References
- Ahiska, S. S., & Kurtul, E. (2014). Modeling and analysis of a product substitution strategy for a stochastic manufacturing/remanufacturing system. Computers & Industrial Engineering, 72, 1–11. https://doi.org/https://doi.org/10.1016/j.cie.2014.02.015
- Atasu, A., GuideJrV. D. R., & Van Wassenhove, L. N. (2010). So what if remanufacturing cannibalizes my new product sales? California Management Review, 52(2), 56–76. https://doi.org/https://doi.org/10.1525/cmr.2010.52.2.56
- Atasu, A., Sarvary, M., & Van Wassenhove, L. N. (2008). Remanufacturing as a marketing strategy. Management Science, 54(10), 1731–1746. https://doi.org/https://doi.org/10.1287/mnsc.1080.0893
- Bahers, J. B., & Kim, J. (2018). Regional approach of waste electrical and electronic equipment (WEEE) management in France. Resources, Conservation and Recycling, 129, 45–55. https://doi.org/https://doi.org/10.1016/j.resconrec.2017.10.016
- Bayındır, Z. P., Erkip, N., & Güllü, R. (2007). Assessing the benefits of remanufacturing option under one-way substitution and capacity constraint. Computers & Operations Research, 34(2), 487–514. https://doi.org/https://doi.org/10.1016/j.cor.2005.03.010
- Bulmuş, S. C., Zhu, S. X., & Teunter, R. (2013). Capacity and production decisions under a remanufacturing strategy. International Journal of Production Economics, 145(1), 359–370. https://doi.org/https://doi.org/10.1016/j.ijpe.2013.04.052
- Chen, M., & Abrishami, P. (2014). A mathematical model for production planning in hybrid manufacturing-remanufacturing systems. The International Journal of Advanced Manufacturing Technology, 71(5-8), 1187–1196. https://doi.org/https://doi.org/10.1007/s00170-013-5538-0
- Cui, L., Wu, K. J., & Tseng, M. L. (2017). Selecting a remanufacturing quality strategy based on consumer preferences. Journal of Cleaner Production, 161, 1308–1316. https://doi.org/https://doi.org/10.1016/j.jclepro.2017.03.056
- Denizel, M., & Ferguson, M. (2009). Multiperiod remanufacturing planning with uncertain quality of inputs. IEEE Transactions on Engineering Management, 57(3), 394–404. https://doi.org/https://doi.org/10.1109/TEM.2009.2024506
- Fathi, M., Zandi, F., & Jouini, O. (2015). Modeling the merging capacity for two streams of product returns in remanufacturing systems. Journal of Manufacturing Systems, 37, 265–276. https://doi.org/https://doi.org/10.1016/j.jmsy.2014.08.006
- Franke, C., Basdere, B., Ciupek, M., & Seliger, S. (2006). Remanufacturing of mobile phones—capacity, program and facility adaptation planning. Omega, 34(6), 562–570. https://doi.org/https://doi.org/10.1016/j.omega.2005.01.016
- Georgiadis, P., Vlachos, D., & Tagaras, G. (2006). The impact of product lifecycle on capacity planning of closed-loop supply chains with remanufacturing. Production and Operations Management, 15(4), 514–527. https://doi.org/https://doi.org/10.1111/j.1937-5956.2006.tb00160.x
- Geyer, R., Van Wassenhove, L. N., & Atasu, A. (2007). The economics of remanufacturing under limited component durability and finite product life cycles. Management Science, 53(1), 88–100. https://doi.org/https://doi.org/10.1287/mnsc.1060.0600
- Giri, B. C., & Bardhan, S. (2014). Coordinating a supply chain with backup supplier through buyback contract under supply disruption and uncertain demand. International Journal of Systems Science: Operations & Logistics, 1(4), 193–204. https://doi.org/https://doi.org/10.1080/23302674.2014.951714
- GuideJr.V. D. R., & Li, J. (2010). The potential for cannibalization of new products sales by remanufactured products. Decision Sciences, 41(3), 547–572. https://doi.org/https://doi.org/10.1111/j.1540-5915.2010.00280.x
- GuideJrV. D. R., Srivastava, R., & Spencer, M. S. (1997). An evaluation of capacity planning techniques in a remanufacturing environment. International Journal of Production Research, 35(1), 67–82. https://doi.org/https://doi.org/10.1080/002075497195984
- GuideJrV. D. R., & Van Wassenhove, L. N. (2001). Managing product returns for remanufacturing. Production and Operations Management, 10(2), 142–155. https://doi.org/https://doi.org/10.1111/j.1937-5956.2001.tb00075.x
- Guo, J., & Ya, G. (2015). Optimal strategies for manufacturing/remanufacturing system with the consideration of recycled products. Computers & Industrial Engineering, 89, 226–234. https://doi.org/https://doi.org/10.1016/j.cie.2014.11.020
- Han, S., Ma, W., Zhao, L., Zhang, X., Lim, M. K., Yang, S., & Leung, S. (2016). A robust optimisation model for hybrid remanufacturing and manufacturing systems under uncertain return quality and market demand. International Journal of Production Research, 54(17), 5056–5072. https://doi.org/https://doi.org/10.1080/00207543.2016.1145815
