Causes of delay in residential construction projects in Cambodia

ORCID Icon, ORCID Icon & ORCID Icon | (Reviewing Editor)
Article: 1291117 | Received 03 Oct 2016, Accepted 31 Jan 2017, Published online: 20 Feb 2017

References

  • Abd El-Razek, M., Bassioni, H., & Mobarak, A. (2008). Causes of Delay in Building Construction Projects in Egypt. Journal of Construction Engineering Management, 134, 831–841. doi:10.1061/(ASCE)0733-9364(2008)134:11(831)
  • Al-Kharashi, A., & Skitmore, M. (2009). Causes of delays in Saudi Arabian public sector construction projects. Construction Management and Economics, 27, 3–23.10.1080/01446190802541457
  • Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24, 349–357. doi:10.1016/j.ijproman.2005.11.010
  • Austin, S. A., Baldwin, A. N., & Steele, J. L. (2002). Improving building design through integrated planning and control. Engineering, Construction and Architectural Management, 9, 249–258.10.1108/eb021220
  • Aziz, R. F. (2013). Factors causing cost variation for constructing wastewater projects in Egypt. Alexandria Engineering Journal, 52, 51–66.10.1016/j.aej.2012.11.004
  • Bronh, S., Cawdu, C., & Choeung, T. (2012). OSH status report – Cambodia. Asia Monitor Resource Centre. Retrieved August 12, 2016, from http://www.amrc.org.hk/sites/default/files/Cambodia_1.pdf
  • Council for the Development of Cambodia [CDC]. (2015). Cambodia Industrial Development Policy CIDP 2015-2025. October 6th. Retrieved April 4, 2016, from http://eurocham-cambodia.org/uploads/6a5ac-h.e.-mr.-sok-chenda-sophea-presentation.pdf
  • Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30, 479–489. doi:10.1016/j.ijproman.2011.10.004
  • Durdyev, S., & Ismail, S. (2012). Role of the construction sector in the economic development of Turkmenistan’. EEST Part A: Energy, Science and Research, 29, 883–890.
  • Durdyev, S., & Ismail, S. (2016). On-site construction productivity in Malaysian infrastructure projects. Structural Survey, 34, 446–462. doi:10.1108/SS-12-2015-0058
  • Durdyev, S., & Mbachu, J. (2011). On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Australasian Journal of Construction Economics and Building, 11, 18–33. doi:10.5130/AJCEB.v11i3.2120
  • Durdyev, S., Omarov, M., & Ismail, S. (2016, November 9–10). SWOT Analysis of the Cambodian construction industry within the ASEAN economic community, Proceedings of the 28th International Business Information Management Association Conference, Seville.
  • Enshassi, A., & Ayyash, A. (2014). Factors affecting cost contingency in the construction industry – Contractors’ perspective. International Journal of Construction Management, 14, 215–239. doi:10.1080/15623599.2014.922729
  • Farooqui, R., Farrukh, A., & Rafeequi, A. (2008, August 4–5). Safety performance in construction industry of Pakistan, Proceedings of the 1st International Conference on Construction in the Developing Countries (ICCIDC-I), Karachi.
  • Fellows, R., & Liu, A. (2008). Research methods for construction (3rd ed.). Chichester: Wiley-Blackwell.
  • Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overrun in construction of groundwater projects in a developing countries. Ghana as a case study, International Journal of Project Management, 21, 321–326. doi:10.1016/S0263-7863(02)00055-8
  • Fugar, F. D. K., & Agyakwah-Baah, A. B. (2010). Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, 10, 103–116. doi:10.5130/AJCEB.v10i1-2.1592
  • George, D., & Mallery, P. (2003). SPSS for windows step by step: A simple guide and reference (4th ed.). Boston, MA: Allyn and Bacon.
  • Haseeb, M., Xinhai-Lu, Bibi, A., Maloof-ud-Dyian, & Rabbani, W. (2011). Problems of projects and effects of delays in the construction industry of Pakistan. Australian Journal of Business and Management Research, 1, 41–50.
  • Iyer, K. C., & Jha, K. N. (2005). Factors affecting cost performance: Evidence from Indian construction projects. International Journal of Project Management, 23, 283–295. doi:10.1016/j.ijproman.2004.10.003
  • Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27, 522–531. doi:10.1016/j.ijproman.2008.07.003
  • Kazaz, A., Ulubeyli, S., & Tuncbilekli, N. A. (2012). Causes of delays in construction projects in Turkey. Journal of Civil Engineering and Management., 18, 426–435.10.3846/13923730.2012.698913
  • Kikwasi, G. J. (2012). Causes and effects of delays and disruptions in construction projects in Tanzania. Australasian Journal of Construction Economics and Building, Conference Series, 1, 52–59.
