1,090
Views
0
CrossRef citations to date
0
Altmetric
Article

Hoist scheduling for an anodizing plant at an extrusion company

&
Pages 93-104 | Received 28 Nov 2018, Accepted 08 Feb 2020, Published online: 01 Apr 2020

References

  • Basán, N. P., Pulido, R., Cóccola, M. E., & Méndez, C. A. (2017). Aerospace manufacturing industry: A simulation-based decision support framework for the scheduling of complex hoist lines. Iberoamerican Journal of Industrial Engineering, 9(17), 100–117.
  • Bloch, C., Manier, M. A., Baptiste, P., & Varnier, C. (2010). Hoist scheduling problem. Production Scheduling, 193–231.
  • Che, A., Kats, V., & Levner, E. (2017). An efficient bicriteria algorithm for stable robotic flow shop scheduling. European Journal of Operational Research, 260(3), 964–971. doi:10.1016/j.ejor.2017.01.033
  • El Amraoui, A., Manier, M. A., El Moudni, A., & Benrejeb, M. (2013). A genetic algorithm approach for a single hoist scheduling problem with time windows constraints. Engineering Applications of Artificial Intelligence, 26(7), 1761–1771. doi:10.1016/j.engappai.2013.02.004
  • Elmi, A., & Topaloglu, S. (2013). A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots. Computers & Operations Research, 40(10), 2543–2555. doi:10.1016/j.cor.2013.01.024
  • Elmi, A., & Topaloglu, S. (2017). Multi-degree cyclic flow shop robotic cell scheduling problem with multiple robots. International Journal of Computer Integrated Manufacturing, 30(8), 805–821. doi:10.1080/0951192X.2016.1210231
  • Feng, J., Che, A., & Chu, C. (2015). Dynamic hoist scheduling problem with multi-capacity reentrant machines: A mixed integer programming approach. Computers & Industrial Engineering, 87, 611–620. doi:10.1016/j.cie.2015.06.004
  • Lei, W., Manier, H., Manier, M. A., & Wang, X. (2017). A hybrid quantum evolutionary algorithm with improved decoding scheme for a robotic flow shop scheduling problem. Mathematical Problems in Engineering, 2017, 1–13. doi:10.1155/2017/3064724
  • Liu, C., Zhao, C., & Xu, Q. (2012). Integration of electroplating process design and operation for simultaneous productivity maximization, energy saving, and freshwater minimization. Chemical Engineering Science, 68(1), 202–214. doi:10.1016/j.ces.2011.09.024
  • Mateo Doll, M., Manier, M. A., & Companys Pascual, R. (2015). A procedure based on branch-and-bound for the Cyclic Hoist Scheduling Problem with n types of product. A: International Conference on Industrial Engineering and Industrial Management. International Conference on Industrial Engineering and Operations Management. International IIE Conference. “Engineering Systems and Networks: the way ahead for industrial engineering and operations management”. Aveiro: 2015, p. 1–8.
  • Pantusavase, K., & Hassamontr, J. (2015). Enumerative search for crane schedule in anodizing operations. World Academy of Science, Engineering and Technology, International Journal of Mechanical. Aerospace, Industrial, Mechatronic and Manufacturing Engineering, 9(6), 1052–1058.
  • Paul, H. J., Bierwirth, C., & Kopfer, H. (2007). A heuristic scheduling procedure for multi-item hoist production lines. International Journal of Production Economics, 105(1), 54–69. doi:10.1016/j.ijpe.2005.11.008
  • Skov, J. (2007). Scheduling of an Anodizing Plant at Bang & Olufsen (Unpublished master thesis). University of Southern Denmark, Odense, Denmark.