1,063
Views
11
CrossRef citations to date
0
Altmetric
Scheduling & Logistics

Identifying and mitigating supply chain risks using fault tree optimization

, , &
Pages 236-254 | Received 25 Feb 2018, Accepted 23 May 2019, Published online: 29 Jul 2019

References

  • Aboulafia, R. (2017) Trends and themes in the aircraft market. Technical report, Teal Group, Society of Manufacturing Engineers. Available at https://advancedmanufacturing.org/trends-themes-aircraft-market-2/
  • Akgün, İ., Gümüşbuğa, F. and Tansel, B. (2015) Risk based facility location by using fault tree analysis in disaster management. Omega, 52, 168–179.
  • Andrews, J.D. and Dunnett, S.J. (2000) Event-tree analysis using binary decision diagrams. IEEE Transactions on Reliability, 49(2), 230–238.
  • Andrews, J.D. and Rementy, R. (2005) Fault tree conversation to binary decision diagrams. Presented at the 23rd International System Safety Conference, San Diego, CA.
  • Anthony Cox L. (2008) What’s wrong with risk matrices? Risk Analysis, 28(2), 497–512.
  • Aqlan, F. and Lam, S. (2015a) Supply chain risk modelling and mitigation. International Journal of Production Research, 53(18)1–17.
  • Aqlan, F. and Lam, S.S. (2015b) A fuzzy-based integrated framework for supply chain risk assessment. International Journal of Production Economics, 161, 54–63.
  • Babich, V. (2006) Vulnerable options in supply chains: Effects of supplier competition. Naval Research Logistics, 53(7), 656–673.
  • Babich, V. (2010) Independence of capacity ordering and financial subsidies to risky suppliers. Manufacturing & Service Operations Management, 12(4), 583–607.
  • Babich, V., Burnetas, A.N. and Ritchken, P.H. (2007) Competition and diversification effects in supply chains with supplier default risk. Manufacturing & Service Operations Management, 9(2), 123–146.
  • British Broadcasting Corporation (BBC). 2014 (February 26). How to build a nuclear submarine. Available at http://www.bbc.com/future/story/20140226-how-to-build-a-nuclear-submarine
  • Benyoucef, L., Xie, X. and Tanonkou, G.A. (2013) Supply chain network design with unreliable suppliers: A Lagrangian relaxation-based approach. International Journal of Production Research, 51(21), 6435–6454.
  • Bogataj, D., Aver, B. and Bogataj, M. (2016) Supply chain risk at simultaneous robust perturbations. International Journal of Production Economics. 181, 68–78.
  • Chen, C.-T., Lin, C.-T. and Huang, S.-F. (2006) A fuzzy approach for supplier evaluation and selection in supply chain management. International Journal of Production Economics, 102(2), 289–301.
  • Chopra, S., Reinhardt, G. and Mohan, U. (2007). The importance of decoupling recurrent and disruption risks in a supply chain. Naval Research Logistics, 54(5), 544–555.
  • Cui, T., Ouyang, Y. and Shen, Z.-J.M. (2010) Reliable facility location design under the risk of disruptions. Operations Research, 58(4), 998–1011.
  • Czyzyk, J., Mesnier, M.P. and Moré, J.J. (1998). The NEOS server. IEEE Computational Science and Engineering, 5(3), 68–75.
  • Dolan, E.D. (2001). NEOS Server 4.0 administrative guide. arXiv preprint cs/0107034.
  • Dyble, J. (2018). Global power generation construction project market worth 4.78 tn. Construction Global. Available at https://www.constructionglobal.com/major-projects/global-power-generation-construction-project-market-worth-478tn
  • Fahimnia, B., Tang, C.S., Davarzani, H. and Sarkis, J. (2015) Quantitative models for managing supply chain risks: A review. European Journal of Operational Research, 247(1), 1–15.
  • Geaney, S., Jackson, R. and Weissmann, S. (2015) Industry study: Final report shipbuilding. Tech. rept. The Dwight D. Eisenhower School for National Security and Resource Strategy, Published by National Defense University, Washington, D.C.
