheduling framework for optimising pits-to-crushers operations. Industrial Engineering and Management Systems , 11 (1), 94–102.
  • Liu, S. Q. , & Kozan, E. (2012b). A hybrid shifting bottleneck procedure algorithm for the parallel-machine job-shop scheduling problem. Journal of the Operational Research Society , 63 , 168–182.
  • Liu, S. Q. , & Kozan, E. (2016a). New graph-based algorithms to efficiently solve large scale open pit mining optimisation problems. Expert Systems with Applications , 43 , 59–65.
  • Liu, S. Q. , & Kozan, E. (2016b). Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements. Computers & Operations Research , 74 , 31–41.
  • Liu, S. Q. , & Kozan, E. (2017). A hybrid metaheuristic algorithm to optimise a real-word robotic cell. Computers & Operations Research, 84 , 188–194.
  • Modular Report . (2010). Reduce haul truck fuel consumption ( Working Paper No.). Brazil: Modular Mining Systems.
  • Mousavi, A. , Kozan, E. , & Liu, S. Q. (2016a). Open-pit block sequencing optimization : a mathematical model and solution technique. Engineering Optimization , 48 (11), 1932–1950. doi:10.1080/0305215X.2016.1142080
  • Mousavi, A. , Kozan, E. , & Liu, S. Q. (2016b). Comparative analysis of three metaheuristics for short-term open pit block sequencing. Journal of Heuristics , 22 (3), 301–329. doi:10.1007/s10732-016-9311-z
  • Myburgh, C. , & Deb, K. (2010). Evolutionary algorithms in large-scale open pit mine scheduling . In the Proceedings of the 12th annual conference on Genetic and evolutionary computation (pp. 1155–1162), Portland, Oregon, USA .
  • Newman, A. M. , Rubio, E. , & Weintraub, R. C. A. (2010). A review of operations research in mine planning. Interfaces , 40 (3), 222–245.
  • Pan, C. H. (1997). A study of integer programming formulations for scheduling problems. International Journal of Systems Science , 28 (1), 33–41.
  • Ramazan, S. (2007). The new fundamental tree algorithm for production scheduling of open pit mines. European Journal of Operational Research , 177 , 1153–1166.
  • Topal, E. , & Ramazan, S. (2012). Strategic mine planning model using network flow model and real case application. International Journal of Mining, Reclamation and Environment , 26 , 29–37.
  • Underwood, R. , & Tolwinski, B. (1998). A mathematical programming viewpoint for solving the ultimate pit problem. European Journal of Operational Research , 107 (1), 96–107.
  • Wetherelt, A. , & Van Der Wielen, K. P. (2011). Introduction to open-pit mining. In P. Darling (Ed.), SME mining engineering handbook 3rd version (pp. 857–876). Englewood, CO : Society for Mining, Metallurgy, and Exploration.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.