  • Lindhard, S., & Wandahl, S. (2014). Scheduling of large, complex, and constrained construction projects – an exploration of LPS application. International Journal of Project Organisation and Management, 6, 237–253. doi:10.1504/IJPOM.2014.065258
  • Love, P. E., Holt, G. D., Shen, L. Y., Li, H., & Irani, Z. (2002). Using systems dynamics to better understand change and rework in construction project management systems. International Journal of Project Management, 20, 425–436.10.1016/S0263-7863(01)00039-4
  • Mahamid, I., Bruland, A., & Dmaidi, N. (2012). Causes of delay in road construction projects. Journal of Management in Engineering, 28, 300–310.10.1061/(ASCE)ME.1943-5479.0000096
  • Mbachu, J. (2011). Sources of contractor’s payment risks and cash flow problems in the New Zealand construction industry: Project team’s perceptions of the risks and mitigation measures. Construction Management and Economics, 29, 1027–1041. doi:10.1080/01446193.2011.623708
  • Miller, D. (1991). Handbook of research design and social measurement. Riverside County, CA: Sage.
  • Miterev, M., & Nedelcu, R. (2011). The nature of the relationship between project complexity and project delay: Case study of ERP system implementation projects (Master thesis). Umea School of Business and Economics. Retrieved August 21, 2016, from http://www.projektakademien.se/pa/wp-content/uploads/2014/04/1.-Master-Thesis_2012_Miterev-and-Nedelcu.pdf
  • Noun, V., & Serrano, M. (2010). Building unions in Cambodia: History, challenges, strategies. Singapore & Phnom Penh: Friedrich Ebert Stiftung & Sunway.
  • Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management., 20, 67–73.10.1016/S0263-7863(00)00037-5
  • Odeyinka, H., & Yusif, A. (1997). The causes and effects of construction delays on completion cost of housing projects in Nigeria. Journal of Financial Management of Property and Construction, 2, 31–44.
  • Ogunlana, S. O., Promkuntong, K., & Jearkjirm, V. (1996). Construction delays in a fast-growing economy: Comparing Thailand with other economies. International Journal of Project Management, 14, 37–45. doi:10.1016/0263-7863(95)00052-6
  • Orangi, A., Palaneeswaran, E., & Wilson, J. (2011). Exploring delays in Victoria-based Astralian pipeline projects. Procedia Engineering, 14, 874–881.10.1016/j.proeng.2011.07.111
  • Owolabi, J. D., Amusan, L. M., Oloke, C. O., Olusanya, O., Tunji-Olayeni, P., Owolabi, D., & Omuh, I. (2014). Causes and effect of delay on project construction delivery time. International Journal of Education and Research, 2, 197–208.
  • Ren, Z., Atout, M., & Jones, J. (2008). Root causes of construction project delays in Dubai. In A. Dainty (Ed.), Procs 24th Annual ARCOM Conference, 1–3 September 2008 (pp. 749–757). Cardiff: Association of Researchers in Construction Management.
  • Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25, 517–526. doi:10.1016/j.ijproman.2006.11.007
  • Santoso, D., & Soeng, S. (2016). Analyzing delays of road construction projects in Cambodia: Causes and effects. Journal of Management in Engineering. doi:10.1061/(ASCE)ME.1943-5479.0000467
  • Songer, A. D., & Molenaar, K. R. (1997). Project characteristics for successful public-sector design-build. Journal of Construction Engineering and Management, 123, 34–40.10.1061/(ASCE)0733-9364(1997)123:1(34)
  • Ssegawa, J. K., Mfolwe, K. M., Makuke, B., & Kutua, B. (2003). Construction variations: A scourge or a necessity? Proceedings: The 1st CIB-W107 International Conference on Creating a Sustainable Construction Industry in Developing Countries, Cape Town. Retrieved from www.odsf.co.za/cdcproc/docs/3rd/ssegawa_jk_mfolwe_km.pdf
  • Sunjka, B. P., & Jacob, U. (2013). Significant causes and effects of project delays in the Niger delta region. Cape Town: SAIIE25 Proceedings: Stellenbosch, South Africa © 2013 SAIIE.
  • Tam, C. M., Zeng, S. X., & Deng, Z. M. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42, 569–586.10.1016/j.ssci.2003.09.001
  • Tavakol, M., & Dennick, R. (2011). Making sense of Cronbach’s alpha. International Journal of Medical Education, 2, 53–55. doi:10.5116/ijme.4dfb.8dfd
  • Zack, J. G. (2003). Schedule delay analysis; is there agreement? Proceedings of PMI-CPM College of Performance Spring Conference. May 7–9, 2003. New Orleans: Project Management Institute—College of Performance Management.