  • Ghodsypour, S.H. and O’Brien, C. (1998) A decision support system for supplier selection using an integrated analytic hierarchy process and linear programming. International Journal of Production Economics, 56, 199–212.
  • Goh, M., Lim, J.Y.S. and Meng, F. (2007) A stochastic model for risk management in global supply chain networks. European Journal of Operational Research, 182(1), 164–173.
  • Gropp, W. and Moré, J. (1997) Optimization environments and the NEOS server. Approximation Theory and Optimization, 167–182.
  • Hishamuddin, H., Sarker, R.A. and Essam, D. (2012) A disruption recovery model for a single stage production-inventory system. European Journal of Operational Research, 222(3), 464–473.
  • Ivanov, D., Dolgui, A. and Sokolov, B. (2015) Supply chain design with disruption considerations: Review of research streams on the ripple effect in the supply chain. IFAC-PapersOnLine, 48(3), 1700–1707.
  • Juttner, U., Peck, H. and Christopher, M. (2003) Supply chain risk management: Outlining agenda for future research. The International Journal of Logistics Management, 6(4), 197–210.
  • Karsak, E.E. and Dursun, M. (2015) An integrated fuzzy MCDM approach for supplier evaluation and selection. Computers & Industrial Engineering, 82, 82–93.
  • Kleindorfer, P.R. and Saad, G.H. (2005) Managing disruption risks in supply chains. Production and Operations Management, 14(1), 53–68.
  • Klimov, R. and Merkuryev, Y. (2008) Simulation model for supply chain reliability evaluation. Technological and Economic Development of Economy, 14(3), 300–311.
  • Lee, A.H.I. (2009) A fuzzy supplier selection model with the consideration of benefits, opportunities, costs and risks. Expert Systems with Applications, 36(2), 2879–2893.
  • Lim, M., Daskin, M.S., Bassamboo, A. and Chopra, S. (2010) A facility reliability problem: Formulation, properties, and algorithm. Naval Research Logistics, 57 (1), 58–70.
  • Lindhe, A., Rosén, L., Norberg, T. and Bergstedt, O. (2009) Fault tree analysis for integrated and probabilistic risk analysis of drinking water systems. Water Research, 43(6), 1641–1653.
  • Losada, C., Scaparra, M.P., Church, R.L. and Daskin, M.S. (2012) The stochastic interdiction median problem with disruption intensity levels. Annals of Operations Research, 201(1), 345–365.
  • MacKenzie, C.A., Barker, K. and Grant, F.H. (2012) Evaluating the consequences of an inland waterway port closure with a dynamic multiregional interdependence model. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans, 42(2), 359–370.
  • MacKenzie, C.A., Barker, K. and Santos, J.R. (2014) Modeling a severe supply chain disruption and post-disaster decision making with application to the Japanese earthquake and tsunami. IIE Transactions, 46(12), 1243–1260.
  • Madadi, A.R., Kurz, M.E., Mason, S.J. and Taaffe, K.M. (2014) Supply chain design under quality disruptions and tainted materials delivery. Transportation Research Part E: Logistics and Transportation Review, 67, 105–123.
  • Paul, S.K., Sarker, R. and Daryl, D. (2016) Managing risk and disruption in production-inventory and supply chain systems: A review. Journal of Industrial and Management Optimization, 12(3), 1009–1029.
  • Qazi, A., Quigley, J. and Dickson, A. (2015) Supply chain risk management: Systematic literature review and a conceptual framework for capturing interdependencies between risks, in Proceedings of the International Conference on Industrial Engineering and Operations Management, IEEE Press, Piscataway, NJ, pp. 1–13.
  • Rafiei, M, Mohammadi, M. and Torabi, S. (2013) Reliable multi period multi product supply chain design with facility disruption. Decision Science Letters, 2(2), 81–94.
  • Remenyte-Prescott, R. and Andrews, J.D. (2007) An enhanced component connection method for conversion of fault trees to binary decision diagrams. Reliability Engineering and Safety System, 93, 1543–1550.
  • Rosenberg, L. (1996) Algorithm for finding minimal cut sets in a fault tree. Reliability Engineering & System Safety, 53(1), 67–71.
