63
Views
0
CrossRef citations to date
0
Altmetric
Research Article

Effectiveness of lead-time management in a sustainable supply chain under intuitionistic fuzzy environment: analytical and metaheuristic optimisation approach

&
Article: 2252325 | Received 04 Jul 2022, Accepted 21 Aug 2023, Published online: 19 Sep 2023

References

  • Arıkan, E., Fichtinger, J., & Ries, J. M. (2014). Impact of transportation lead-time variability on the economic and environmental performance of inventory systems. International Journal of Production Economics, 157, 279–288. https://doi.org/10.1016/j.ijpe.2013.06.005
  • Asadkhani, J., Fallahi, A., & Mokhtari, H. (2022). A sustainable supply chain under VMI-CS agreement with withdrawal policies for imperfect items. Journal of Cleaner Production, 376, 134098. https://doi.org/10.1016/j.jclepro.2022.134098
  • Bazan, E., Jaber, M. Y., & El Saadany, A. M. (2015a). Carbon emissions and energy effects on manufacturing– remanufacturing inventory models. Computers & Industrial Engineering, 88, 307–316. https://doi.org/10.1016/j.cie.2015.07.002
  • Bazan, E., Jaber, M. Y., & Zanoni, S. (2015b). Supply chain models with greenhouse gases emissions, energy usage and different coordination decisions. Applied Mathematical Modelling, 39(17), 5131–5151. https://doi.org/10.1016/j.apm.2015.03.044
  • Castellano, D., Gallo, M., Grassi, A., & Santillo, L. C. (2019). The effect of GHG emissions on production, inventory replenishment and routing decisions in a single vendor-multiple buyers supply chain. International Journal of Production Economics, 218, 30–42. https://doi.org/10.1016/j.ijpe.2019.04.010
  • Dey, B. K., Bhuniya, S., & Sarkar, B. (2021). Involvement of controllable lead time and variable demand for a smart manufacturing system under a supply chain management. Expert Systems with Applications, 184, 115464. https://doi.org/10.1016/j.eswa.2021.115464
  • Dey, B. K., Sarkar, B., & Pareek, S. (2019). A two-echelon supply chain management with setup time and cost reduction, quality improvement and variable production rate. Mathematics, 7(4), 328. https://doi.org/10.3390/math7040328
  • Enginoǧlu, S., & Arslan, B. (2020). Intuitionistic fuzzy parameterized intuitionistic fuzzy soft matrices and their application in decision-making. Computational and Applied Mathematics, 39(1), 1–20. https://doi.org/10.1007/s40314-019-0964-8
  • Giri, S. K., Garai, T., Garg, H., & Islam, S. (2021). Possibilistic mean of generalized non-linear intuitionistic fuzzy number to solve a price and quality dependent demand multi-item inventory model. Computational and Applied Mathematics, 40(4), 1–24. https://doi.org/10.1007/s40314-021-01497-4
  • Glock, C. H. (2012). Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand. International Journal of Production Economics, 136(1), 37–44. https://doi.org/10.1016/j.ijpe.2011.09.007
  • Gupta, R. K., Bhunia, A. K., & Goyal, S. K. (2009). An application of genetic algorithm in solving an inventory model with advance payment and interval valued inventory costs. Mathematical and Computer Modelling, 49(5-6), 893–905. https://doi.org/10.1016/j.mcm.2008.09.015
  • Hooshangi-Tabrizi, P., Doulabi, H. H., Contreras, I., & Bhuiyan, N. (2022). Two-stage robust optimization for perishable inventory management with order modification. Expert Systems With Applications, 193, 116346. https://doi.org/10.1016/j.eswa.2021.116346
  • Hovelaque, V., & Bironneau, L. (2015). The carbon-constrained EOQ model with carbon emission dependent demand. International Journal of Production Economics, 164, 285–291. https://doi.org/10.1016/j.ijpe.2014.11.022
  • Karthick, B., & Uthayakumar, R. (2021a). Optimizing an imperfect production model with varying setup cost, price discount, and lead time under fuzzy demand. Process Integration and Optimization for Sustainability, 5(1), 13–29. https://doi.org/10.1007/s41660-020-00133-8
  • Karthick, B., & Uthayakumar, R. (2021b). A multi-item sustainable manufacturing model with discrete setup cost and carbon emission reduction under deterministic and trapezoidal fuzzy demand. Process Integration and Optimization for Sustainability, 5(3), 505–543. https://doi.org/10.1007/s41660-021-00159-6
  • Karthick, B., & Uthayakumar, R. (2021c). An imperfect production model with energy consumption, GHG emissions and fuzzy demand under a sustainable supply chain. International Journal of Sustainable Engineering, 14(3), 318–342. https://doi.org/10.1080/19397038.2021.1915407
  • Karthick, B., & Uthayakumar, R. (2022a). A closed-loop supply chain model with carbon emission and pricing decisions under an intuitionistic fuzzy environment. Environment, Development and Sustainability, 1–49. https://doi.org/10.1007/s10668-022-02631-w
  • Karthick, B., & Uthayakumar, R. (2022b). A two-tier supply chain model under two distributions with MTTF, rework, variable production rate and lead time. Journal of Management Analytics, 9(4), 532–558. https://doi.org/10.1080/23270012.2022.2051153
