2,480
Views
9
CrossRef citations to date
0
Altmetric
Research Article

Risk assessment and allocation in the contract for public works used in Saudi Arabia construction industry

, ORCID Icon, , & | (Reviewing editor)
Article: 1490148 | Received 10 Feb 2018, Accepted 08 Jun 2018, Published online: 11 Jul 2018

References

  • Al Sabah, R. (2014) Evaluating the Impact of Construction Risks on Project Success in the Arabian Gulf Region (AGR) Construction Industry from the Perspective of Multinational Firms . The University of Wisconsin-Madison.
  • Al Salman, A. (2004) Assessment of risk management perceptions and practices of construction contractors in Saudi Arabi ( Master Thesis). King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia.
  • Al-Barghouthi, M. (1994) Liability allocation among the parties of fixed-price construction contractors in Saudi Arabia ( Master Thesis). King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
  • Assaf, S. (1982) A systematic approach to the selection of a risk retention level for construction insurance ( PhD thesis). University of Illinois at Urbana-Champaign.
  • Bubshait, A. A. , & Almohawis, S. A. (1994). Evaluating the general conditions of a construction contract. International Journal of Project Management , 12(3), 133–136. doi:10.1016/0263-7863(94)90027-2
  • Charoenngam, C. , & Yeh, C. Y. (1999). Contractual risk and liability sharing in hydropower construction. International Journal of Project Management , 17(1), 29–37. doi:10.1016/S0263-7863(97)00064-1
  • Chui, K. W. , & Bai, Y. (2010). Comparison of contract general conditions between United States and China. Journal of Architectural Engineering , 16(4), 119–125. doi:10.1061/(ASCE)AE.1943-5568.0000020
  • EJCDC . (2015). Engineers joint contract documents committee (EJCDC) . Madison.
  • El-Sayegh, S. M. (2008). Risk assessment and allocation in the UAE construction industry. International Journal of Project Management , 26(4), 431–438. doi:10.1016/j.ijproman.2007.07.004
  • El-Sayegh, S. M. , & Mansour, M. H. (2015). Risk assessment and allocation in highway construction projects in the UAE. Journal of Management in Engineering , 31(6), 04015004. doi:10.1061/(ASCE)ME.1943-5479.0000365
  • Erikson, C. A. (1979). Risk sharing in construction contracts . Urbana-champaign: University of Illinois, Urbana-Champaign.
  • Fisk, E. R. , & Reynolds, W. D. (2010). Construction project administration (9th ed.). Pearson Prentice Hall.
  • Hadidi, L. A. , & Alkhaldi, A. F. (2016, December). Reliability improvement for electrical pneumatic arm loading system. In Industrial Engineering and Engineering Management (IEEM), 2016 IEEE International Conference on (pp. 531–535). IEEE.
  • Husein, A. T. (2014). Construction and projects in Saudi Arabia: Overview. Practice Law , Multi-Jurisdictional Guide 2013/14.
  • Kalin, M. , Weygant, R. S. , Rosen, H. J. , & Regener, J. R. (2010). Construction specifications writing: Principles and procedures (6th ed.). USA: Wiley Professional Development (P&T).
  • Kangari, R. (1995). Risk management perceptions and trends of U.S construction. Journal of Construction Engineering and Management , 121(4), 422–429. doi:10.1061/(ASCE)0733-9364(1995)121:4(422)
  • Khaliluddin, M. (2010) Contract risk allocation in Saudi Arabian construction projects ( Master Thesis). King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia
  • Liu, J. , Zhao, X. , & Yan, P. (2016). Risk paths in international construction projects: Case study from Chinese contractors. Journal of Construction Engineering and Management , 142(6), 05016002. doi:10.1061/(ASCE)CO.1943-7862.0001116
  • NCB . (2016a). NCB quarterly review of contract awards in the construction sector, NCB construction contracts index first quarter 2016 . Retrieved June 20, 2005, from http://www.alahli.com/ar-sa/about-us/Documents/NCB-Construction-Contracts-Index-1Q-2016.pdf
  • NCB . (2016b) NCB quarterly review of contract awards in the construction sector, NCB construction contracts index second quarter 2016 . Retrieved August 1, 2016 from http://www.alahli.com/en-us/Documents/NCB-Construction-Contracts-Index-Q2-2016.pdf
  • Pratap, S. , Kumar, M. , Cheikhrouhou, N. , & Tiwari, M. K. (2015, December). The robust quay crane allocation for a discrete bulk material handling port. In Industrial Engineering and Engineering Management (IEEM), 2015 IEEE International Conference on (pp. 1174–1178). IEEE.
  • The Unified Contract for Public Works . (2011). Riyadh: Ministry of Finance, Saudi Arabia.