  • Sawik, T. (2011) Selection of a dynamic supply portfolio in make-to-order environment withrisks. Computers & Operations Research, 38(4), 782–796.
  • Sawik, T. (2016) Integrated supply, production and distribution scheduling under disruption risks. Omega, 62, 131–144.
  • Schmitt, A. and Singh, M. (2009) Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation, in Proceedings of the 2009 Winter Simulation Conference, IEEE Press, Piscataway, NJ, pp. 1237–1248.
  • Sherwin, M.D., Medal, H.R. and Lapp, S.A. (2016) Proactive cost-effective identification and mitigation of supply delay risks in a low volume high value supply chain using fault-tree analysis. International Journal of Production Economics, 175, 153–163.
  • Simchi-Levi, D., Schmidt, W. and Wei, Y. (2014) From superstorms to factory fires managing unpredictable supply-chain disruptions. Harvard Business Review, 92(1-2), 96–101.
  • Simchi-Levi, D., Schmidt, W., Wei, Y., Zhang, P.Y., Combs, K., Ge, Y., Gusikhin, O., Sanders, M. and Zhang, D. (2015) Identifying risks and mitigating disruptions in the automotive supply chain. Interfaces, 45(5), 375–390.
  • Sinnamon, R.M. and Andrews, J.D. (1996) Fault tree analysis and binary decision diagrams. in Proceedings of the International Symposium on Product Quality and Integrity, IEEE Press, Piscataway, NJ, pp. 215–222.
  • Sinnamon, R.M. and Andrews, J.D. (1997) Improved accuracy in quantitative fault tree analysis. Quality and Reliability Engineering International, 13(5), 285–292.
  • Snyder, L.V. (2006) Facility location under uncertainty: A review. IIE Transactions, 38(7), 547–564.
  • Snyder, L.V. and Daskin, M. (2005) Reliability models for facility location: The expected failure cost case. Transporation Science, 39(3), 400–416.
  • Snyder, L.V., Atan, Z., Peng, P., Rong, Y., Schmitt, A.J. and Sinsoysal, B. (2016) OR/MS models for supply chain disruptions: A review. IIE Transactions, 48(2), 89–109.
  • Sodhi, M.S., Son, B.-G. and Tang, C.S. (2012) Researchers’ perspectives on supply chain risk management. Production and Operations Management, 21(1), 1–13.
  • Sohn, S.Y. and Choi, I.S. (2001) Fuzzy QFD for supply chain management with reliability consideration. Reliability Engineering & System Safety, 72(3), 327–334.
  • Tang, O., Matsukawa, H. and Nakashima, K. (2012) Supply chain risk management. International Journal of Production Economics, 139(1), 1–2.
  • Tomlin, B. (2006) On the value of mitigation and contingency strategies for managing supply chain disruption risks. Management Science, 52(5), 639–657.
  • USBLS. (2015, May). Occupational employment and wages-May 2014. http://www.bls.gov/oes/current/oes172141.htm. (accessed July 25, 2015).
  • USNRC. (2015, January) The pressurized water reactor (PWR): How nuclear reactors work. https://www.nrc.gov/reactors/pwrs.html. (accessed June 1, 2017).
  • USNRC. (2016, June). The pressurized water reactor (PWR). https://www.nrc.gov/reading-rm/basic-ref/students/animated-pwr.html. (accessed June 1, 2017).
  • Vesely, B. (2002) Fault Tree Analysis (FTA): Concepts and Applications. NASA Headquarters, Washington, DC.
  • Veseley, W., Dugan, J., Fragole, J., Minarik, J. and Railsback, J. (2002) Fault Tree Handbook With Aerospace Applications. NASA Office of Safety and Mission Assurance, NASA Headquarters, Washington DC.
  • Wilson, M.C. (2007) The impact of transportation disruptions on supply chain performance. Transportation Research Part E: Logistics and Transportation Review, 43(4), 295–320.
  • WNA. (2018) World nuclear performance report. Tech. rept. World Nuclear Association, London.
  • Xia, Y., Yang, M.-H., Golany, B., Gilbert, S.M. and Yu, G. (2004) Real-time disruption management in a two-stage production and inventory system. IIE Transactions, 36(2), 111–125.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.