Publication Cover
Mining Technology
Transactions of the Institutions of Mining and Metallurgy: Section A
Volume 120, 2011 - Issue 4
86
Views
0
CrossRef citations to date
0
Altmetric
Letter to the editor

Letter to the editor

Pages 185-189 | Received 19 Jul 2011, Accepted 14 Aug 2011, Published online: 12 Nov 2013

References

  • Barton N, Lien R, Lunde J. 1974. Engineering classification of rock masses for the design of rock support, Rock Mech., 6, (4), 189–236.
  • Bawden WF. 1993. The use of rock mechanics principles in Canadian hard rock mine design, in Comprehensive rock engineering: principles practice and projects, (ed. , Hudson J A), 347–290; Oxford, Pergamon Press.
  • Caceres CAB. 2005. Effect of delayed backfill on open stope mining methods, MSc thesis, University of British Columbia, Vancouver, BC, Canada.
  • Clark LM. 1998. Minimizing dilution in open stope mining with focus on stope design and narrow vein longhole blasting, MSc thesis, University of British Columbia, Vancouver, BC, Canada.
  • Clark LM, Pakalnis RC. 1997. An empirical approach for estimating unplanned dilution from open stope hangingwalls and footwalls, Proc. 99th CIM Annu. General Meet., Vancouver, BC, Canada, April 1997, CIM, Paper #TAM1-A01, 33 .
  • Cristescu ND, Hunsche U. 1998. Time effects in rock mechanics; Chichester, New York, John Wiley & Sons.
  • Daemen JJK. , Fuenkajorn K, Phien-wej N2009. On the importance, and difficulty, of dealing with the time dependency of engineered structures in, on, or with hard rock, in Rock mechanics, (ed. , ed), 3–34; Pataya, Suranaree University of Technology.
  • Diederichs MS, Kaiser PK. 1996. Rock instability and risk analyses in open stope mine design, Can. Geotech. J., 33, 431–439.
  • Dominy SC, Annels A, Camm GS, Wheeler P, Barr SP. 1999. Geology in the resource and reserve estimation of narrow vein deposits, Explor. Geol., 6, (4), 317–333.
  • Dominy SC, Camm GS. 1996. The nature and exploitation of narrow tin veins: a case study from South Crofty mine, Cornwall, U. K., Brit. Min., 57, 150–170.
  • Bay Mining Ltd Echo, Pakalnis RC and Associates. 1998. Development of stope design guidelines for narrow vein open stope mining in terms of minimizing dilution, CANMET project no. 5-1228, Ottawa.
  • Germain P, Hadjigeorgiou J, Lesard JF. 1996. On the relationship between stability prediction and observed stope overbreak, Proc. 2nd North Am. Rock Mech. Symp., Montreal, Que, Canada, NARMS, 227–283June 1996,
  • Hadjigeorgiou J, Leclaire J, Potvin Y. 1995. An update of the stability graph method of open stope design, Proc. 97th CIM Annu. General Meet., Halifax, NS, Canada, May 1995, CIM, 157–161.
  • Hutchinson JD, Diederichs MS. 1996. Cablebolting in underground mines, 210; Richmond, BC, Bitech Publishers.
  • Lizotte YC. 1993. Narrow vein blasthole stoping: current drilling and blasting technology, Project report to the Canada Northwest Territories Mineral Development Agreement, Ottawa.
  • Løset F. 1999. Use of the Q-system in weak rock masses, NGI report no. 592048-1, NGI, Oslo, Norway.
  • Martin CD. 1997. Seventeenth Canadian geotechnical colloquium: the effect of cohesion loss and stress path on brittle rock strength, Can. Geotech. J., 34, 698–725.
  • Mathews KE, Hoek E, Wyllie DC, Stewart SBV. 1981. Prediction of stable excavation spans at depths below 1000 m in hard rock mines, Report to CANMET, DSS serial no. OSQ80-00081, DSS, Vancouver, BC, Canada.
