3,334
Views
16
CrossRef citations to date
0
Altmetric
Research Article

As built case studies for BIM as conflicts detection and documentation tool

ORCID Icon & ORCID Icon | (Reviewing Editor)
Article: 1411865 | Received 22 Sep 2017, Accepted 27 Nov 2017, Published online: 12 Dec 2017

References

  • Abd, A. M., & Abd, S. M. (2012). Resources sustainability planning model using hierarchical approach for construction project. Diyala Journal of Engineering Services, 5(2), 1–19.
  • Abd, A. M., & Abd, S. M. (2014). Neuro-fuzzy model to evaluate ready-mix concrete properties. International Journal of Engineering Research and Science & Technology, 3(1), 24–33.
  • Abd, S. M., Abd, A. M., Zain, M. F. M., & Ismail, A. (2008). Development of productivity assessment methodology for concreting process. ARPN Journal of Engineering and Applied Sciences, 3(5), 1–7.
  • Babic, N. C., & Rebolj, D. (2016). Culture change in construction industry: From 2D toward BIM based construction. Journal of Information Technology in Construction (ITcon), 21, 86–99. Retrieved from http://www.itcon.org/2016/6
  • Chong, H. Y., Lee, C. Y., & Wang, X. (2017). A mixed review of the adoption of Building Information Modelling (BIM) for sustainability. Journal of Cleaner Production, 142, 4114–4126. doi:10.1016/j.jclepro.2016.09.222
  • Eastman, C. M., Eastman, C., Teicholz, P., & Sacks, R. (2008). BIM handbook: A guide to BIM for owners, managers, designers, engineers and contractors. Wiley. ISBN 978-0-470-18528-5.
  • Elmualim, A., & Gilder, J. (2014). BIM: Innovation in design management, influence and challenges of implementation. Architectural Engineering and Design Management, 10(3–4), 183–199. doi:10.1080/17452007.2013.821399
  • Habibi, S. (2017, October). The promise of BIM for improving building performance. Energy and Buildings, 153(15), 525–548. doi:10.1016/j.enbuild.2017.08.009
  • Khan, E. A., Dewan, M. N. A., & Chowdhury, M. M. H. (2016). Reflective or formative measurement model of sustainability factor? A three industry comparison. Corporate Ownership and Control, 13(2), 83–92.
  • Love, P. E., Irani, Z., & Edwards, D. J. (2004). A rework reduction model for construction projects. IEEE Transactions on Engineering Management, 51(4), 426–440.
  • Nepal, M. P., & Staub-French, S. (2016). Supporting knowledge-intensive construction management tasks in BIM. Journal of Information Technology in Construction (ITcon), 21, 13–38. Retrieved from http://www.itcon.org/2016/2
  • Park, J., Chen, J., & Cho, Y. K. (2017). Self-corrective knowledge-based hybrid tracking system using BIM and multimodal sensors. Advanced Engineering Informatics, 32, 126–138.
  • Plebankiewicz, E., Zima, K., & Skibniewski, M. (2015). Analysis of the first polish BIM-based cost estimation application. Procedia Engineering, 123, 405–414. doi:10.1016/j.proeng.2015.10.064
  • Smith, M. (2009). Curating architectural 3D CAD models. International Journal of Digital Curation, 4(1), 98–106.
  • Tauriainen, M. K., Puttonen, J. A., & Saari, A. J. (2015). The assessment of constructability: BIM cases, ITcon. In Special issue ECPPM 2014 - 10th European Conference on Product and Process Modelling (Vol. 20, pp. 51–67). Retrieved from http://www.itcon.org/2015/4
  • Wong, J., & Zhou, J. (2015). Enhancing environmental sustainability over building life cycles through green BIM: A review. Automation in Construction, 57, 156–165. doi:10.1016/j.autcon.2015.06.003
  • Wu, C., Xu, B., Mao, C., & Li, X. (2017). Overview of BIM maturity measurement tools. Journal of Information Technology in Construction (ITcon), 22, 34–62. Retrieved from http://www.itcon.org/2017/3
  • Zadeh, P. A., Wang, G., Cavka, H. B., Staub-French, S., & Pottinger, R. (2017). Information quality assessment for facility management. Advanced Engineering Informatics, 33, 181–205.