- Hasanov, P., Jaber, M. Y., & Tahirov, N. (2019). Four-level closed loop supply chain with remanufacturing. Applied Mathematical Modelling, 66, 141–155. https://doi.org/https://doi.org/10.1016/j.apm.2018.08.036
- Inderfurth, K. (2004). Optimal policies in hybrid manufacturing/remanufacturing systems with product substitution. International Journal of Production Economics, 90(3), 325–343. https://doi.org/https://doi.org/10.1016/S0925-5273(02)00470-X
- Karakayali, I., Emir-Farinas, H., & Akcali, E. (2007). An analysis of decentralized collection and processing of end-of-life products. Journal of Operations Management, 25(6), 1161–1183. https://doi.org/https://doi.org/10.1016/j.jom.2007.01.017
- Karimabadi, K., Arshadi-khamseh, A., & Naderi, B. (2020). Optimal pricing and remanufacturing decisions for a fuzzy dual-channel supply chain. International Journal of Systems Science: Operations & Logistics, 7(3), 248–261. https://doi.org/https://doi.org/10.1080/23302674.2019.1570381
- Kerr, W., & Ryan, C. (2001). Eco-efficiency gains from remanufacturing: A case study of photocopier remanufacturing at Fuji Xerox Australia. Journal of Cleaner Production, 9(1), 75–81. https://doi.org/https://doi.org/10.1016/S0959-6526(00)00032-9
- Krystofik, M., Luccitti, A., Parnell, K., & Thurston, M. (2018). Adaptive remanufacturing for multiple lifecycles: A case study in office furniture. Resources, Conservation and Recycling, 135, 14–23. https://doi.org/https://doi.org/10.1016/j.resconrec.2017.07.028
- Li, Y., Chen, J., & Cai, X. (2006). Uncapacitated production planning with multiple product types, returned product remanufacturing, and demand substitution. OR Spectrum, 28(1), 101–125. https://doi.org/https://doi.org/10.1007/s00291-005-0012-5
- Li, Y., Chen, J., & Cai, X. (2007). Heuristic genetic algorithm for capacitated production planning problems with batch processing and remanufacturing. International Journal of Production Economics, 105(2), 301–317. https://doi.org/https://doi.org/10.1016/j.ijpe.2004.11.017
- Liao, H., & Deng, Q. (2018). EES-EOQ model with uncertain acquisition quantity and market demand in dedicated or combined remanufacturing systems. Applied Mathematical Modelling, 64, 135–167. https://doi.org/https://doi.org/10.1016/j.apm.2018.07.026
- Liao, H., & Li, L. (2020). Environmental sustainability EOQ model for closed-loop supply chain under market uncertainty: A case study of printer remanufacturing. Computers & Industrial Engineering, Article 106525. https://doi.org/https://doi.org/10.1016/j.cie.2020.106525
- Liu, H., Lei, M., Deng, H., Leong, G. K., & Huang, T. (2016). A dual channel, quality-based price competition model for the WEEE recycling market with government subsidy. Omega, 59, 290–302. https://doi.org/https://doi.org/10.1016/j.omega.2015.07.002
- Low, J. S. C., & Ng, Y. T. (2018). Improving the economic performance of remanufacturing systems through flexible design strategies: A case study based on remanufacturing laptop computers for the Cambodian market. Business Strategy and the Environment, 27(4), 503–527. https://doi.org/https://doi.org/10.1002/bse.2017
- Macedo, P. B., Alem, D., Santos, M., Junior, M. L., & Moreno, A. (2016). Hybrid manufacturing and remanufacturing lot-sizing problem with stochastic demand, return, and setup costs. The International Journal of Advanced Manufacturing Technology, 82(5-8), 1241–1257. https://doi.org/https://doi.org/10.1007/s00170-015-7445-z
- Mitra, S. (2016). Optimal pricing and core acquisition strategy for a hybrid manufacturing/remanufacturing system. International Journal of Production Research, 54(5), 1285–1302. https://doi.org/https://doi.org/10.1080/00207543.2015.1067376
- Pineyro, P., & Viera, O. (2010). The economic lot-sizing problem with remanufacturing and one-way substitution. International Journal of Production Economics, 124(2), 482–488. https://doi.org/https://doi.org/10.1016/j.ijpe.2010.01.007
- Polotski, V., Kenne, J. P., & Gharbi, A. (2019). Joint production and maintenance optimization in flexible hybrid manufacturing–remanufacturing systems under age-dependent deterioration. International Journal of Production Economics, 216, 239–254. https://doi.org/https://doi.org/10.1016/j.ijpe.2019.04.023
- Radhi, M., & Zhang, G. (2016). Optimal configuration of remanufacturing supply network with return quality decision. International Journal of Production Research, 54(5), 1487–1502. https://doi.org/https://doi.org/10.1080/00207543.2015.1086034