  • Maiti, M. K., & Maiti, M. (2007). Two-storage inventory model with lot-size dependent fuzzy lead-time under possibility constraints via genetic algorithm. European Journal of Operational Research, 179(2), 352–371. https://doi.org/10.1016/j.ejor.2006.03.029
  • Marchi, B., Zanoni, S., Zavanella, L. E., & Jaber, M. Y. (2019). Supply chain models with greenhouse gases emissions, energy usage, imperfect process under different coordination decisions. International Journal of Production Economics, 211, 145–153. https://doi.org/10.1016/j.ijpe.2019.01.017
  • Ouyang, L. Y., Wu, K. S., & Ho, C. H. (2007). An integrated vendor–buyer inventory model with quality improvement and lead time reduction. International Journal of Production Economics, 108(1-2), 349–358. https://doi.org/10.1016/j.ijpe.2006.12.019
  • Paul, A., Pervin, M., Roy, S. K., Maculan, N., & Weber, G. W. (2022). A green inventory model with the effect of carbon taxation. Annals of Operations Research, 309(1), 233–248. https://doi.org/10.1007/s10479-021-04143-8
  • Qin, Q., Liang, F., Li, L., Chen, Y. W., & Yu, G. F. (2017). A TODIM-based multi-criteria group decision making with triangular intuitionistic fuzzy numbers. Applied Soft Computing, 55, 93–107. https://doi.org/10.1016/j.asoc.2017.01.041
  • Sarkar, B., Guchhait, R., Sarkar, M., Pareek, S., & Kim, N. (2019). Impact of safety factors and setup time reduction in a two-echelon supply chain management. Robotics and Computer-Integrated Manufacturing, 55, 250–258. https://doi.org/10.1016/j.rcim.2018.05.001
  • Sarkar, B., & Mahapatra, A. S. (2017). Periodic review fuzzy inventory model with variable lead time and fuzzy demand. International Transactions in Operational Research, 24(5), 1197–1227. https://doi.org/10.1111/itor.12177
  • Sarkar, B., Majumder, A., Sarkar, M., Kim, N., & Ullah, M. (2018). Effects of variable production rate on quality of products in a single-vendor multi-buyer supply chain management. The International Journal of Advanced Manufacturing Technology, 99(1-4), 567–581. https://doi.org/10.1007/s00170-018-2527-3
  • Sarkar, B., Omair, M., & Kim, N. (2020). A cooperative advertising collaboration policy in supply chain management under uncertain conditions. Applied Soft Computing, 88, 105948. https://doi.org/10.1016/j.asoc.2019.105948
  • Sarkar, S., Tiwari, S., & Giri, B. C. (2022). Impact of uncertain demand and lead-time reduction on two-echelon supply chain. Annals of Operations Research, 315(2), 2027–2055. https://doi.org/10.1007/s10479-021-04105-0
  • Tarhini, H., Karam, M., & Jaber, M. Y. (2020). An integrated single-vendor multi-buyer production inventory model with transshipments between buyers. International Journal of Production Economics, 225, 107568. https://doi.org/10.1016/j.ijpe.2019.107568
  • Tirkolaee, E. B., & Aydin, N. S. (2022). Integrated design of sustainable supply chain and transportation network using a fuzzy bi-level decision support system for perishable products. Expert Systems with Applications, 195, 116628. https://doi.org/10.1016/j.eswa.2022.116628
  • Turan, H. H., Kosanoglu, F., & Atmis, M. (2021). A multi-skilled workforce optimisation in maintenance logistics networks by multi-thread simulated annealing algorithms. International Journal of Production Research, 59(9), 2624–2646. https://doi.org/10.1080/00207543.2020.1735665
  • Uthayakumar, R., & Karthick, B. (2023). Analysis of several reduction strategies on a two-echelon sustainable supply chain model with triangular fuzzy demand. OPSEARCH, 60(1), 393–419. https://doi.org/10.1007/s12597-022-00610-3
  • Valentini, G., & Zavanella, L. (2003). The consignment stock of inventories: Industrial case and performance analysis. International Journal of Production Economics, 81-82, 215–224. https://doi.org/10.1016/S0925-5273(02)00300-6
  • Yi, H., & Sarker, B. R. (2013a). An optimal consignment stock production and replenishment policy with controllable lead time. International Journal of Production Research, 51(21), 6316–6335. https://doi.org/10.1080/00207543.2013.795668
  • Yi, H., & Sarker, B. R. (2013b). An operational policy for an integrated inventory system under consignment stock policy with controllable lead time and buyers' space limitation. Computers & Operations Research, 40(11), 2632–2645. https://doi.org/10.1016/j.cor.2013.05.001
  • Zanoni, S., Mazzoldi, L., & Jaber, M. Y. (2014). Vendor-managed inventory with consignment stock agreement for single vendor–single buyer under the emission-trading scheme. International Journal of Production Research, 52(1), 20–31. https://doi.org/10.1080/00207543.2013.812812
  • Zavanella, L., & Zanoni, S. (2009). A one-vendor multi-buyer integrated production-inventory model: The ‘Consignment Stock’ case. International Journal of Production Economics, 118(1), 225–232. https://doi.org/10.1016/j.ijpe.2008.08.044

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.