  • Mawdesley C, Trueman R, Whiten W. 2001. Extending the Mathews stability graph for open-stope design, Trans. Inst. Min. Metall. A, 110, A27–A39.
  • Nickson SD. 1992. Cable support guidelines for underground hard rock mine operations, MSc thesis, University of British Columbia, Vancouver, BC, Canada.
  • Palmström A. 1982. The volumetric joint count – a useful and simple measure of the degree of rock mass jointing, Proc. IAEG Con, V.221–V.228; New Delhi, IAEG.
  • Potvin Y. 1988. Empirical open stope design in Canada, PhD thesis, University of British Columbia, Vancouver, BC, Canada.
  • Potvin Y, Milne D. , Kaiser P K, McCreath D R1992. Empirical cable bolt support design, in Rock support, (ed. , ed), 269–275; Rotterdam, A.A., Balkema.
  • Quesnel WJF, Ley GMM. 1991. The development of mine design guidelines for dilution control, Bousque Div., no. 1 Shaft, Lac Minerals, Ltd, Proc. 93rd CIM Annu. General Meet., Vancouver, BC, Canada, April 1991, CIM, 12.
  • Ran J. 2002. Hanging wall sloughing mechanism in open stope mining, CIM Bull., 95, 74–77.
  • Reschke AE, Romanowski J. 1993. The success and limitations of Mathews analysis for open stope design at HBMS, Flin Flon operations, Proc. 95th CIM Annu. General Meet., 13; Calgary, Alta, CIM.
  • Stewart PC, Trueman R. 2001. The extended Mathews stability graph: quantifying case history requirements and site specific effects, Proc. Int. Symp. on ‘Mining techniques of narrow vein deposits’, 85–92; Val’dor, Que, CIM.
  • Stewart PC, Trueman R. 2003. Applying the extended Mathews stability graph: Quantifying case history requirements and site-specific effects, Proc. 1st AGCM Conf., Sydney, Australia, November 2003, AGCM, 55–61.
  • Stewart SBV, Forsyth WW. 1995. The Mathews method for open stope design, CIM Bull., 88, 45–53.
  • Suorineni FT. 1998. Effects of faults and stress on open stope design, PhD thesis, University of Waterloo, Waterloo, Ont., Canada.
  • Suorineni FT. 2010. The stability graph after three decades in use: experiences and the way forward, Int. J. Min. Reclam. Environ., 24, (4), 307–339.
  • Suorineni FT, Kaiser PK2002Dependence of stand-up time of stopes on size and rock quality Proc. 5th North Am. Rock Mech. Symp. and 17th Tunnel. Assoc. Can. Conf.(, Hammah R, et al..), 133–140; Toronto, Ont., University of Toronto Press.
  • Suorineni FT, Henning JG, Kaiser PK. 2001a. Narrow-vein mining experiences at Ashanti: case study, Proc. Int. Symp. on ‘Mining techniques of narrow-vein deposits’, Val’dor, Que., Canada, October 2001, CIM, 57–62.
  • Suorineni FT, Henning JG, Kaiser PK. 2008. Safe rapid drifting – support selection, Tunnel. Underground Space Technol., 23, 682–699.
  • Suorineni FT, Tannant DD, Kaiser PK. 1999a. Determination of fault-related sloughage in open stopes, Int. J. Rock Mech. Min. Sci., 36, 891–906.
  • Suorineni FT, Tannant DD, Kaiser PK. 1999b. Fault factor for the stability graph method of open-stope design, Trans. Inst. Min. Metall. A, 108, A92–A104.
  • Suorineni FT, Tannant DD, Kaiser PK, Dusseault MB. 2001b. Incorporation of a fault factor into the stability graph method: Kidd mine case studies, Miner. Res. Eng., 10, 3–37.
  • Tatman CR. , Hustrulid W A, Bullock R L2001. Mining dilution in moderate to narrow width deposits, in Underground mining methods – engineering fundamentals and international case studies, (ed. , ed), Chap. 70, 615–626; Littelton, CO, SME.
  • Trueman R, Mawdesley C. 2003. Predicting cave initiation and propagation, CIM Bull., 96, 54–59.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.