13,863
Views
26
CrossRef citations to date
0
Altmetric
Research Article

Minimizing waste using lean manufacturing and ECRS principle in Indonesian furniture industry

ORCID Icon, & ORCID Icon | (Reviewing editor)
Article: 1567019 | Received 17 May 2018, Accepted 06 Jan 2019, Published online: 22 Jan 2019

References

  • Asosiasi Mebel dan Kerajinan Indonesia (AMKRI). (2015). Roadmap Industri Mebel dan Kerajinan Indonesia “Target Pencapaian Ekspor 5 Milyar USD” [Roadmap of Indonesian furniture and handicraft industry “Target of export achievement 5 billion USD”]. Jakarta: AMKRI.
  • Barnes, R. M. (1980). Motion and time study design and measurement of work. 7th ed. Singapore: John Wiley & Sons.
  • Chowdhury, A. H., Shahriar, S., Hossen, T., & Mahmud, P. (2017). Reduction of process lead time using lean tool-value stream mapping (vsm). Applied Mechanics and Materials, 860, 74-80. doi:10.4028/www.scientific.net/AMM.860.74
  • Eatock, J., Dixon, D., & Young, T. (2009). An exploratory survey of current practice in the medical device industry. Journal of Manufacturing Technology Management, 20, 218–13. doi:10.1108/17410380910929637
  • Helleno, A. L., Isaias de Moraes, A. J., & Simon, A. T. (2017). Integrating sustainability indicators and Lean manufacturing to assess manufacturing processes: Application case studies in Brazilian industry. Journal of Cleaner Production, 153, 405–416. doi:10.1016/j.jclepro.2016.12.072
  • Kato, I., & Smalley, A. (2011). Toyota kaizen methods six steps to improvement. New York, NY: Productivity Press.
  • Kharismawati, A., & Herliansyah, M. K. (2016, October). Implementasi lean healthcare pada pasien BPJS rawat jalan di rumah sakit bethesda yogyakarta [Implementation of lean healthcare in outpatient of BPJS at bethesda hospital yogyakarta]. Proceeding SENTI 2016 (pp. 408–417), Yogyakarta, Indonesia.
  • Lasa, I. S., Castro, R. D., & Laburu, C. O. (2009). Extent of the use of Lean concepts proposed for a value stream mapping application. Production Planning & Control, 20, 82–98. doi:10.1080/09537280802685322
  • Magnier, P. (2003). Lean flow mapping -module LFM101-value stream mapping. Lean Flow Consulting. Retrieved from https://www.leanflowconsulting.fr/xLFM101_201US.pdf.
  • Miranda, F. A. A. (2011, June) Application of work sampling and ECRS (eliminate, combine, re-lay out, and simplify) principles of improvement at TO1 assembly. 21st ASEMEP National Technical Symposium (pp 1-7), Manila, Philippines.
  • Munadi, E. (2017). Furniture, produk berdaya saing yang butuh perhatian. In Info komoditi furniture, (edisi pertama, Bab I, hal.1), (Furniture, competitive products that need attention. In Info commodity furniture, (1st ed, Chapter I, pp. 1). Jakarta: Badan Pengkajian dan Pengembangan Perdagangan Kementerian Perdagangan Republik Indonesia.
  • Mundel, M. E. (1970). Motion and time study: Principles & practices. New Delhi: Prentice-Hall Of India Private Ltd.
  • Niebel, B., & Freivalds, A. (2003). Methods, standards, and work design, 11th ed. USA: McGraw-Hill.
  • Nurcahyo, D. I., & Hartono, G. (2012). Optimalisasi beban kerja dan standarisasi elemen kerja untuk meingkatkan efisiensi proses finishing part outer door di PT TMMIN [Workload optimization and standardization work to improve work efficiency in finishing outer door process in TMMIN company]. Journal of INASEA, 3, 124–131.
  • Ohno, T. (1988). Toyota production system, beyond large scale production. Portland, Oregon: Productivity Press.
  • Pujiati, R. (2017). Produksi furnitur indonesia. In Info komoditi furnitur (edisi pertama, Bab II, hal. 22). (Indonesian furniture production. In Info commodity furniture, (1st ed, Chapter II, pp. 22). Jakarta: Badan Pengkajian dan Pengembangan Perdagangan. Kementerian Perdagangan Republik Indonesia.
  • Rahani, A. R., & Ashraf, A. M. (2012). Production flow analysis through value stream mapping: A lean manufacturing process case study. Procedia Engineering, 41, 1727–1734. doi:10.1016/j.proeng.2012.07.375
  • Romero, D., & Chávez, Z. (2011, July). Use of value stream mapping tools for manufacturing systems redesign. Proceedings of the World Congress on Engineering 2011 (Vol 1), London, U.K.
  • Suhardi, B., Sari, A. P., & Laksono, P. W. (2016). Implementation of standardization work to improve productivity in indonesian furniture industry. Journal of Engineering and Applied Sciences, 11(12), 2602–2606.
  • Taj, S. (2008). Lean manufacturing performance in China: Assessment of 65 manufacturing plants. Journal of Manufacturing Technology Management, 19, 217–234. doi:10.1108/17410380810847927
  • Woehrle, S. L., & Abou-Shady, L. (2010). Using dynamic value stream mapping and lean accounting box scores to support lean implementation. American Journal of Business Education, 3, 8.