- Rani, S., Ali, R., & Agarwal, A. (2020). Fuzzy inventory model for new and refurbished deteriorating items with cannibalisation in green supply chain. International Journal of Systems Science: Operations & Logistics, 1–17. https://doi.org/https://doi.org/10.1080/23302674.2020.1803434
- Rathore, P., Kota, S., & Chakrabarti, A. (2011). Sustainability through remanufacturing in India: A case study on mobile handsets. Journal of Cleaner Production, 19(15), 1709–1722. https://doi.org/https://doi.org/10.1016/j.jclepro.2011.06.016
- Saavedra, Y. M., Barquet, A. P., Rozenfeld, H., Forcellini, F. A., & Ometto, A. R. (2013). Remanufacturing in Brazil: Case studies on the automotive sector. Journal of Cleaner Production, 53, 267–276. https://doi.org/https://doi.org/10.1016/j.jclepro.2013.03.038
- Sabbaghnia, A., & Taleizadeh, A. A. (2020). Quality, buyback and technology licensing considerations in a two-period manufacturing–remanufacturing system: A closed-loop and sustainable supply chain. International Journal of Systems Science: Operations & Logistics, 1–18. https://doi.org/https://doi.org/10.1080/23302674.2020.1716095
- Sasikumar, P., Kannan, G., & Haq, A. N. (2010). A multi-echelon reverse logistics network design for product recovery—a case of truck tire remanufacturing. The International Journal of Advanced Manufacturing Technology, 49(9-12), 1223–1234. https://doi.org/https://doi.org/10.1007/s00170-009-2470-4
- Simpson, V. P. (1978). Optimum solution structure for a repairable inventory problem. Operations Research, 26(2), 270–281. https://doi.org/https://doi.org/10.1287/opre.26.2.270
- Singh, H., & Jain, P. K. (2019). Economic analysis of remanufacturing of engine valves-a case study. Journal of Remanufacturing, 9(1), 51–60. https://doi.org/https://doi.org/10.1007/s13243-018-0055-9
- Su, C., & Xu, A. (2014). Buffer allocation for hybrid manufacturing/remanufacturing system considering quality grading. International Journal of Production Research, 52(5), 1269–1284. https://doi.org/https://doi.org/10.1080/00207543.2013.828165
- Sun, H., Chen, W., Liu, B., & Chen, X. (2018). Economic lot scheduling problem in a remanufacturing system with returns at different quality grades. Journal of Cleaner Production, 170, 559–569. https://doi.org/https://doi.org/10.1016/j.jclepro.2017.09.184
- Teunter, R., GuideJr.D., & van Wassenhove, L. (2003). Matching supply and demand to maximize profits from remanufacturing. Operations Management: Covering Transaction Processing Issues Before They Clear and Settle, 303–316.
- Tseng, M. L., Wong, W. P., & Soh, K. L. (2018). An overview of the substance of Resource, Conservation and recycling. Resources, Conservation and Recycling, 136, 367–375. https://doi.org/https://doi.org/10.1016/j.resconrec.2018.05.010
- Van Wassenhove, L. N., & Zikopoulos, C. (2010). On the effect of quality overestimation in remanufacturing. International Journal of Production Research, 48(18), 5263–5280. https://doi.org/https://doi.org/10.1080/00207540903150585
- Vlachos, D., Georgiadis, P., & Iakovou, E. (2007). A system dynamics model for dynamic capacity planning of remanufacturing in closed-loop supply chains. Computers & Operations Research, 34(2), 367–394. https://doi.org/https://doi.org/10.1016/j.cor.2005.03.005
- Wang, Y., Chang, X., Chen, Z., Zhong, Y., & Fan, T. (2014). Impact of subsidy policies on recycling and remanufacturing using system dynamics methodology: A case of auto parts in China. Journal of Cleaner Production, 74, 161–171. https://doi.org/https://doi.org/10.1016/j.jclepro.2014.03.023
- Wei, S., Tang, O., & Liu, W. (2015). Refund policies for cores with quality variation in OEM remanufacturing. International Journal of Production Economics, 170, 629–640. https://doi.org/https://doi.org/10.1016/j.ijpe.2014.12.006
- Yang, C. H., Wang, J., & Ji, P. (2015). Optimal acquisition policy in remanufacturing under general core quality distributions. International Journal of Production Research, 53(5), 1425–1438. https://doi.org/https://doi.org/10.1080/00207543.2014.944283
- Zhu, Q., & Tian, Y. (2016). Developing a remanufacturing supply chain management system: A case of a successful truck engine remanufacturer in China. Production Planning & Control, 27(9), 708–716. https://doi.org/https://doi.org/10.1080/09537287.2016.1166282
- Zikopoulos, C. (2017). Remanufacturing lotsizing with stochastic lead-time resulting from stochastic quality of returns. International Journal of Production Research, 55(6), 1565–1587. https://doi.org/https://doi.org/10.1080/00207543.2016.1150616